y J,
,
.
,
. .
MAR 0 3 1987
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: . Mr. J. W. Gallagher
Vice President
Nuclear Operations
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection Report Nos. 50-277/87-03; 50-278/87-03
A routine safety inspection was conducted by Mr. H. Bicehouse of this office
on January 26-30, 1987, of the water chemistry control program at the Peach
Bottom Atom,c Power Station, Delta, Pennsylvania of activities authorized by
NRC License Nos. DPR-44 and DPR-56. Our findings were discussed with
Mr. R. Fleischmann and others of your staff at the conclusion of the inspection
on January 30, 1987.
.
The areas examined during this inspection are described in the NRC Region I
combined Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel and observations by the
inspector.
Within the scope of this inspection, no violations were observed.
,
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
'
Or gina) signad B7:
h'omasT.M
.-
tn Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Combined Inspection Report Nos. 50-277/87-03 and
50-278/87-03
0FFICIAL RECORD COPY
CIR PB 87-03 - 0001.0.0
O
8703120365 EI70303
1
'*'
ADOCK 05000277
I
)
O
-- - - - .
.-
..
'
Philadelphia Electric Company
2
cc w/ enc 1:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Senior Vice President, Engineering and Production
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
G. Leitch, Nuclear Generation Manager
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Region I Docket Room (with-concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
Robert J. Bores, DRSS
.
Tj.73
\\
/Y
RI:DRSS
RI:DRSS
LB Sh
Bicehouse/fi
Pasciak
Bel amy
03/ 3 /87
03/J/87
03/,3/87
0FFICIAL RECORD COPY
CIR PB 87-03 - 0002.0.0
03/02/87