ATTACIMENT I Page 1 of 2 NUMBER OF PERSONNEL AND MAN REMS BY WORK AND JOB FUNCTION TMI UNIT 1 REPORT PERIOD 01/01/86 - 12/31/86 JOB CATEGORY JOB FUNCTION STATION PERSONNEL UTILITY PERSONNEL CONTRACTOR PERSONNEL NIMBER REMS NUMBER REMS NLMBER REMS REACTOR OPERATIONS /SURV.

MAINTENANCE PERSONNEL 77 1.083 0 .000 26 .028 OPERATING PERSONNEL 87 14.432 0 .000 6 .011 HEALTH PHYSICS PERSONNEL 76 28.390 2 .01 0 12 .091 SUPERVISORY PERSONNEL 74 2.984 2 .004 5 .01 5 ENGINEERING PERSONNEL 65 2.624 12 .044 32 .335 ADMINISTRATIVE PERSONNEL 98 .405 4 .005 38 .168 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL 139 25.902 1 .000 184 5.854 OPERATING PERSONNEL 84 1.488 0 .000 4 .033 HEALTH PHYSICS PERSONNEL 36 953 2 .005 2 .000 SUPERVISORY PERSONNEL 68 2.525 2 .003 14 .210 ENGINEERING PERSONNEL 65 .803 20 .158 69 1.776 1

ADMINISTRATIVE PERSONNEL 86 .408 3 .014 30 .273 INSERVICE INSPECTION MAINTENANCE PERSONNEL 109 4.250 0 .000 73 6.785 i OPERATING PERSONNEL 36 2.070 1 .005 8 2.254 HEALTH PHYSICS PERSONNEL 4 .115 0 .000 1 .000 SUPERVISORY PERSONNEL 53 1.155 3 . 01 0 8 .104 4 ENGINEERING PERSONNEL 39 .666 16 .063 57 4.414 i ADMINSTRATIVE PERSONNEL 29 .424 0 .000 21 2.119 r

1 G70312010g 979999

{PR ADOCK 05000289 PDR

4 ATTACMENT I .Page 2 cf 2 ,

NIMBER OF PERSONNEL AND MAN REMS BY WORK AND JOB FUNCTION 4

JOB CATEGORY i JOB FUNCTION STATION PERSONNEL UTILITY PERSONNEL CONTRACTOR PERSONNEL -

NtMBER REMS NtMBER REMS NIMBER REMS SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 111 10.080 0 .000 .450 67.457 OPERATING PERSONNEL 53 9.761 0 .000 7 .122 HEALTH PHYSICS PERSONNEL 16 1.091 0 .000 3 .003

~f i SUPERVISORY PERSONNEL 48 4.1 61 0 .000 20 .593 ENGINEERING PERSONNEL 37 4.928 8 .079 65 6.993 ADMINISTRATIVE PERSONNEL 20 .789 0 .000 24 1.814

, o l WASTE PROCESSING l MAINTENANCE PERSONNEL 36 2.233 0 .000 17 .140 i

OPERATING PERSONNEL 30 11.009 0 .000 2 . 140

, HEALTH PHYSICS PERSONNEL 11 .038 0 .000 0 .000 1 SUPERVISORY PERSONNEL 10 .530 0 .000 1 .000

! ENGINEERING PERSONNEL 7 .117 0 .000 5 .001 ADMINISTRATIVE PERSONNEL 7 .008 1 .000 1 .000 i

REFUELING

! MAINTENANCE PERSONNEL 61 5.337 0 .000 23 .555  !

j OPERATING PERSONNEL 17 .211 0 .000 0 .000 HEALTH PHYSICS PERSONNEL 5 .078 0 .000 0 .000 SUPERVISORY PERSONNEL 16 1.067 0 . 000 3 .020 ,

ENGINEERING PERSONNEL 8 .266 3 .036 13 .233  !

l ADMINISTRATIVE PERSONNEL 7 .020 0 .000 3 .017

-t
  • TOTAL BY JOB FUNCTION
  • l MAINTENANCE PERSONNEL 144 48.885 1 .000 479 80.819 j OPERATING PERSONNEL 91 38.971 1 .005 16 2.560
HEALTH PHYSICS PERSONNEL 79 30.665 3 . 01 5 13 .094
SUPERVISORY PERSONNEL 100 12.422 4 .017 23 .942

