Forwards Safety Insp Rept 50-457/87-08 on 870217-20.No Violations Noted
ML20212N395
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/10/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212N396 List:
References
NUDOCS 8703130006
Download: ML20212N395 (2)


See also: IR 05000457/1987008

Text

- _

. - -.

'lD I

-

>O

MN110 1961

Docket No. 50-457

Connonwealth Edison Corpany -

ATTN: Mr. Cordell Reed

-Vice President ~

Post Office Box 767

Chicago, IL 60690

Gentleraen:

'

This refers to the routine safety inspection conducted by Messrs. S. G. DuPont

and A. Dunlop of this office on February 17-20, 1987, of activities at the

Braidwood Station, Unit 2, authorized by NRC Construction Permit No. CPPR-133

and to the discussion of our findings with Mr. P. L. Barnes at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas, examined during

the inspection. Within these areas, the inspection consisted of a selective.

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirefrents were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Fublic Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

  • '

~ i nal Si88'E

OriC

Charles W.~ Hehl, Chief

Operations Branch

Enclosure: Inspection Report

No.50-457/87008(DRS)

See Attached Distribution

~

, 8703130006 870310

> PDR ADOCK 05000457

G PDR

i

'

b

RIII RIII III RII R II

I

J2;p

598., I .g

Du' Pant/lc Dunlop 'right Lit le Hehl

3/k /87 3/{ /87. 3/10 /87 3/@/67

3/f/87

' '

- .- - . .

- .- _ . . - _ - - ._ 1?O' .

F

.

MAR 10 M87

Commonwealth Edison Company 2

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Sharblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Su

DCS/RSB (RIDS)pervisor

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, DGC

G. Berry, CGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB