TVA EMPIhYEE CONCERNS REPORT NUMBER: WP-22-SQN SPECIAL PROGRAM REPORT TYPE: Welding Project REVISION NUMBER:
3 TITLE: Inadequate Weld Procedure REASON FOR REVISION: N/A PREPARATION
~
PREPARED BY:
Original Signed by I. B. James 1-8-87 SIGNATURE DATE REVIEWS PEER:
Original Signed by J. E. Rose 1-8-87 SIGNATURE DATE
.tbl jI$$ sd
/kNh?
TECHNICAL REVIEW ONLY TAS-d SIGNATURE DATE CONCURRENCES Original Signed by CEG-H:
J. F. Lewis 1-12-87 SRP:
M I-20-87 SIGNATURE DATE SIGNATURE
- DATE APPROVED BY-
', ft l-$0 *bl N/A ECSP MiNAGER DATE '
MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
- SRP Secretary's signature denotes SRP concurrences are in files.
2242T 8702030292 870126 PDR ADOCK 05000327 p
WELDING PROJECT EMPLOYEE CONCERN EVALUATION REPORT REPORT NUMBER: WP-22-SQN, R3 DATE: /-8-87 SUBJECT INADE0UATE WELO PROCEDURE CONCERN (S) CONSIDERED:
JLH-85-003 PREPARED BY The 74nu2 h/. SO
/-8I[
, OC, WP REVIEWED BY\\. 6..
I/R/e7
, OC, WP o.
REVIEWED BY ad,
/o!87
, QA, WP G
C 1/12/87, CEG-H, WELDING REVIEWED BY h, g [ M m j,
APPROVED BY
, PROGRAM MANAGER Revision 1 Incorporated SRP coments.
Revision 2 Incorporated SRP coments.
Revision 3 General Revision of Report.
08430 I
Ii
4 EMPLOYEE CONCERN
SUMMARY
SHEET Report Number:
WP-22-SON, R3 lR3 Report
Title:
INADEQUATE WELD PROCEDURE I. CONCERN CONSIDERED:
JLH-85-003 II. ISSUES INVOLVED 1.
Weld procedure utilized for welding gamma plugs in piping is I
inadequate for the joint in question and/or failure to include IR3 or reference a weld detail drawing in the work package.
I III. STATEMENT ON CONCERN / ISSUE VALIDITY Validity: Y X
.N
, Substantiated: Y X
.N IV. EFFECT ON HARDWARE AND/OR PROGRAM None V. JUSTIFICATION:
The original assigned weld procedure was adequate for the joint l
configuration of gamma plug weld to pipe as shown on the Maintenance lR3 l
Request (MR).
VI. RECOMMENDATION AND/OR CORRECTIVE ACTION NEEDED Pipe Fabrication Institute Drawing, ES-16, was noted on the data sheet, l
attached to the MR, by Engineering. This is an approved weld joint lR3 configuration drawing for TVA.
l l
l l
VII. REINSPECTION NEEDED:
Y
,N X
t l
VIII. ISSUE CLOSURE Closure is based on this report.
l Page 1 of 2 l
\\
t i
'IX. ATTACHMENTS 1.
Text of Employee Concern - JLH-85-003 4
2.
Form, " Employee Concern Program" 3.
Onsite Employee Concern Impact Evaluation I
i -
4 1-I 1
i 1
i i
i 4
i 4
4 1
1 I
i
.I I
i J
.i l
i i
l
(
Page 2 of 2 1
4
- - m _,.,,.- -,..--,.
-..y-....
EMPLOYEE CONCERN Report Number: WP-22-SON, R3 lR3 Report
Title:
INADEOUATE WELD PROCEDURE I.
SCOPE OF EVALUATION This engineering analysis covers the following SQN concern:
JLH-85-003.
lR3 II.
ISSUE (S) ADDRESSED BY CONCERN Inadequate weld procedure and/or failure to include or reference a weld detail drawing in the work package.
III. CONCERN VALIDITY OR SUBSTANTIATION The Welding Project (WP) has investigated this concern and determined l
that the concern as stated is misleading. The concern was that there I
was not an approved drawing, shown or referenced, for the weld joint I
configuration being used for welding gamma plugs in piping. The weld l
procedure shown on the MR was adequate.
l l
The action taken stated on the concern report is also misleading. The l
weld procedure was not changed on the data sheet. Engineering added a i
note to the data sheet stating " Joint design is for TVA approved standard i
drawing, Pipe Fabrication Institute (PFI) ES-16, (Access Hole and Plug IR3 For Radiograph Access)." This drawing provided the reference required l
by the inspector to determine that TVA had an approved weld joint I
configuration, for the joint in question, that was to be inspected on i
l The statements noted above are based on discussions with the Supervisor l
that initiated the "Onsite Employee Concern Impact Evaluation" and I
the Quality Engineer that resolved the concern with the employee.