. ENGINEERING PERSONNEL 97 9.404 31 .380 116 13.752 1 21 2.054 8 .019 60 4.391 ADMINISTRATIVE PERSONNEL 142.401 48 436 707 102.558

    • GRAND TOTAL ** 632

ATTACHMENT II AIRCRAFT MOVEMENTS AT THE HARRISBURG INTERNATIONAL AIRPORT JANUARY 1 THROUGH DECEMBER 31, 1986 ,

l Itinerant Air Carrier 13,913 Air Taxi 35,602 General Aviation 35,538 Military 8,474 93,527 Local Civil 59,708 Military 21,044 80,752 TOTAL 174.279 Movement of aircraf t larger than 200,000 pounds-!!,*

  • NOTE: Total movement indicated in the 1985 report was the flights in.

Total should have included outgoing flights. Therefore correct total for 1985 is 44, not 22 as listed.

ATTACHMENT III

'PAGE 1 of 3 1

ATTACHMENT 1 i

ANNUAL REPORT REGARDING THE PERIODIC LEAK REDUCTION PROGRAM TESTS (T.S . 6. 9.1.B. 3) .

Table I of this memorandum summarizes the results of the Leakage Reduction Program tests and inspections by procedure number that were performed between January 1 and December 31, 1986. Component identification of those components found to be leaking and the type repair (if required) are included in Table I. Leaking components were repaired and retested such that the leakage was reduced from as found.

NOTE:

In the 1985 Leakage Reduction Program Report, the last procedure number listed in Table 1 should have read 1303-11.50.

ATTACHMENT III PAGE 2 of 3 TABLE I COMPONENT TYPE REPAIR PER-SURVEILLANCE DATE OF IDENTIFI- _ LEAKAGE FORMED PRIOR TO PROCEDURE NO. PERFORMANCE CATION AS FOUND AS LEFT AS LEFT TEST 1303-11.16 (See Note 1) (See Note 1) N/A N/A N/A 1303-11.18 (See Note 2) (See Note 2) 97,845 SCCM 28,213 SCCM (See Note 2) I J.I. dCK513 1303-11.27 11/03/86 ~MU-P1A .351 R/hr (See Note 3) -(See Note 3)

Inboard Seal MU-V-68B .075 R/hr (See Note 3) J.T. #CL573 i

(See Note 3)

MU-P-1A .222 1/hr (See Note 3) J.T. #CL266 Disch. Drain (See Note 3)

Flange MU-P-1A .006 R/hr (See Note 3) (See Note 3)

Outboard S eal MU-P-lC .051 1/hr (See Note 3) (See Note 3)

Inboard Seal MU-Plc .024 R/hr (See Note 3) (See Note 3)

Outboard Seal MU-V-89B .012 R/hr (See Note 3) J.T. #CL358 (See Note 3)

MU-V-196A .006 1/hr (See Note 3) J.T. #CL281 (See Note 3)

MU-V-197B .003 t/hr (See Note 3) J.T. #CK313 (See Note 3)

MU-V-229B .012 E/hr (See Note 3) J.T. #CK233 (See Note 3) 1303-11.28 (See Note 1) (See Note 1) N/A N/A N/A 1303 ,11.29 (See Note 1) (See Note 1) N/A N/A N/A 1303-11.30 (See Note 1) (See Note 1) N/A N/A N/A 1303-11.31 11/17/86 J102 Valve 1 cc/sec 0 Cleaned and applied Threaded thread sealant Connection "B" H, Re-combiner i

l 1303-11.50 (See Note 1) (See Note 1) N/A N/A N/A l TOTAL "AS LEFT" Leakage -

SeeNote3forLiquid) See Note 4 28213 SCCM - Gaseous j

2/hr = Liters per hour SCCM = Standard cubic centimeters per minute

~

ATTACHMENT III PAGE 3 of 3 TABLE I (CONTINUED)

Note 1: Not performed in 1986 since required performance is once each refueling interval. Past performance occurred -in 1985, and since.the 6R refueling which began in late 1986 was scheduled to last into early 1987, this surveillance was scheduled for performance during the 6R Refueling interval in early 1987.

Next year's Annual report will include these 1987 results.

