Forwards GE Summary Evaluation for Changing MSIV Water Level Isolation Setpoint for Unit 2.CM Allen 861021 Transmittal Did Not Quantify Change in Peak Clad Temp.Conclusions Also Valid for Unit 1
ML20212N678
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/06/1987
From: Allen C
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20212N681 List:
References
2824K, NUDOCS 8703130114
Download: ML20212N678 (1)


Text

_ ________________________-_____________ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

= rs

~ h Commonwealth Edison

  • l,'  % One First National Plaza Chicago, tilinois (Nd Chicago,

~

/ Address Reply to: Post Office Box 767 Illinois 60690 - 0767 March 6, 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Proposed Technical Specification Amendment to Move MSIV Isolation Signal to Level 1 NRC Docket Nos. 50-373 and 50-374 Reference (a): Letter dated October 21, 1986 from C.M. Allen to H.R. Denton.

Dear Mr. Denton:

Reference (a) transmitted Commonwealth Edison's proposal for a Technical Specification change to move the setpoint for Main Steam Line Isolation Valve (MSIV) closure from Level II to Level I. That transmittal did not quantify the change in Peak Clad Temperature. Attached is a General Electric evaluation of a LOCA analysis with the MSIV setpoint changed to Level

1. The conclusions reached in the evaluation are also considered valid for Unit 1.

Please direct any questions you may have regarding this matter to this office.

Very truly yours, L^

C. M. Allen Nuclear Licensing Administrator im Attachments cc: Dr."A. Bournia - NRR OCl Resident Inspector - LSCS M. C. Parker - IDNS I[(