ML20212N369

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-09 & 50-457/87-09 on 870223-26.No Violations Identified
ML20212N369
Person / Time
Site: Braidwood  
Issue date: 03/09/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212N371 List:
References
NUDOCS 8703120459
Download: ML20212N369 (2)


See also: IR 05000456/1987009

Text

,

l

1

.

MAR 9

1987

l

l

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. H. Neisler

of this office on February 23-26, 1987, of activities at Braidwood Station,

Units 1 and 2, authorized by NPF-59 and CPPR-133 and to the discussion of our

findings with Mr. P. Barnes and other members of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Orici.uf Lig.el L7 J. J. H.u rir ~.

'

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Report

No. 50-456/87009(DRS); and

,

No. 50-457/87009(DRS)

'

i

See Attached Distribution

l

3

RIII

RIIh

R

'

[RFI

,

(f(

F&\\

r/Ims

Gardner

Little

Ha rison

33

g.

0703120459 0703C9

PDR

ADOCK 05000456

i (

""

-

-

-

ZE O I

.

.

Commonwealth Edison Company

2

MAR 9

1987

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality AssGrance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB