ML20212N133

From kanterella
Jump to navigation Jump to search
Requests Ref Matl Required for Requalification Program Evaluations by 870413 for NRC 870615-22 Evaluation Visits Consisting of Prepared Written,Oral & Simulator Exams
ML20212N133
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/10/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
References
NUDOCS 8703120369
Download: ML20212N133 (3)


Text

. .. .. .- .. _. - -. . - --. . ..-

Wut 10 1987.

- Cocket No. 50-282

~

Docket No. 50-306 Northern States Power Company ATTN: Mr. C. E. Larson Vice President, Nuclear Generation 414 Nicollet Mall Minneapolis,'MN 55401

Dear Mr. Larson:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. Dale Brenner, and Mr. Jay Lennartz, arrangements were made for an evaluation of the requalification program at the Prairie Island Nuclear Generating Station. The evaluation visit is scheduled.

for the week of June 15 and June 22, 1987.

For.this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC exaniner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for those examinations. For the examiner to adequately prepare for this visit, t

it will be.necessary for the facility to furnish the approved reference material listed _in Enclosure 1, " Reference Material Requirements for Requalification.

Program Evaluations," by April 13, 1987. Mr. Benner has been advised of our reference material requirements and where they are to be sent.

This-request for information was approved by the Office of Management and Budget

.under Clearance Number 3150-0101, which expires May 31, 1989. Connents on burden and duplication may be directed to the Office of Management and Budget,

~

Reports Management Room 3208, New Executive Office Building, Washington, D. C.

20503.-

Thank you for your consideration in this matter. If you have any questions on the: evaluation process, please contact Jay Lennartz at 312-790-5651.

Sincerely.

Original signea By C. W. Hehl Charles W. Hehl, Chief Operations Branch

Enclosure:

As stated See intached Distribution _

RIII RI III s &

yeTte RJ H1 L artz/lc urdic D;

~3/ ./87 3//j/87 3/ /87 3/ /67  !

8703120369 870310

' 'l DR ADOCK0500g22

( gM

~

Northern States Power Company -2 MAR I 81987 cc w/ enclosure:

E. L. Watzl, Plant Manager DCS/RSB (RIDS)-

Licensing Fee Management Branch Resident Inspector, RIII Prairie Island' Resident Inspector, RIII Monticello Jchn W. Ferman, Ph.D.,

Nuclear Engineer, MPCA State Liaison Officer, State of Minnesota D. Benner, Training Supervisor cc w/o enclosure:

D. Dilanni, Project Manager, NRR J. Hannon, Branch Chief, OLB

,-----i-. w --

ENCLOSURE 1 Reference Material Requirernents for Requalification Program Evaluation

1. All administrative procedures (as applicable to reactor operation or safety)
2. All integrated plant procedures (normal or. general operating procedures)
3. Emergency procedures (emergency instructions, abnonnal, or special procedures)
4.  :-Standing orders (important orders which are safety-related to and may supersede the regular procedures)
5. Fuel-handling and core-loadin procedure, when_ appropriate) g procedures (initial core-loading
6. Annunciatorprocedures(alarmprocedures,includingsetpoints)
7. Radiation protection manual (radiation control manual or procedures)
8. Emergency plan
9. Technical Specifications
10. Lesson plans (training manuals, plant orientation manual, systems descriptions)
11. Systems operating precedures
12. Pipirig and instrumentation diagrams, electrical single-line diagrams, or flow diagrams

-13. Copies of facility R0 and SR0 requalification examinations administered

, during the past 2 years ,

, '14. An index of administrative, operating, abnorical and emergency procedures

15. Plant technical data (curve) book
16. Simulator malfunction list with descriptive sumary of malfunction effects.

All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be accepteble. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

_ . . . _ _ . . . - _ - _ _ . - _ _ , . . _ . _ . _- _