l The investigation did substantiate the concern. TVA has an approved weld joint configuration for the gamma plug designs used. However, the 4
Maintenance Request was revised to reference the joint configuration used to resolve the issue. Based upon this investigation, the issue addressed by this employee concern is closed.
l 4
i Page 1 of 1
ATTACHMEN1 1 Page 1 of 1 08/07/86 (EMPLOYEE CONCERNS)
PAGE:
1 11:32:07 CAT ISSUE PLANl PRIOR 11Y ORG QTC EGG INSP GD RD GD 10
---CONCE R N--
WE S
582 JLH-85-003 KEYWORDS: ADEQUACY GAMMA PLUG PROCEDURE THIS CONCERN WAS NOT DOCUMENTED PER SQA166 BUT HAS BEEN INCLUDED IN THE EMPLOYEE CONCERN LOG.
A WELD PROCEDURE UTILIZED FOR WELDING GAMMA PLUGS IN PIPING IS ADEQUATE FOR JOINT IN QUESTION.
IR:
STAT:
RC: WP-22-SQN TECHNICAL COMMENTARY:
NOTE: Text of concern was typed as written. The word adequate should have boon inadequate.
Soo text of Site Employco Concern Impact Evaluation Summary.
I
_.a
PAGE 1 0F 1 EMPLOYEE CONCERNS PROGRAM
^
Concern Number:
JLH-85-OO3 Confidentiality:
Nuclear Safety Related:
Yes Feedback Desired:
Supervisor Notified:
Unit (s):
Plant:
SQN Concern: A weld procedure utilized for welding gamma plugs.in piping is adequate for the joint in question.
o l
.~
'\\
l I
ECTG has assigned responsibility for investigation of the above concern to:
SC
]
- pPARED
'7 DATE l
1 d1V/
b Yh PfROVED gg DATE m
f-0976T
%4
(
l i
l l
1
PAbt
' Ur 3
I Sterdard Prcetics Page 14 SQA166 Attachment B.1 Rev. 4
.- n DNSITE l'IPLOYEE CONCERN IMPACT EVALUATION
- O ' E 7L H - 8 5 - co-f -
Ecployee Concern v 1.
Concern description (This concern was not documented per SQA166 but h".-
been included in the employee concern log.) A we5d procedure utilized for veldine camma ninas in nininn is adequate for the 1oint in cuestion.
2.
Assume concern is substantiated, would this concern icpai t safe plaat operation, startup, or shutdown (yes or no)
Yes 3.
If yes (2), date for completion of investigation is 11/8/85 4.
If answer to 2 is yes notify plant management N/A corrected irmnediately /
Manager Notified Date o
5.
Prepared by John L.11amilton f_ 1/31/86 Date
^
Distribution Original: Employee Concern Files, RES
,c oo O
e
/*
G e
M7 """ "Mr&rr-w- --~ e usaw.
PAGE 2
0F i
T' S
j VS, "
OU
.~
E
. - ~
b
-_,b e
-Ldc db u.elA_que_do.re.
M.ij 6
p!vg_s (~
lj Q
&c wei gw$#
p g,
oa d
me u
.__ pg g
3 :
2
.F
../.3 k.dd.hKb~-
_j YO IT ht._ c
- L ML cusliAi
.}l bU 8
c..s d _..
/l fu.dLv
-t w eo
_. v ee 2
i _..
_..._..._._mueAt.I ;
- v.. _
- W
'-~ i u u t g. d m 4
_mc._
eas+
. lg
. M _.
.?....
TVn.
den.
14 It
- >. c.c_ivil.a 9m tat 1_ vdu ed aw k.)
vu 4. L didNb-.Ov-Snyc n &.. Y ls w
w a&Le '
%e <,aba
)l a,I da dA sked L
dd>
L.. m e.. y i
o,~
is
&cLL
-h sd,.t D w'dk.
l'n4sifYJr.~
>Epweek.
4
>4 L
rusiv o%
hL c~ m r
k A,a L-mlda. m j
-L
,~ 7
%,0.~dd dL te.
l w-l 4
- rJc2, R'
u ~. e,r '~
t
)
h d v..s ubak c h u AL
.~L
~
b 4 Luc sd J L
>d,oI'ded l
t a
7
- O e. as * - m tR gQ'yQ Y t%ht J
W b*
e
- (
l
,!f,.
.i b.$
Tb N1 Q sui w.AL p
JAL L
Oc$wtJ f
4 Oh ad eL m
+
dr (0 i-ska u
%r d&
Qv ak. L rudA~g A
L qLm g
,j j ;.
b eh h
G3 c_m. o.+,
~
slu*
sdk ese M Li k
is r Fj i
OL Wc sw up G
tc Qwua.
s i
i fM' j
a..
I e
,, s y.e.a 'e -
i a
I l
9, 1
e 1
I I
l l
1 i
,I ab %. g
.,v.-,
_