Forwards Safety Insp Rept 50-423/86-25 on 860721-25.No Violations Noted
ML20212P858
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/22/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20212P862 List:
References
NUDOCS 8609030314
Download: ML20212P858 (2)


See also: IR 05000423/1986025

Text

.

d

NG221986

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection Report No. 50-423/86-25

This refers to the routine safety inspection conducted by Mr. Alan Finkel of this

office on July 21-25, 1986 at the Millstone Nuclear Power Station, Unit 3,

Waterford, Connecticut, of activities authorized by NRC License No. NPF-49 and to

the discussions of our findings held by Mr. Finkel with Mr. Romberg and other

members of your office at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter is

uppreciated.

Sincerely,

originniSiB"

?. K. W"

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report Number 50-423/86-25

0FFICIAL RECORD COPY IR MILL 3 86-25 - 0001.0.0 \

_ 07/30/86

8609030314 e60822 3

DR ADOCK 0500

. _ _

..

Northeast Nuclear Energy Company 2

-

i

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Vandana Mathur, McGraw-Hill Publications (2 copies) (FINAL SALP REPORT ONLY)

Art McGuire, Construction Industry Litigation Reparter (2 copies) (FINAL SALP

REPORT ONLY)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

Robert J. Bores, DRSS

.

4

i

!

'

0

0.fJa

RI:DRS RIhRSit RI4.S

AFinkel/kim JJohnson LBettenhausen

08/d'/86 08/l(/86 08/ /786

0FFICIAL RECORD COPY IR MILL 3 86-25 - 0002.0.0

07/30/86

.-_ . .. ._. .- - _ - _ _ - _ . .

._ -.