ML20212N968

From kanterella
Jump to navigation Jump to search
Informs That BWR Owners Group Requested to Set Up Committee Addressing Responses to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients.... Generic Methodology Scheduled for Completion by Sept 1986
ML20212N968
Person / Time
Site: Brunswick  
Issue date: 05/13/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Grace J, Grace N
NRC
References
(3823AWS), IEB-85-003, IEB-85-3, NLS-86-153, NUDOCS 8609020104
Download: ML20212N968 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

h p*

CP&L o

Carolina Power & Light Company f

"q 9A 131986 SERIAL: NLS-86-153 I,u

,,.a Dr. J. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS.'50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 U IE BULLETIN 85-03, " MOTOR-OPERATED VALVE COMMON MODE FAILURES' DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS"i

Dear Dr. Grace:

As required by IE Bulletin 85-03, the Brunswick Steam Electric Plant (BSEP) initiated a review of the design basis for the operation of each valve required by the bulletin in the High Pressure Coolant injection and Reactor Core Isolation Cooling systems. This review is currently approximately 50 percent complete. In the procers of performing this review, it has been determined through discussions with other utilities that a wide range of approaches is being considered. In an effcrt to consolidate and unify the responses to this bulletin, the BWR Owners' Group (BWROG) has beer requested to set up a committee to address the issue. The BWROG generic methodology is currently scheduled to be complete by September 1986.

The current review by BSEP will continue pending the results of the BWROG; however, the BSEP review will not be completed until July l986. Carolina Power & Light Company (CP&L) will submit the results of its review, and its program and schedule for completion by August 29,1986. Upon receipt and review of the BWROG methodology, changes in the current BSEP program and implementation schedule may be necessary, in this event, CP&L will promptly notify you of any significant changes made.

Should you have questions regarding this submittal, please contact Mr. Arnold Schmich at (919) 836-8759.

Yours very uly, J& Q k S. R. Zimmerman Manager Nuclear Licensing Section SRZ/AWS/ccj (3823AWS) cc:

Mr. D. R. Muller (NRC)

Mr. W. H. Ruland (NRC-BNP)

Mr. E. D. Sylvester (NRC)

J0ficia. Copy 411 Fayetteville Street

  • P O Box 1551
  • Raieigh. N C 27602

~ ""#