Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/86-29 & 50-499/86-26.Health Physics Staffing Will Be Reviewed During Future Insps
ML20212P569
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8703160155
Download: ML20212P569 (2)


See also: IR 05000498/1986029

Text

1

w? + g g g jgg-[-

.In Reply Refer To:

~

Dockets: 50-498/86-29

-50-499/86-26

.

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

. Houston, Texas 77001

Gentlemen:

Thank you for your letter of December 19, 1986, in response to our letter

of November 26, 1986. We have reviewed your reply and find it responsive to

the concerns raised in the letter. We will further review your staffing during

future inspections to assure that the experience level of your health physics i

staff is appropriate to support plant operations.

Sincerely,

ORIGINAL SIGNED BY:

J. E. Gagliardo, Chief

Reactor Project Branch

cc:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager,

Nuclear Licensing

P. O.' Box 1700

Houston, Texas 77001

! Texas Radiation Control Program Director

Houston Lighting and Power Company

bec: (see next page)

RIV:FRP C:FRPS C:R&SPB C PB C:RPB d

HDChaney jt BMurray WLFisher G stable JEGagliNdo

S g87 / 87 3 / 7 /87 1/'y /87 3/g{$t'

l TJ3Tsu

a

eg

8' 'di e p o'

gg

/y

_ - - - . _ __ ._-

- _.

,

,e:. .,;

~

. . Houston Lighting and Power Company ' -2-

bec'to DMB-(IE06)

'bec distrib. by RIV:

RPB

-

DRSP

Resident Inspector-OPS.

R. D. Martin,~RA-

.

Resident Inspector-CONST. t

Section Chief (RPB/C)

R&SPB

MIS SYSTEM

RIV File

.D. Weiss,'LFMB (AR-2015)

RSTS Operator

R. Pirfo, ELD

R. G. Taylor, RPB/C

RSB

B. A. Breslau, RPB/C

Inspector

Section Chief

W. L. Fisher

R. L. Bangart

R. E.' Hall

Project Inspector

.

t

=

.

. The Light

NE Uf liouston Lighting & Power P.O. Box 1700 Houston,'lexas 77001 (713) 228 9211

December 19, 1986

ST-HL-AE-1854

File No.: G13.12

g [E' D U C "

Mr. Robert D. Martin

b--

-

Regional Administrator, Region IV

U. S. Nuclear Regulatory Commission j

611 Ryan Plaza Drive, Suite 1000 b

Arlington, Texas 76011 .

South Texas Project

Units 1 & 2

Docket Nos. STN 50-498, STN 50-499

Staffing Requirements for Radiation Protection Technicians

Dear Mr. Martin:

We have received your Inspection Report 86-29 (50-498)/86-26 (50-499)

which requested information concerning staffing requirements to ensure that

radiation protection technicians in responsible positions will have

appropriate experience. Per this request, we provide the following:

o Plant General Procedures will be revised to state that the normal shift

complement of radiation protection personnel shall include a minimum of

one technician or supervisor with power reactor operating experience,

(i.e., above 20% power) of greater than one month.

.. o Attachment 1 and Attachment 2 illustrate that STPEGS can, at this time,

support the planned five shift rotation while meeting the aforementioned

operating experience commitment.

o Currently approved staffing for 1987 includes the addition of five

personnel meeting either Senior or Lead Radiation Protection Technician

qualification. This qualification will include power reactor operating

experience greater than one month.

If you should have any questions on this matter, please contact

Mr. S. M. Head at (512) 972-8392.

Very truly yours,

N s k, '

Ch

J. H. Goldberg

Group Vice President, Nuclear

SMH/hg

L4/NRC/sr

1

kas\% 4 Hp3/ W

. _ . . .

A

ws : .

'4

ST-HL-AE-1854-

. Houston Lighting & Pbwer Company File No.: G13.12

- Page 2

-.

