ML20212P569

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/86-29 & 50-499/86-26.Health Physics Staffing Will Be Reviewed During Future Insps
ML20212P569
Person / Time
Site: South Texas  
Issue date: 03/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8703160155
Download: ML20212P569 (2)


See also: IR 05000498/1986029

Text

1

w? +

g g g jgg-[-

~

.In Reply Refer To:

Dockets:

50-498/86-29

-50-499/86-26

.

Houston Lighting & Power Company

ATTN:

J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

. Houston, Texas

77001

Gentlemen:

Thank you for your letter of December 19, 1986, in response to our letter

of November 26, 1986. We have reviewed your reply and find it responsive to

the concerns raised in the letter. We will further review your staffing during

future inspections to assure that the experience level of your health physics

i

staff is appropriate to support plant operations.

Sincerely,

ORIGINAL SIGNED BY:

J. E. Gagliardo, Chief

Reactor Project Branch

cc:

Houston Lighting & Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O.' Box 1700

Houston, Texas

77001

!

Texas Radiation Control Program Director

Houston Lighting and Power Company

bec:

(see next page)

RIV:FRP

C:FRPS

C:R&SPB

C PB

C:RPB d

HDChaney jt

BMurray

WLFisher

G

stable

JEGagliNdo

3 g{$t'

S g87

/

87

3 / 7 /87

1/'y /87

/

l

TJ3Tsu 8' 'di e

p o'

eg

/y

gg

a

-

.

_ - - -

.

_

__

._-

,

,e:. .,;

~

.

. Houston Lighting and Power Company '

-2-

bec'to DMB-(IE06)

'bec distrib. by RIV:

RPB

-

DRSP

Resident Inspector-OPS.

R. D. Martin,~RA-

.

Resident Inspector-CONST.

t

Section Chief (RPB/C)

R&SPB

MIS SYSTEM

RIV File

.D. Weiss,'LFMB (AR-2015)

RSTS Operator

R. Pirfo, ELD

R. G. Taylor, RPB/C

RSB

B. A. Breslau, RPB/C

Inspector

Section Chief

W. L. Fisher

R. L. Bangart

R. E.' Hall

Project Inspector

.

t

=

.

The Light

.

NE

Uf liouston Lighting & Power P.O. Box 1700 Houston,'lexas 77001 (713) 228 9211

December 19, 1986

ST-HL-AE-1854

File No.: G13.12

g [E' D U C "

Mr. Robert D. Martin

Regional Administrator, Region IV

b--

-

U. S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

b

j

Arlington, Texas

76011

.

South Texas Project

Units 1 & 2

Docket Nos. STN 50-498, STN 50-499

Staffing Requirements for Radiation Protection Technicians

Dear Mr. Martin:

We have received your Inspection Report 86-29 (50-498)/86-26 (50-499)

which requested information concerning staffing requirements to ensure that

radiation protection technicians in responsible positions will have

appropriate experience.

Per this request, we provide the following:

o

Plant General Procedures will be revised to state that the normal shift

complement of radiation protection personnel shall include a minimum of

one technician or supervisor with power reactor operating experience,

(i.e., above 20% power) of greater than one month.

Attachment 1 and Attachment 2 illustrate that STPEGS can, at this time,

..

o

support the planned five shift rotation while meeting the aforementioned

operating experience commitment.

o

Currently approved staffing for 1987 includes the addition of five

personnel meeting either Senior or Lead Radiation Protection Technician

qualification. This qualification will include power reactor operating

experience greater than one month.

If you should have any questions on this matter, please contact

Mr. S. M. Head at (512) 972-8392.

Very truly yours,

N s k,

'

Ch

J. H. Goldberg

Group Vice President, Nuclear

SMH/hg

L4/NRC/sr

1

kas\\% 4 Hp3/ W

.

_

.

.

.

A

ws : .

'4

ST-HL-AE-1854-

File No.: G13.12

. Houston Lighting & Pbwer Company

-

Page 2

-.

