Forwards Insp Rept 50-424/86-37 of Readiness Review Module 7 Re Plant Operations & Support.Specific Programs Reviewed by NRC Acceptable & in Compliance W/Applicable Regulatory Requirements.Several Deficiencies Identified
ML20212R514
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/20/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20212R516 List:
References
NUDOCS 8702020689
Download: ML20212R514 (2)


See also: IR 05000424/1986037

Text

,

(Q\\ (03.

g

/

JANgo 997

Georgia Power Company

ATTN: Mr. J. P. O'Reilly,

Senior Vice President

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION OF V0GTLE READINESS REVIEW MODULE 7 PLANT OPERATIONS

AND SUPPORT - REPORT NO. 50-424/86-37

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on January 10, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were also conducted in NRC Bethesda offices, and the findings

from these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and and representa-

tive records, discussions with personnel, observations of activities in progress,

and review of your licensing commitments.

-

This module does not address plant operating Technical Specifications which will

be reviewed separately.

The primary results of module 7 reviews and inspections are provided in the

summary and conclusions sections of the enclosed report. Within the findings

section, several deficiencies are identified. Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the specific programs reviewed by the NRC appear

acceptable and

in

compliance with applicable

regulatory

requirements.

<

Additionally, we have determined that you currently have controls and processes

in place which should assure proper implementation of all programs associated

with plant operations and support and which will be verified during conduct of

the normal Near Term Operating License and Operating Reactor inspection programs.

Should you have any questions concerning this letter, please contact us.

Sincerely,

y or, f

9 9 0er) l

Or cr

y

mt ano /Gc

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

(j20206s9 870120

ADOcg 030004p4 -

O

g(

PDR

Sc cj

-

,

.-

,

a

Georgia Power Company

2

Enclosure:

Inspection Report No. 50-424/86-37

cc w/ enc 1:

C. Whitney, General Manager,

Vogtle Project

R. E. Conway, Senior Vice President &

Project Director

P. D. Rice, Vice President, Project

Engineering

R. H. Pinson, Vice President, Project

Construction

C. W. Hayes, Vogtle Quality

Assurance Manager

G. B. Bockhold, General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

.

l

J. A. Bailey, Project Licensing

Manager'

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

Department of Human Resources

C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bec w/ encl:

(see page 3)

".

',

.

JAN 201987

Georgia Power Company

3

bec w/ encl:

E. Reis, OGC

W. M. Hill, IE

M. Miller, NRR

W. Brach, EDO

M. Sinkule, RII

E. Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

_

'

_

,o d

IE

'E '#

IW N

hu9t[vt

M

(gq2

g (,rm'c

EChr'8'" "'

I//(/ 67

1/(c,/ 8 7

'/M/ 0

RII

RII

W

[h

g]/

4

(

EChristnot:es

MSinkule

VLB ownlee

alke

t

1///S/f

WI /W

Y

Y

Yl lY /

lY

y

37

@/S)

3

/ r>

3/'s/ # 7

Yd'/ # '