-cc:

Hugh L. _ Thompson, Jr. , Director T.V. Shockley/R.L. Range

Division of PWR Licensing - A- . Central Power &' Light Company

Office of Nuclear Reactor Regulation P.O. Box 2121

U.S. Nuclear Regulatory Commission Corpus Christi, TX 78403

Washington, DC ;20555

O. Backus/J. E. Malaski

' Robert D. Martin City of Austin

Regional Administrator, Region IV P.O. Box 1088

Nuclear Regulatory Commission Austin, TX' 78767-

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011 J. B. Poston/A. vonRosenberg-

City Public Service Board

N.' Prasad Kadambi, Project Manager P.O. Box 1771

U.S., Nuclear Regulatory Commission San Antonio, TX 78296

-

7920 Norfolk Avenue

Bethesda, MD 20814 Brian E. Berwick, Esquire-

,

Assistant Attorney General for

Dan R.-Carpenter the State of Texas

Senior Resident Inspector / Operations P.O. Box 12548, Capitol Station

c/o U.S. Nuclear Regulatory Austin, TX 78711

Commission

P.O. Box 910 Lanny A. Sinkin

Bay City, TX 77414 Christic Institute

1324 North Capitol Street

Claude E. Johnson Washington, D.C. 20002

Senior Resident Inspector /STP

c/o U.S. Nuclear Regulatory Oreste R. Pirfo, Esquire

Commission Hearing Attorney

P.O. Box 910 Office of the Executive Legal Director

Bay City, TX 77414 U.S. Nuclear Regulatory Commission

Washington, DC 20555

M.D. Schwarz, Jr. , Esquire

Baker & Botts Citizens for Equitable Utilities, Inc.

One Shell Plaza c/o Ms. Peggy Buchorn

.. Houston, TX 77002 Route 1, Box 1684

Brazoria, TX 77422

J.R. Newman, Esquire

!

Newman & Holtzinger, P.C. Docketing & Service Section

U 1615 L Street, N.W. Office of the Secretary

.

Washington, DC 20036 U.S. Nuclear Regulatory Commission

Washington, DC 20555

'

Director, Office of Inspection (3 Copies)

and Enforcement

i U.S. Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards

Washington, DC 20555- U.S. Nuclear Regulatory Commission

i 1717 H Street

Washington, DC 20555

!

Revised 11/12/86

J

.

t

L4/NRC/sr

,

,, _ - _ _ _ - , _ . - ,. _ _ _ ___._,-_ -__,. _ __ ___ __ _ , _ .._ _ _ _ - , _ __ _ , _ _ _

, ,, 0

..

Att chment 1 e

IIEALTH AND SAFETY PERSONNEL WITH OPERATING POWER PLANT EXPERIENCE *

LAST NAME LENGTH OF TIME LOCATION ASSIGNMENT TITLE

BILBREY l month Exp. Trips Sr. H.P.

BRAVO 1 month V. C. Summer Exp. Trips Sr. Tech

2ALVAN 1 month & 2 week Exp. Trips Lead

EURN 7 yrs. D. C. Cook Permanent Plant Staff H.P.

HOMER 3 1/2 yrs. San Onofre Contract Sr. Tech

SARVELA 7 Yrs. Kewaunee Permanent Staff Manager

LINDSAY 5 yrs. Contract Tech, Long Term Sr. H.P.

LONCHAR 9 months PWR and BWR Long Term Contract Sr. Tech

PARISH 1 month Exp. Trips Supervisor

PEREZ l month V. C. Summer Exp. Trips Sr. Tech

SEPULVEDA 1 month V. C. Summer Exp. Trips Sr. Tech

SMITH, JR. 6 yrs. V. C. Summer and BWR Permanent Staf f and Contract Lead

TELFER 2 yrs. Shoreham Permanent Staff Sr. Tech

Exp. Trips

+

3 h c#

rja a

above 20% power o

a

f

sa

F"

M

m- d

, _ . _ _ _ _ _ _ _ - - _ _ _ . . _ _ _ _ ____

.