-cc:

Hugh L. _ Thompson, Jr. , Director

T.V. Shockley/R.L. Range

Division of PWR Licensing - A-

. Central Power &' Light Company

Office of Nuclear Reactor Regulation

P.O. Box 2121

U.S. Nuclear Regulatory Commission

Corpus Christi, TX 78403

Washington, DC ;20555

O. Backus/J. E. Malaski

' Robert D. Martin

City of Austin

Regional Administrator, Region IV

P.O. Box 1088

Nuclear Regulatory Commission

Austin, TX' 78767-

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

J. B. Poston/A. vonRosenberg-

City Public Service Board

N.' Prasad Kadambi, Project Manager

P.O. Box 1771

U.S., Nuclear Regulatory Commission

San Antonio, TX 78296

-

7920 Norfolk Avenue

Bethesda, MD 20814

Brian E. Berwick, Esquire-

Assistant Attorney General for

,

Dan R.-Carpenter

the State of Texas

Senior Resident Inspector / Operations

P.O. Box 12548, Capitol Station

c/o U.S. Nuclear Regulatory

Austin, TX 78711

Commission

P.O. Box 910

Lanny A. Sinkin

Bay City, TX 77414

Christic Institute

1324 North Capitol Street

Claude E. Johnson

Washington, D.C.

20002

Senior Resident Inspector /STP

c/o U.S. Nuclear Regulatory

Oreste R. Pirfo, Esquire

Commission

Hearing Attorney

P.O. Box 910

Office of the Executive Legal Director

Bay City, TX 77414

U.S. Nuclear Regulatory Commission

Washington, DC 20555

M.D. Schwarz, Jr. , Esquire

Baker & Botts

Citizens for Equitable Utilities, Inc.

One Shell Plaza

c/o Ms. Peggy Buchorn

Houston, TX 77002

Route 1, Box 1684

..

Brazoria, TX 77422

J.R. Newman, Esquire

!

Newman & Holtzinger, P.C.

Docketing & Service Section

U

1615 L Street, N.W.

Office of the Secretary

.

Washington, DC 20036

U.S. Nuclear Regulatory Commission

Washington, DC 20555

Director, Office of Inspection

(3 Copies)

'

and Enforcement

i

U.S. Nuclear Regulatory Commission

Advisory Committee on Reactor Safeguards

Washington, DC 20555-

U.S. Nuclear Regulatory Commission

i

1717 H Street

Washington, DC 20555

!

Revised 11/12/86

J

.

t

L4/NRC/sr

,

,, _ - _ _ _ - , _ .

.

- ,.

_

_ _ _ ___._,-_ -__,. _ __ ___ __ _ , _ .._ _ _ _ - , _ __ _ , _ _ _

,, 0

,

..

Att chment 1

e

IIEALTH AND SAFETY PERSONNEL WITH OPERATING POWER PLANT EXPERIENCE *

LAST NAME

LENGTH OF TIME

LOCATION

ASSIGNMENT

TITLE

BILBREY

l month

Exp. Trips

Sr. H.P.

BRAVO

1 month

V. C. Summer

Exp. Trips

Sr. Tech

2ALVAN

1 month & 2 week

Exp. Trips

Lead

EURN

7 yrs.

D. C. Cook

Permanent Plant Staff

H.P.

HOMER

3 1/2 yrs.

San Onofre

Contract

Sr. Tech

SARVELA

7 Yrs.

Kewaunee

Permanent Staff

Manager

LINDSAY

5 yrs.

Contract Tech, Long Term

Sr. H.P.

LONCHAR

9 months

PWR and BWR

Long Term Contract

Sr. Tech

PARISH

1 month

Exp. Trips

Supervisor

PEREZ

l month

V. C. Summer

Exp. Trips

Sr. Tech

SEPULVEDA

1 month

V. C. Summer

Exp. Trips

Sr. Tech

SMITH, JR.

6 yrs.

V. C. Summer and BWR

Permanent Staf f and Contract Lead

TELFER

2 yrs.

Shoreham

Permanent Staff

Sr. Tech

Exp. Trips

3 h c#

+

rja

af

  • above 20% power

o a

sa

F"

M

m-

d

, _ . _ _

_ _ _ _ _ - - _ _

_ . . _ _ _

_

____

.

