Text
SAFEGUARDS INFORMATION
.
AUG 2 8 986
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30102
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTILN REPORT NOS. 50-321/86-19 AND 50-366/86-19)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
0. M. Masnyk on July 7,1986.
The inspection included a review of activities
authorized for your Hatch facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
NRC concerns relative to the inspection findings were discussed by Luis Reyes,
Acting Director of Reactor Projects, NRC, Region II, with Mr. J. T. Beckham Jr.,
Vice President and Gent.ral Manager - Nuclear Operations, Georgia Power Company in
an Enfucement Conference held on July 18, 1986.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violatten, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
,
Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from pubile disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will ng be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Dudget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
0609030320 060nna
PDH
ADUCK OD000321
' "?T.ON" 00MTAINS
G
PDH
w.ngt;A;g)g gr., CMAf f 0N
UFON SCPARATION THIS
PAGE IS D800ftin0Lt.ED.
SAFEGUARDS INFORMATION
f44
t
<
V"S'J ARDS INFORMATION
'
'
Georgia Power Company
2
AUG 2 8 Iddd
Should you have any questions concerning this letter, please contact us.
Sincerely,
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
J. P. O'Reilly, Senior Vice President
Nuclear Operations
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
il
C. Nix, Site Gereral Manager
A. Fraser, Acting Site QA Supervisor
L. Gucwa, Manager, Nuclear Safety
and Licensing
bec w/encls:
IE File
,
l
NHSS/SGPL
'
NRR/DL/SSPB
llugh S. Jordan, Executive Secretary
bec w/ Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of Georgia
!
l
l
t
l
R!l M
RI!
MIE
'
Ril +
R( 5
av'
- d/
p
t
l
OM3snyk
L
Gu re
( kt r
JS nr
A!gnatonis
W*L/* J
08//6/86
08/2 86
08/2
86
08 g/86
08/0y/86
s/.M///
l
[f'"/Plst
[
RI!
l
Rl!
R!l
R(V
S
!/
RI
,
jdeygs$f
'10
' pjes
f1
sa J
l
V0 rob; lee
BIohes
dJon ns
M JAxelrad
l
08/pf/86
08/ # 86
/08/ '/86
08/;f/86
08/,4f/86
f
na
,n ,usr.e w 1n
'/<N/0
yg e,tpBD f, INF@'/'"
SAFEgyARDS INFORMATION
--
- --
--
-
- - -