APR 171987
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. M. Jacobson
of this office on January 12-14, 28, 29, February 11, 12, 18, 20, 25, 26,
March 3-5, 25, 26 and April 8, 10, 1987, of activities at the Braidwood
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-59 and
NRC Construction Permit No. CPPR-133 and to the discussion of our findings with
Mr. C. W. Schroeder and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
j
Sincerely,
Original Signed by J. J. Harrison
J. J. Harrison, Chief
Engineering Branch
Enclosure: Inspection Reports
No.50-456/87004(DRS);and
No. 50-457/87003(DRS)
See Attached Distribution
7'e.s
II
RII
e
RIII
I
-
t
M
'
i
son /jk
Little
Danielson
,rrison
04/17/87
04/d/87
04////87
04/r\\/87
8704270160 870417
Q\\
{DR
ADOCK 05000456
. - _ _ _ _ _ _ _ _ _ _ _ _
S
.
IU O I 7 1987
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
W. Vahle, Project Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel , Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
J. Moore, OGC
G. Berry, 0GC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
L
'i
.
>
p a:Gu
UNITE 3 STATES
.
[
5.,
NUCLEAR RE2ULATORY COMMISSION
[ *
,
-
$
REGION 111
f
e
'
CLEN ELLYN. ILLINOIS 60937
.,
%,
/
"
- "*
APR 171987
Docket No. 50-456
Docket ho. 50-457
Comonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicagt, IL 60690
Gentlemer.:
This refers to the routine safety inspection conducted by Mr. J. M. Jacobson
of this office on January 12-14, 28, 29, February 11, 12, 18, 20, 25, 26,
March 3-5, 25, 26 and April 8, 10, 1987, of activities at the Braidwood
Statior., Units 1 and 2, authorized by NRC Operating License No. NPF-59 and
NRC Construction Permit No. CPPR-133 and to the discussion of our findings with
Mr. C. K. Schroeder and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examina: ion of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in- the NRC's
Public Document Room.
'
We will gladly discuss any questions you have concerning this inspection.
{
Sincerely,
j
.
4
.
'
J. J. Harrison, Chief ~
Engineering Branch
Enclosure: Inspection Reports
No. 5:-456/87004(DRS); and
No. 53-457/87003(DRS)
i
See Attached Distribution
.
.
1
Commonwealth Edison Company
2
Ad)R 1719B7
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
W. Vahle, Project Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor-
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
i
J. Moore, 0GC
G. Berry, 0GC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
J
l
,
-
-
-
,
,
,,-,
,
-
- - -
--,