'

e

Attcchment 2,

ST-HL-AE-185%

File No.: G13'.12

CURRENT EMPLOYEES

'

Page 1 of 2

OUTAGE

NUCLEAR

DEGREES /AND/OR

LAST NAME

JOB TITLE

PWR OPS

PWR

BWR OPS

OTHER

CERTIFICATIONS

REMARKS

JARVELA

MGR.,H&SS

7 yr.

27 y

Start Up, Kewanee,USN

U.S. Navy Nuclear

Program, Nuc. Medicine:

X-Ray Tech, U.S. Navy,

Nuclear Program

ASHCRAFT

RPT, Assoc.

I wk.

3 wk.

BIRCHFIELD

RPT, Assoc.

8 wk.

4y

BOYLE

RPT, Jr.

BRAVO

RPT, Sr.

4 wk.

16 wk.

2y

Assoc. Rad. Prot.

2 yr. @ ORNL

BUTLER

RPT, Jr.

4 wk.

CRAFT

Supv., RP

25 y

BS, Certified

Savanah River

Health Physicist

GALVAN

RPT, Lead

6 wk.

16 wk.

Assoc. Rad. Prot.

GARCIA

RPT, Jr.

GURN

HP

7y

Start Up, D.C. Cook

HALAMICEK

RPT, Jr.

HAYDEN

RPT, Jr.

HOMER

RPT

2

y

2y

1y

Start Up, San Onofre,2

Units

HUBENAK

RPT, Jr.

KING

RPT, Jr.

20 y

U.S. Navy, Nuclear

Program

KRUPPA

RPT, Jr.

KRUSE

RPT, Assoc.

4 wk.

Assoc. Rad. Prot.

MUNZENMAIER

RPT, Jr.

48 wk.

Assoc. Rad. Prot.

1 yr. Contract Tech

LONCHAR

RPT, Sr.

15 wk.

2y

24 wk.

4y

U.S. Navy, Nuclear

Program

_ - _ __.

a

,9

,

.

.

Attcchment co

ST-HIr-AR-185% , gt 'd

'ORRENT EMPLOYEES

Prga 2 of 2

File No.: G13.12

9

OUTAGE

NUCLEAR

DEGREES /AND/OR

LAST NAME

JOB TITLE

PWR OPS

PWR

BWR OPS

OTHER

CERTIFICATIONS

REMARKS

PEARSON

RPT, Lead

I wk.

8 wk.

NRRPT

U.S. Army, Nuclear

Program

PEREZ

RPT, Sr.

4 wk.

16 wk.

Assoc. Rad. Prot.

PIERCE II

RPT, Assoc.

I wk.

15 wk.

REESE

RPT, Assoc.

I wk.

4 wk.

RUSSELL

RPT, Assoc.

4 wk.

SEPULVEDA

RPT, Sr.

4 wk.

16 wk.

Assoc. Rad. Prot.

SMITH, JR.

RPT, Lead

4y

1y

6 mo.

6y

NRRPT

U.S. Navy, Nuclear

Program

TELFER

RPT, Sr.

2-y

9y

U.S. Navy, Nuclear

Program

TOMEK

RPT, Jr.

I wk.

4 wk.

ZAVALA

RPT, Jr.

4 wk.

Assoc. Rad. Prot.

HARDCASTLE, JR. RLT, Sr.

Assoc. Rad. Prot.

LOCKWOOD

HP,

Sr.

MS Science

HP Experience

PASSAFUMA

RLT, Sr.

PIPER

HP,

Sr.

MS

HP experience

SHERWOOD

Supv., Rad. Lab

PHD Chemistry

Fuel Fab.,

HP Experience

fHIPLEY

RLT, Sr.

WILLIAMS

Staff Eng.

MS Science

Lawerence Livermore,

Certified

Health Physicis

Health Physicist

BILBREY

HP, Sr.

2 wk.

19 wk.

12 y

Fuel Fab., HP

Experience

BRADFORD

HP, Sr.

I wk.

5 wk.

BS

LINDSAY

HP, Sr.

5y

2y

2

y

BS

PARISH

Supv.,RSS

2 wk.

19 wk.

3y

BS

RP Tech, X-Ray Tech

IOTE: