April 21, 1987 Docket Nos.: 50-321 and 50-366 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
Subject:
Implementation Schedule for 10 CFR 50.48 Fire Protection Modifications Re: Edwin I. Hatch Nuclear Plant, Units 1 and 2 Ceneric Letter 86-10, " Implementation of Fire Protection Requirements" stated that the NRC would (1) review the dockets of plants covered by 50.48 to deter-mine the schedule deadlines for those plants and (2) inform licensees of those schedule deadlines.
We have reviewed the dockets related to the schedule for implementation of 10 CFR 50.48 for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.
Based on that review, we have determined that the fire protection and alternate or dedicated shutdown system modifications required to meet 10 CFR 50.48 are scheduled to be completed for each unit by the end of the next scheduled refueling outage commencing after November 30, 1986.
It is our understanding that these outages are currently expected to start in late April 1987 for Unit I and in January 1988 for Unit P.
This schedule is consistent with the requirements of 10 CFR 50.48.
Delays in completion of implementation beyond the schedular requirements of 10 CFR 50.48 will be allowed only under the exemption provisions of 10 CFR 50.12 explained in Generic Letter 86-10.
If this schedule is not correct, please contact the NRC Project Manager in writing within 30 days.
In addition, please notify the NRC Project Manager in writing if schedule delays develop and after you have completed the 50.48 modifications.
Sincerely, 8704240085 870421 PDR ADOCK 05000321 F
PDR Steven A. Varga, Director Division of Reactor Projects-I/II cc: See next page
(.DISTRIBUTIONr-DocketJile local PDR NRC PDR PDII 3 Reading BJY5iingblood Reading MDuncan LCrocker ACRS(10)
OGC-Bethesda
'J')g" LCrocker/ rad PDII-3/DRP-I/II PDI[-/DRP-I/II
- PDI, RP-I/II
// t MDdhcan BJV n 41ood 04/ /87 04// 7/87 04/q/37 g
NR 2
GL s
ar y 04'/f/87 04
/d7
<?
Pr. J. P. O'Reilly Edwin I. Hatch Nuclear Plant, j
Georgia Power Company Units Nos. I and 2 Docket Nos.: 50-366/321 CC*
i Bruce W. Chruchill, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
I Washington, D.C.
20037 I
M Mr. L. T. Gucwa Engineering Department 1
Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 t
Nuclear Safety and Compliance Manager I,
Edwin I. Hatch Nuclear Plant j !
Georgia Power Company j
Post Office Box 442 Baxley, Georgia 31513 Mr. Louis B. Long
. Southern Company Services, Inc.
Post Office Box 2625 l
Bimingham, Alabama 35202 l
Resident Inspector i
U.S. Nuclear Regulatory Comission i
Route 1, Post Office Box 279 Baxley, Georgia 31513
)
Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 2900 j
Atlanta, Georgia 30303 i
Mr. Charles H. Badger Office of Planning and Budget Room 610 i
l 270 Washington Street, S.W.
i Atlanta, Georgia 30334 l
i Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources i
270 Washington Street, N.W.
l Atlanta, Georgia 30334 i
Chaiman i
Appling County Commissioners County Courthouse Baxley, Georgia 31513 i
' D-
~ - - -~
-n ~ - - -
.