Note 2: A complete round of tests for.this surveillance was performed in 1986. However, the exact performance of tests occurred on different dates during the 1986 calendar year. . Repairs were initiated on the following components due to higher than desirable leakage. .

1. CA-V5A - Stem packing leakage repair.
2. RB-V7 - Stem packing leakage repair.
3. IC-V3 - Extensive seat / wedge work.
4. CA-V189 - Lubricated stem - retest.

Note that per TMI-l Technical Specification 4.4.1, total local leakage less than 104,846 SCCM is considered acceptable.

- Note 3: "As Left" tests were not performed during 1386. Plant conditions during the 6R Outage in 1986 did not permit or make it practical to align and operate the Make-Up and Purification System solely for the purposes of repeating the applicable testing. Suitable repair work and applicable retests will be completed in-1987 prior to return of TMI-1 to power operation following the 6R Outage.

Note 4: The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> site boundary and 30 day low population zone offsite dose considerations were not limiting conditions for acceptable leakage criteria in 1986. All "as-found" or "as-left" leakage recorded did not significantly increase the magnitude of either on or off-site releases during 1986.

i i

f

ATTACINENT IV l

Pressurizer Power Operated Relief Yalve and Pressurizer Safety Valve ,

Challenges for Calendar Year 1986. '

There were no pressurizer power operated relief valve or pressurizer safety valve challe6ges which occurred during 1986.

ATTACHMENT V Page 1 of 4 RESULTS OF SPECIFIC ACTIVITY ANALYSES - PRIMARY COOLANT SYSTEM OCCURRENCE NO. 86-01 ,

IODINE INPUT EUR 1986 ANNIF4 REPORT DOSE POWER IQ. I-131 IEI1X W I-133 DATE TIME %FP pCi/mi 5 GPM PCi/mi 03/13/86 0030 99.58 .147 45 .161 03/14/86 0720 99.7 .129 45 .146 03/15/86 0710 99. .128 45 .145 03/15/86 1001 0 - - -

03/15/86 1205 0 .246 - -

03/15/86 2345 12. 1.56 - -

03/16/86 0330 60 1.69 45 -

03/16/86 0730 82 1.03 45 .463 03/16/86 1130 90.8 .848 45 -

Time frem >1.0pci/mi to <1.0pci/mi = 11.75 Hours

ATTACHMENT V Page 2 of _4 0CCURRENCE NO. 86-02 ICDDE INPUT EUR 1986 ANNUAL REPORT DOSE POWER EQ. I-131 IEIDOWN I-133 DATE TIME %FP uCi/ml t 5 GPM PCi/ml

06/01/86 0030 99.45 .1079 45 .136 06/02/86 0230 99.7 .1134 45 .135 06/02/86 1411 0 - - -

06/02/86 1630 0 .228 30 -

06/03/86 0045 5 1.40 - -

06/03/86 0440 10 1.31 70 06/03/86 0740 23 1.11 24 06/03/86 1025 87 .984 23 06/04/86 0001 99.9 -

45 . 261 Time frczn >1.0pci/mi to <l.0pci/ml = 9.83 Hours 1

4 I

e f

4 e

y a . - - - - , -~ ..n-. - - . ~ , , -- n, . - - - - , , , , , ,, .m ,. ,n , ,f ., ,. - - , ,. . . -, -,

ATTACHMENT V Page 3 of 6 0CCURRENCE NO. 86-01 Dose Equiv. lodine 131 and lodine 133 10 Legend e Dose Equivalent lodine M lodine 133 a

x 0 e'

.E

=EI a-E xe e

b 8

U l 9 l

l 2 i !

l ll X X 4 e l

i 0.1-3 8 6 3 8 6 3 8 6 3 8 6 l Date l

l l

l

ATTACHMENT V Page 4 of 4 0CCURRENCE NO. 86-02 Dose Equiv. lodine 131 and lodine 133 10 Legend e oo.. Equivalent lodine M lodine 133

-: e 9

5 b

E e

o -

i

, H l M M O.1 < >

e l 6-1-86 6-2-86 6-3-86 6-4-86 Date

__f

ATTACHMENT VI Technical Specification Section 6.17 requires reporting of " Major Changes to Radioactive Waste Treatment Systems." Major changes are interpreted to mean changes that would change how the system functions or changes the predicted releases that were previously analyzed.

Based on the above, no miljor changes were made during 1986.

l l