ML20212P911
| ML20212P911 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/10/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| References | |
| NUDOCS 8703160340 | |
| Download: ML20212P911 (2) | |
Text
q
~
MAR 101987 Docket No. 50-483 i
Union Electric Company ATTN: Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
This is to acknowledge receipt of your letter of February 25, 1987, which transmitted changes to the Callaway Plant Radiological Emergency Response Plan (RERP), Revision 10, as well as Revision 6 to EIP-ZZ-00101, Emergency Action Levels (EALs).
We have completed our review of the submitted changes and have determined that Revision 10 of your Callaway RERP continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of 10 CFR Part 50, Appendix E.
We also noted that you have incorporated into your revised EALs, all 15 items recommended in the attachment to our Inspection Report No. 50-483/86009 and that you have upgraded an EAL classification in Group Six - Radiation Release Events, Item F from a Site Area Emergency to a General Emergency. This was an item of concern from our inspection of January 26-30, 1987, Open Item No. 50-483/87006-01.
Be advised that 10 CFR 50.54(q) requires prior NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review assures no decrease in emergency preparedness effectiveness, then changes to the plan may be made and implemented without prior NRC approval.
In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.
Should you have any questions concerning this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.
Sincerely,
" Original d cr.ed by W.D. Shafer*'
8 IhCK05000483 40 870310 P
W. D. Shafer, Chief F
PDR Emergency Preparedness and Radiological Protection Branch See Attached Distribution A
D0, 0
[3 u)N
\\tr's i1M
/hh RIII RIII' RIII RII Patt rson/ims Snell Forney SWer M
Yll l
N 0
r
,,-...,,,._.____,_..-,r.
,.m
.m m
m.
Union Electric Company 2
HAAG 10 t987 Distribution cc:
A. P. Neuhalfen, Manager Quality Assurance G. Randolph, Plant Manager, Nuclear Operations DCS/RSB(RIDS)
Licensing Fee Management Branch 2
Resident Inspector, RIII Region I\\'
Resident Inspector, Wolf Creek K. Drey Chris R. Rogers, P.E.
Utility Division, Missouri Public Service Commission SNUPPS l
R. LaFreniere, RIII 4
1 l
l f
.,-r-
,,,,,-,-,,,,,-.------,,.,,,---.v.,,
-.n.._,---
,,,,,-,,.m..
,n.--
.,.----,-----nn---,-,_m
,, - - ~.
-