AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO.
50-423 UNIT 3
DATE March 4, 1987_.
COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH FEBRUARY
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(MWe-Net) 1 1,136 17 1,142 2
1,137 18 1,133 3
1,138 19 1,136 4
1,140 20 1,138 5
1,140 21 1,137 6
1,133-22 1,137 7
1,136 23 1,136 8
1,137 24 1,134 9
1,138 25 1,137 10 1,135 26 1,137 11 1,138 27 1,133 12 1,139 28 1,135 13 1,138 29 N/A 14 1,139 30 N/A 15 1,140 31 N/A 16 1,137 h
[
R JL g
_ _ _ - _ __ _ _ _ __ _ _ - _ ___ A
s
- ItRC OPERATING STATUS REPORT COMPLETED BY REACTOR EN61NEER!h6 *******
- 1. DOCKET.... 50-423 OPERATING STATUS
- 2. REPORTING PERIOD... FEBRUARY 1987 OUTA6E + DNLINE HOURS.. 0
+ 672
= 672
- 3. UTILITY CONTACT.................A. L. ELMS 203-444-5388-
- H+
- 4. LICENSED THERMAL P0NER.........................................
3411
- MILLSTONE *
- 5. NAMEPLATE RATING (6ROSS ME)................................... 1,253 M
- UNIT 3
- 6. DES IGN ELECTRIC AL RATIN6 (NET ME)............................. 1153. 61
- 7. MAIIMUM DEPENDABLE CAPACITY (6ROSS ME)........................
1197
- 8. MAIIMUM DEPENDABLE CAP ACITY (NET ME)........................... 1141.93 9.
IF CHAN6ES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........
N/A
- 10. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET M E)...............N/A
- 11. REASON FOR RESTRICTION, IF M Y....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33=23 3=233==E2333 3332=2323333==3333
- 12. HOURS IN REPORTIN6 PERIOD 672.0 1416.0 7488.0
- 13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 672.0 1392.2 6805.0
- 14. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0 83.2
- 15. HOURS GENERATOR ONLINE 672.0 1378.2 6734.1
- 16. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
- 17. 6ROSS THERMAL ENER3Y GENERATED (MWH) 2291058.0 4646872.2 22386796.4 18, 6ROSS ELECTRICAL ENER6Y SENERATED (MH) 796272.0 1612629.0 7745713.5
- 19. NET ELECTRICAL ENER6Y GENERATED (M H) 764072.7 1545168.9 7406931.6
- 20. UNIT SERVICE FACTOR 100.0 97.3 89.9
- 21. UNIT AVAILABILITY FACTOR 100.0 97.3 89.9
- 22. UNIT CAPACITY FACTOR (USING MDC NET) 99.6 95.6 86.2
- 23. UNIT CAPACITY FACTOR (USING DER NET) 98.6 94.6 85.7
- 24. UNIT FORCED QUTAGE RATE 0.0 2.7 10.1
- 25. UNIT FORCED OUTAGE HOURS 0.0 37.8 753.9 SHUTDOWNS SCHEDULED DVER NEIT SII MONTHS (TYPE, DATE, AND DURATION OF EACH)..............
March 13 1987 - Mid Cycle Outage - Approximately four weeks IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE......N/A
(
D
- s=
UNIT SHUTDOWNS AND POWER REDUCTIONS r
DOCKET NO. 50-423-
' UNIT Millstone Unit No. 3 '
q
'DATE March 4, 1987 COMPLETED BY~A. Eles-TELEPHONE.(203) 444-5388 REPORT MONTH' FEBRUARY 1987 Duration Shutting iEvent System Component.
Cause-& Corrective-Method of Licensee Action to No.
Date Type (1)
(Hours)
Reason (2)'
Down Reactor (3) Report #
Code Code-Prevent Recurrence NONE 1
2 3
4
~F:
Forced
-Reason:
-Method:
~ Exhibit G - Instructions 5:
Scheduled A - Equipment Failure (Explain) 1. Manual for'. Preparation of Data B - Maintenance or Test 2 - Manual Scram.
. Entry. Sheets'for-C - Refueling 3 - Automatic Scram Licensed Event Report.
~
D - Regulatory Restriction-4 - Continued from
-(LER) File'(NUREG-0161)
E - Operator Training.& License
- previous month Examination
~5 -' Power Reduction 5--
F - Administrative (Duration = 0).
Exh'ibit 1-- Same Source.
G - Operational Errc,r (Explain) 9 - Other -(Explain)
H - Other (Explain) 1
+e
,-- L General Offices
- Selden Street, Berlin, Connecticut HAR FORD CONNECTICUT 06141-0270 k
L IJ
[,[ Cd (203) 665-5000
,w March 9, 1987 MP-10134 Re:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-03 covering operations for the month of February is hereby forwarded.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY l1lWf c4 &
Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/AE:mw Attachment cc: