Forwards Insp Rept 50-482/86-30 on 861117-20.No Violations or Deviations Noted
ML20212R136
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/21/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20212R137 List:
References
NUDOCS 8702020509
Download: ML20212R136 (2)


See also: IR 05000482/1986030

Text

r:.

l t -.

L .I.,

JAN 2 l 1987

o

-

In Reply Refer To:

Docket: STN 50-482/86-30

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P. O. Box 411

Burlington, Kansas 66839

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

the period November 17-20, 1986, of activities authorized by NRC Operating

License NPF-42 for Wolf Creek Generating Station, and to the discussion of our

findings with Mr. M. G. Williams and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included the radiation protection program f

during the first refueling outage. Within these areas, the inspection I

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented'in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to a previously

identified inspection finding. The status of this item is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ORIGINAL SIGNED BY:

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-482/86-30

cc w/ enclosure: (see next page)

g 3 /

'

RIV:FRPS C:FRPS C:R&SP C:RPB/ C:RPB

REBaer/dp BMurray WLFisher DRHun 9 o

\ /;Q!89

\

/ \V18f I II9/84 ) IU %6 JEGagl)i

1kU

8702020509 870121 / M(o

PDR ADocK 05000482 /pV %\\

G PDR

. , ,

Kansas Gas and Electric Company -2-

cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P. O. Box 411

Burlington, Kansas 66839

Gary Boyer, Plant Manager

Wolf Creek Nuclear Operating Corporation

P. O. Box 411

Burlington, Kansas 66839

Forrest Rhodes, Vice President, Nuclear Operations

Wolf Creek Nuclear Operating Corporation

P. O. Box 411

Burlington, Kansas 66839

Kansas Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RPB Myron Karman, ELD, MNBB (1)
  • RRI R. D. Martin, RA
  • Section Chief (RPB/B) DRSP
  • R&SPB R. P. Warnick, RIII
  • RIV File Resident Inspector, RIII
  • MIS System *RSB
  • RSTS Operator * Project Inspector
  • D. Weiss, LFMB (AR-2015) *R. E. Baer
  • B. Murray *W. L. Fi sher

, R. L. Bangart

  • w/766