ML20212P816

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-454/87-05 & 50-455/87-07 on 870130-0227.No Violations Noted
ML20212P816
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/10/1987
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212P817 List:
References
NUDOCS 8703160279
Download: ML20212P816 (2)


See also: IR 05000454/1987005

Text

,

-

.

__

.

_

_

-

,

es

-

po

0

. MAR 1.01987

Docket No. 50-454

Docket No. 50-455

I

Comonwealth Edison Company

i

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

J. M. Hinds Jr. and P. G. Brochman of this office on January 30 -

j

February 27, 1987, of activities at Byron Station Units 1 and 2,

authorized by NRC Operating Licenses No. NPF-37 and No. NPF-66 and

!

to the discussion of our findings with Mr. R. E. Querio and others

of your staff at the conclusion of the inspection.

'

-

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of

I

this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

K f5 00 54

ORIGRIAL SIGNED BY R. ? WARNICK

316

G

PDR

R. F. Warnick, Chief,

Reactor Projects Branch 1

Enclosure:

Inspection Reports

No. 50-454/87005(DRP);

50-455/87007(DRP)

See Attached Distribution

RIII .

iN

I"b.

N

I

RIII

\\

$ Leref@ap

F ney

Warnick

(V

,

g

-

..

.

.

Commonwealth' Edison Company

2

. MAR 1.01987

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

R. E. Querto, Plant Manager

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII Braidwood

Phyllis Dunton, Attorney General's

Office, Environmental Control

Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division