Partially Withheld Response to Re Allegation Concerning Employees.Investigation to Determine Lapses in Security of Operations Underway.Rept on Investigation Will Be Forwarded.Resumes of Involved Persons Encl.W/O Resumes
ML20212R546
Person / Time
Site: Duane Arnold, 05000000
Issue date: 03/08/1983
From: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20212R483 List:
References
FOIA-84-827 NUDOCS 8702020705
Download: ML20212R546 (3)


Text

~ .

lowa Electric 1.ight and Power Company uELN March 8, 1983 nuwa Mr. J. A. Hind, Director .

Division of Radiological and Material Safety Programs NRC Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Hind:

This is in response to your letter of February 10, 1983 regarding a sworn allegation regarding employees at the Duane Arnold Energy Centor.

My staf f have determined that the persons are no longer employed by le:. Dr. Tuthill has informed you by telephone of their tenure (s) with us and other data that was deemed useful to you. You are welcome to examine our security files concerning these people. Please make any inquiries through Dr. Tuthill whom I have placed in charge of this in-vestigation and others of this kind that may eventuate.

The investigation + determine possible lapses in the security of operations and of personnel during the tenure of the persons mentioned in your letter is going on. Deter-mination of the facts of the allegation insofar as they can be determined and a re-examination of Allied Nuclear's security clearance system then and now is also in progress. I expect this phase of investigation to require some time as some of our people will have to travel to California for this work.

The final phase of the treatment of this matter will be an evaluation of the information obtained in the above in-vestigation and the identification of root causes and long-term corrective actions.

I will review Dr. Tuthill's report and forward it as soon as it is available. I want to share my doubt that this can be accomplished adequately before the March 12, 1983 deadline. I will keep you informed of our progress.

8702020705 870129 PDR FOIA HEATH 84-827 PDR M M F- 2.

  • 1882 A CENTURY OF SERVICE - 1982
  • u MAR 101_q General ofite
  • Po. Box 351
  • Cedar Rapids, Iowa $340C

/ .

Mr. J. A. Hind March 8, 1983 Also for your information I am sending you the resumes of the individuals involved. This information was supplied to us by Allied Nuclear.

Sincerely, p  !

Lee Liu President l

6 l'

ROUTING AND TRANSMITTAL SLIP 3/16/83

70. (Name, o f,ce r symbol, room number, initials Date buildung. Agency / Post)
1. L. Cobb 2.

3.

4.

E.

Action File Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circutate For Your information See Me Comment investigate Signature Coordination Justify REMARKS As we discussed, I have informed NSP of previous ec:ployment at their Monticello site.

Also please note that NSP states that is -

I presently at Rancho Seco Station. -

l We will keep you informed of Iowa Electric's progress.

Both ~ and have worked at many nuclear sites. -

DO NOT USe this form as a RECORD of approvals, concurrences, disposats, cisarances, and similar actions FROM:(Name, org, symbol, Ag^ncy/ Post) Room No.-Bldg.

Jack HindO - 6 Phon3 No.2510 s041-102 OFTIONAL FORM 41 (Rev. 7-76)

Prestret>ed try CSA e cre : test o - 1st.trs (tie s rrwa H1 cou 101-11.206 IP

]