Monthly Operating Rept for Feb 1987
ML20212P258
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1987
From: Elms A, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-10134, NUDOCS 8703160047
Download: ML20212P258 (4)


Text

_

AVERAGE DAILY UNIT POWER LEVEL.

DOCKET NO.

50-423 UNIT 3

DATE March 4, 1987_.

COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH FEBRUARY

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(MWe-Net) 1 1,136 17 1,142 2

1,137 18 1,133 3

1,138 19 1,136 4

1,140 20 1,138 5

1,140 21 1,137 6

1,133-22 1,137 7

1,136 23 1,136 8

1,137 24 1,134 9

1,138 25 1,137 10 1,135 26 1,137 11 1,138 27 1,133 12 1,139 28 1,135 13 1,138 29 N/A 14 1,139 30 N/A 15 1,140 31 N/A 16 1,137 h

[

R JL g

_ _ _ - _ __ _ _ _ __ _ _ - _ ___ A

s

              • ItRC OPERATING STATUS REPORT COMPLETED BY REACTOR EN61NEER!h6 *******
1. DOCKET.... 50-423 OPERATING STATUS
2. REPORTING PERIOD... FEBRUARY 1987 OUTA6E + DNLINE HOURS.. 0

+ 672

= 672

3. UTILITY CONTACT.................A. L. ELMS 203-444-5388-
                    • H+
4. LICENSED THERMAL P0NER.........................................

3411

  • MILLSTONE *
5. NAMEPLATE RATING (6ROSS ME)................................... 1,253 M
  • UNIT 3
6. DES IGN ELECTRIC AL RATIN6 (NET ME)............................. 1153. 61
7. MAIIMUM DEPENDABLE CAPACITY (6ROSS ME)........................

1197

8. MAIIMUM DEPENDABLE CAP ACITY (NET ME)........................... 1141.93 9.

IF CHAN6ES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........

N/A

10. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET M E)...............N/A
11. REASON FOR RESTRICTION, IF M Y....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33=23 3=233==E2333 3332=2323333==3333
12. HOURS IN REPORTIN6 PERIOD 672.0 1416.0 7488.0
13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 672.0 1392.2 6805.0
14. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0 83.2
15. HOURS GENERATOR ONLINE 672.0 1378.2 6734.1
16. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
17. 6ROSS THERMAL ENER3Y GENERATED (MWH) 2291058.0 4646872.2 22386796.4 18, 6ROSS ELECTRICAL ENER6Y SENERATED (MH) 796272.0 1612629.0 7745713.5
19. NET ELECTRICAL ENER6Y GENERATED (M H) 764072.7 1545168.9 7406931.6
20. UNIT SERVICE FACTOR 100.0 97.3 89.9
21. UNIT AVAILABILITY FACTOR 100.0 97.3 89.9
22. UNIT CAPACITY FACTOR (USING MDC NET) 99.6 95.6 86.2
23. UNIT CAPACITY FACTOR (USING DER NET) 98.6 94.6 85.7
24. UNIT FORCED QUTAGE RATE 0.0 2.7 10.1
25. UNIT FORCED OUTAGE HOURS 0.0 37.8 753.9 SHUTDOWNS SCHEDULED DVER NEIT SII MONTHS (TYPE, DATE, AND DURATION OF EACH)..............

March 13 1987 - Mid Cycle Outage - Approximately four weeks IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE......N/A

(

D

s=

UNIT SHUTDOWNS AND POWER REDUCTIONS r

DOCKET NO. 50-423-

' UNIT Millstone Unit No. 3 '

q

'DATE March 4, 1987 COMPLETED BY~A. Eles-TELEPHONE.(203) 444-5388 REPORT MONTH' FEBRUARY 1987 Duration Shutting iEvent System Component.

Cause-& Corrective-Method of Licensee Action to No.

Date Type (1)

(Hours)

Reason (2)'

Down Reactor (3) Report #

Code Code-Prevent Recurrence NONE 1

2 3

4

~F:

Forced

-Reason:

-Method:

~ Exhibit G - Instructions 5:

Scheduled A - Equipment Failure (Explain) 1. Manual for'. Preparation of Data B - Maintenance or Test 2 - Manual Scram.

. Entry. Sheets'for-C - Refueling 3 - Automatic Scram Licensed Event Report.

~

D - Regulatory Restriction-4 - Continued from

-(LER) File'(NUREG-0161)

E - Operator Training.& License

- previous month Examination

~5 -' Power Reduction 5--

F - Administrative (Duration = 0).

Exh'ibit 1-- Same Source.

G - Operational Errc,r (Explain) 9 - Other -(Explain)

H - Other (Explain) 1

+e

,-- L General Offices

L IJ

[,[ Cd (203) 665-5000

,w March 9, 1987 MP-10134 Re:

10CFR50.71(a)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-03 covering operations for the month of February is hereby forwarded.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY l1lWf c4 &

Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/AE:mw Attachment cc:

Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)

Director, Office of Resource Management J.T. Shedlosky, Senior Resident Inspector d