e DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1
'DATE 1/8/87 COMPLETED BY
'S.
R. EVANS TELEPHONE 314/676-8742 PART A OPERATIONS SU M RY The plant operated at approximately 98% rated thermal power during the entire month of December. The reactor power was maintained at 98% pcwer to provide conservatism associated with our indicated core thermal hydraulic anomaly under investigation.
PART B PORV AND SAFETY VALVE
SUMMARY
None CA-#804 04/10/85 8703160252 861231 qDP-zz-04204 PDR ADOCK 05000483 R
PDR Page 1 of 4
\\\\\\
_. ;. sl?
.i.
- i Part C AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME
- CALLAWAY UNIT 1
- DATE
'1/8/87 COMPLETED BY -
S. R.' EVANS-TELEPHONE 314/676-8742 MDMTH:
DECEMBER 1986 MT. RICE DATLY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
-(We-Net)
DAY-(MWe-Net)-
1 1027 17 1076 2
.1038 18 1082 3
1071 19 1081 4
1081 20 1076 5
1088 21 1076
'6 1085 22 1077 7
1080 23 1080 8
1080 24 1079 9
1083 25 1088 10 1083 26 1068 11 1080 27 1088 12 1082 28 1082 13 1081 29 1081 14 1077 30 1082 15 1077 31 1079 16 1076 CA-#804 04/10/85 QDP-ZZ-04204 Page 2 of 4
y
- A, e
-dJ PIrt D OPERATING DATA REPORI
~
~ DOCKET NO.
50-483 UF7T NAME CALLAWAY UNIT 1 DATE 1/8/87'
~
COMPLETED BY S. R. EVANS
_ TELEPHONE 314/676-8742 OPERATING STATUS (YTD CUM )
1.
REPORTING PERIOD:
December 1986 CROSS HOURS IN REPORTING PERIOD: 744 (8760 17822.5) 2.~
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1120 DESIGN ELECTRICAL RATING'(MWe-Net):
1171*
- At stretch power level which is net currently authorized under the Operating License.
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
100%
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TU DATE CUMULATIVE 5.
NUMBER OF HOURS REACIOR WAS CRITICAL...............
744 7306.6 15770.1 6
REACTOR RESERVE SHUTDOWN HOURS.....................
0 0
0 7.
HOURS CENERATOR ON LINE............................
744 7124.5 15311.9 8.
UNIT RESERVE SHUTDOWN HOURS........................
0 0
0 9 GROSS THERMAL ENERGY GENERATED (MWH)...............
2,476,793 22,552,342 48,569,895
- 10. CROSS ELECTRICAL ENERCY CENERATED (MWH)............
838,396 7,579,195 16,393,138
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)..............
801,731 7,199,113 15,567,900
- 12. REACTOR SERVICE FACTOR.............................
100%
83.4%
88.5%
~
- 13. REACTOR AVAILABILITY FACIOR........................
100%
83.4%
88.5%
1~
14 UNIT SERVICE FACTOR................................
100%
81.3%
85.9%
- 15. UNIT AVAILABILITY FACTOR...........................
100%
81.3%
85.9%
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
96.2%
73.4%
78.0%
- 17. UNIT CAPACITY FACTOR (Using Design MWe)............
92.0%
70.2%
74.6%
- 18. UNIT IURCED OUTAGE RATE............................
0.0%
3.4%
4.9%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Planned maintenance cutage scheduled to begin 4/3/87. Duaration: 30 days 20 IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
CA-#804 04/10/85 QDP-ZZ-04204 Page 3 of 4
f Part E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 1/8/87 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: DECEMBER 1986 METHOD OF TYPE SHUTTING DOWN F: IDRCED DURATION THE REACTOR OR NA DATE S: SCIEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS l
None
SUMMARY
REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICIION 4: OTIER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
CA-#804 H: OTl!ER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4
$. Ik -
Union Etscraic s
Ca#away Plant January 13, 1987 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1429
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATILO REPORT DECEMBER 1986 The enclosed Monthly Operating Report for December 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
G. L. Randolph Manager, Callaway Plant
/g#1757Zpg MET /RDA/TPS/DBP/S /drs Enclosure cc: Distribution attached Is >
g/
4 i
Maky Autirest P.O Box 620, Fulton, MO 652S1 1
..e-1 e ce :
l cc distribution for ULNRC-1429
. with enclosures Mr. W. F. Forney, Chief-Project Section IA
. U. S. Nuclear Regulatory Commission Region III' 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360
' Jefferson City, MO 65102
. -