Forwards Requalification Exam Rept 50-237/OL-87-02 Administered on 870126-30.Requalification Program Assigned Overall Program Rating of Unsatisfactory.Written Response to Items 3.b,3.c & 3.e Requested
ML20212M752
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/06/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212M753 List:
References
NUDOCS 8703120168
Download: ML20212M752 (2)


Text

,

o

L

/

Docket No. 50-237 ~

Docket No. 50-249 Commormealth Edison Company ATTH: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT On January 26-30,1987, the hRC administered requalification examinations to employees of your company who hold licenses to operate your Dresden Nuclear Power Station. At the conc 1Lsion of the examination, any generic findings that evolved as a result of the examiinations were discussed with those members of your staff identified in the enclosed report.

As a result of this evaluation of your requalification program it has been assigned an overall prograai rating of unsatisfactory in accordance with the criteria of NUREG 1021 ES 601. A written response to !tems 3.b. 3.c. and 3.e of the enclosed exan11 nation report is requested.

In accordance with 10 CFR 2.790 of the Commissiens regulations, a copy of this letter and the enclosures will be placed in the NRC Public Docunwnt Room.

Shobid you have any que tions concerning this examination, please contact us.

Sincerely.

0703120160 070306 UI8144I 81 M IF 0. W. Hehl I'DH ADOCK 0500 7

Charles W. Hehl, Chief Operations Branch

Enclosures:

1.

Examination Report No. 50-237/0. 67 02 2.

Examination and Answer Key (SR0/RO)

See Attached Dis _tr_ibu_t_153 Rf R

RI rih

.q N( to d

w;lls/lc Buhitek Boyd Hel Hi 3/4/87 3/4/87 3/4/87 3/p/87 Jd3A

7 --

D l

[

Cosmonwealth Edison Company 2

i.

cc w/ enclosure:

D. L. Farrar Director of Nuclear Licensing J. Eenigenburg, Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division R. Zank, Plant Training Manager T. Szymanski, Branch Chief, OLB

' R. Gilbert, Project Manager, NRR A. Vinnola, Contract Exam Supervisor, INEL h

e

.