Monthly Operating Rept for Oct 1986
ML20212M075
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1986
From: Evans S, Randolph G
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1402, NUDOCS 8701290501
Download: ML20212M075 (6)


Text

.-

'e y -

.)

4 DOCKET NO.

50-483 UNIT NAME~

CALLAWAY UNIT 1 DATE 11/7/86 COMPLETED BY S. R. EVANS 3

TELEPHONE-314/676-8742 1

PART A OPERATIONS SLM1ARY The plant operated near full power for the entire month. A load reduction was initiated at the-end of the month due to fuel management considerations. Work is continuing on control board annunciators and controls to reduce the work request backlog, 4

PART B PORY AND SAFETY VALVE

SUMMARY

None l

l l

CA-#804 04/10/85 j

qDP-ZZ-04204 DO 862031 '

R 05000483 i

Page 1 of 4 ppg Nb I/

g.:

7,,;...

Prrt C AVEP. AGE DAILY UNIT POWER LEVEL 9

DOCKET NO.

'50-483 UNIT NAME CALLAWAY UNIT 1 DATE 11/7/86 COMPLETED BY.

S. R. EVANS l

TELEPHONE 314/676-8742 MONTH:

OCI0BER 1986' AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DA,Y,.

(MWe-Net) g (MWe-Net)

Y 1

1098 17 1108 2

1096 18 1106 a

3 1091 19 1006 4

1097 20 1070 5

1081

. 21 1096 1

6

'1085 22 1100 7

1101 23 1102 1'

8 1099 24 1105 9

1104 25 1105 10 -

1109 26 1108 11 1099 27 1104 12 1108 28 1100 13 1115 29 977 14 1114 30 863 15 1105

, 31 862 16 1106.

4 CA-#804 04/10/85 QDP-ZZ-04204 t

Tage 2 of 4 i

k

-. ~.

...~-...

_.~__.

W e c.

.Ptrt D

'jp g';

. OPERATING DATA REPORT.

s m.

DOCKET NO.

50-483 LUNIT NAME CALLAWAY UNIT 1'

'DATE.

11/7/86 COMPLETED BY S. R. EVANS TELEPHONE-314/676-8742 OPERATING STATUS -

(YTD'

' CUM )

1.

REPORTING PERIOD:" October 1986 GROSS HOURS IN REPORTING PERIOD:

745 (7296 16358.5)

A 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3f.11

.' MAX.. DEPEND. CAPACITY (MWe-Net):

1120

. DESIGN ELECTRICAL RATING ( We-Net):

1171*

  • At. stretch power level which is not currently authorized under the Operating License.

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

100%

4.

REASONS POR RESTRICTION (IF ANY):

THIS MONTH

.YR TO DATE CUMULATIVE-5.

NUMBER OF HOURS REACTOR WAS CRITICAL...............

745 5842.6 14306.1

.)

6.-

REACTOR RESERVE SHUTDOWN H0URS'.....................

0 0 --

O a

l 7.

HOURS CENERATOR ON LINE............................

745 5660.5

.13847.9 8.

UNIT RESERVE SHUTDOWN HOURS.'.......................

0 0

0' i

9.' GROSS THERMAL ENERGY GENERATED (WH)............... 2,478,466' 18,074,928 44,092,481

10. CROSS ELECTRICAL ENERCY GENERATED (MWH)............

843,456 6,079,432 14,893,375

-11.

NET ELECTRICAL ENERGY CENERATED (MWH)..............

803,187 5,772,665 14,141,452

12. REACTOR SERVICE FACIUR..............................

100%

80.1%

87.5%

13. REACTOR AVAILABILITY FACTOR........................

100%

80.1%

87.5%

14. UNIT SERVICE FACTOR................................

100%

77.6%

84.7%

l

15. UNIT AVAILABILITY FACIOR...........................

100%

77.6%

84.7%

1..

16. _ UNIT CAPACITY FACTOR (Using MDC)...................

96.3%

70.6%

77.2%

l

17. UNIT CAPACITY FACTOR (Using Design MWe)............

92.1%

67.6%

73.8%

18. UNIT IURCED OUTACE RATE............................

0.0%

4.2%

5.4%

-19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONIES (TYPE, DATE, AND DURATION OF EACH): None

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

I-l CA-#804

].

04/10/85 QDP-ZZ-04204 Page 3 of 4 k.

., s,:

. /* -

Part E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 11/7/86 COMPLETED BY' S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: OCTOBER 1986-METHOD OF TYPE SFUTTING DOWN F: FORCED DURATION TFE REACIOR OR' DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS None

+

SUMMARY

l 1

i REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN)-

1: MANUAL l

B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OFERATIONAL ERROR (EXPLAIN)

CA-#804 H: OTHER (EXPLAIN)

.04/10/85 QDP-ZZ-04204

. Page 4 of 4

.W

-.s ymog Etscriac a

Casaway Plant November 12, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1402

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPEP.ATING REPORT OCTOBER 1986 The enclosed Monthly Operating Report for October 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

42dL4 G. L. Randolp Manager, Callaway Plant S/

drs Enclosur cc: Distribution attached d

f?

1 Ma6ng Aadress' PO. Box L% Fthon, MO 65251

s

'. - -.,. 's cc distribution for ULNRC-1402 with enclosures Mr. W. F. Forney, Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014' Director

]

Office of Inspection &-Enforcement

(

U. S. Nuclear Regulatory Commission.

Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102

\\

bMu d

i