' *

e

Attcchment 2,

ST-HL-AE-185%

File No.: G13'.12

CURRENT EMPLOYEES '

Page 1 of 2

OUTAGE NUCLEAR DEGREES /AND/OR

LAST NAME JOB TITLE PWR OPS PWR BWR OPS OTHER CERTIFICATIONS REMARKS

JARVELA MGR.,H&SS 7 yr. 27 y Start Up, Kewanee,USN

U.S. Navy Nuclear

Program, Nuc. Medicine:

X-Ray Tech, U.S. Navy,

Nuclear Program

ASHCRAFT RPT, Assoc. I wk. 3 wk.

BIRCHFIELD RPT, Assoc. 8 wk. 4y

BOYLE RPT, Jr.

BRAVO RPT, Sr. 4 wk. 16 wk. 2y Assoc. Rad. Prot. 2 yr. @ ORNL

BUTLER RPT, Jr. 4 wk.

CRAFT Supv., RP 25 y BS, Certified Savanah River

Health Physicist

GALVAN RPT, Lead 6 wk. 16 wk. Assoc. Rad. Prot.

GARCIA RPT, Jr.

GURN HP 7y Start Up, D.C. Cook

HALAMICEK RPT, Jr.

HAYDEN RPT, Jr.

HOMER RPT 2 y 2y 1y Start Up, San Onofre,2

Units

HUBENAK RPT, Jr.

KING RPT, Jr. 20 y U.S. Navy, Nuclear

Program

KRUPPA RPT, Jr.

KRUSE RPT, Assoc. 4 wk. Assoc. Rad. Prot.

MUNZENMAIER RPT, Jr. 48 wk. Assoc. Rad. Prot. 1 yr. Contract Tech

LONCHAR RPT, Sr. 15 wk. 2y 24 wk. 4y U.S. Navy, Nuclear

Program

_ - _ __.

,9 a

,

.

.

Attcchment co

'ORRENT EMPLOYEES ST-HIr-AR-185% , gt '

Prga 2 of 2 File No.: G13.12

9

OUTAGE NUCLEAR DEGREES /AND/OR

LAST NAME JOB TITLE PWR OPS PWR BWR OPS OTHER CERTIFICATIONS REMARKS

PEARSON RPT, Lead I wk. 8 wk. NRRPT U.S. Army, Nuclear

Program

PEREZ RPT, Sr. 4 wk. 16 wk. Assoc. Rad. Prot.

PIERCE II RPT, Assoc. I wk. 15 wk.

REESE RPT, Assoc. I wk. 4 wk.

RUSSELL RPT, Assoc. 4 wk.

SEPULVEDA RPT, Sr. 4 wk. 16 wk. Assoc. Rad. Prot.

SMITH, JR. RPT, Lead 4y 1y 6 mo. 6y NRRPT U.S. Navy, Nuclear

Program

TELFER RPT, Sr. 2-y 9y U.S. Navy, Nuclear

Program

TOMEK RPT, Jr. I wk. 4 wk.

ZAVALA RPT, Jr. 4 wk. Assoc. Rad. Prot.

HARDCASTLE, JR. RLT, Sr. Assoc. Rad. Prot.

LOCKWOOD HP, Sr. MS Science HP Experience

PASSAFUMA RLT, Sr.

PIPER HP, Sr. MS HP experience

SHERWOOD Supv., Rad. Lab PHD Chemistry Fuel Fab.,

HP Experience

fHIPLEY RLT, Sr.

WILLIAMS Staff Eng. MS Science Lawerence Livermore,

Certified Health Physicis

Health Physicist

BILBREY HP, Sr. 2 wk. 19 wk. 12 y Fuel Fab., HP

Experience

BRADFORD HP, Sr. I wk. 5 wk. BS

LINDSAY HP, Sr. 5y 2y 2 y BS

PARISH Supv.,RSS 2 wk. 19 wk. 3y BS RP Tech, X-Ray Tech

IOTE: DOSE NOT INCLUDE HL&P TIME EXCEPT EXPERIENCE TRIPS.

__. -