ML20212P192
| ML20212P192 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/26/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20212P195 | List: |
| References | |
| NUDOCS 8609030029 | |
| Download: ML20212P192 (2) | |
See also: IR 05000335/1986019
Text
'
SAFEGUARDS INFORMATION
-
.
AllG 2 61986
Docket Nos. 50-335, 50-389
Florida Power and Light Company
ATTN:
Mr. C. O. Woody
Group Vice President
Nuclear Energy Department
P. O. Box 14000
Juno Beach, FL 33408
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-335/86-19 AND 50-389/86-18)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. D. Ennis on August 4-8, 1986. The inspection included a review of activities
authorized for your St. Lucie facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8609030029 860826
DR
ADOCK 05000335
,,
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of. Reactor Projects
Enclosures:
(See page 2)
[
SURE CONTAIn3
SAFEGUARDS lNFORMATit, d[b$^d'f[[[
"
.
.
.
.
-.
_ _
TEMt
SAFEGUARDS INFORMATION
.
.
$O
b O IOSO
Florida Power and Light Company
2
Enclosures:
1.
Notice of Violation
(Safeguards Information)
2.
NRC Inspection Report
(Safeguards Information)
cc w/encls:
K. N. Harris, Vice President
St. Lucie Nuclear Plant
D. A. Sager, Plant Manager
J. B. Harper, Site QA Superintendent
bec w/encls:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
Document Control Desk, 016
State of Florida
r
RII
II
{
II
p/ RII
J
bhg
de
hr
JP
hr
SE r
8/)Lf86
/86
0
8/ y86
8/]]J86
8
6
9
DCLOSURE c0NTAINa
SAFEGUARDS INFORMATION
ffh(r^ehhhjj,o"j"
'
,