Forwards Safeguards Insp Repts 50-373/86-32 & 50-374/86-33 on 860728-0801 & Notice of Violation.Notice of Violation & Insp Rept Details Withheld (Ref 10CFR73.21)
ML20212P280
Person / Time
Site: LaSalle  
Issue date: 08/28/1986
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212P282 List:
References
NUDOCS 8609030060
Download: ML20212P280 (2)


See also: IR 05000373/1986032

Text

r

DNS

-

-

m~m.,~

, ,,7. _ ,

is. m,,,u[ h,

" " w " w u

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safeguards inspection conducted by Mr. J. L. Belanger

and Ms. G. M. Christoffer of this office on July 28, 1986 through August 1,

1986, of activities at LaSalle County Station, Units 1 and 2, authorized by

NRC Operating Licenses No. NPF-11 and No. NPF-18, and to the discussion of our

findi'gs with Mr. G. J. Diederich and other members of your staff at the

conclusion of the inspection.

The results of this inspection were also

discussed on August 14, 1986 during a management meeting between Messrs.

B. Saunders and T. Borzym and others of your staff and Messrs. J. Belanger,

G. Pirtle, and J. Wiebe of the NRC Region III staff.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as specified in the enclosed Notice.

A written response is required.

The inspection revealed that you did not adequately protect the vital area

barrier system which could have allowed access into the vital areas of the

LaSalle facility.

These violations reflect a systematic failure in fully

implementing and maintaining in effect the provisions of your NRC-approved

Physical Security Plan.

Of significant concern is the fact that the event

involved faulty judgment on the part of an experienced security officer

during the performance of compensatory measures for a failed alarm system

which precluded the initiation of corrective measure, and as a result, a

second violation occurred.

We are also concerned about the lack of security

awareness on the part of station employees regarding the designation of vital

and access control doors at the LaSalle facility, and the miscommunication

between station personnel and the security organization regarding the posting

of vital area doors during security computer outages.

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Section 73.21(c)(2) of the NRC's " Rules

-p d 0 N

of Practice," Part 73, Title 10, Code of Federal Regulations.

This

information must be handled and protected in accordance with the provisions

of 10 CFR 73.21.

Consequently, the enclosure to this letter, our report of

,\\

this inspection, and your response to the noncompliance identified in the

enclosure to this letter will not be placed in the Public Document Room.

8609030060 060028

PDR

ADOCK 05000373

Enclosure contains

G

PDR

SAFEGUARDS INFORMATION

c.r r r ~ ,. s e

...-n...w

Upon separation this

A

page is Decontrolled

-

s

k

Commonwealth Edison Company

2

- AUG 2'81988

Therefore, your statement of corrective action regarding the noncompliance

identified in the enclosure should be submitted as a separate enclosure to

your transmittal letter in the manner prescribed.

The responses directed by this letter (and the accompanying, Notice) are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

h

,

phckA. Hind, Director

Division of Radiation Safety and

Safeguards

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-373/86032(DRSS);

No. 50-374/86033(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Diederich, Plant

Manager

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

ACRS

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

.

RIII

RIII Q g

RIII / RIII