e PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 3hly 25, 1986
8 SHIELDS L. DALTROFF ELECTRIC PRODUCTION Docket Nos. 50-277 50-278 50-352 Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
Response to I.E. Bulletin 86-02:
Static "O" Ring Differential Pressure Switches Dated July 18, 1986
Dear Dr. Murley:
The purpose of this letter is to provide the Philadelphia Electric Company (PECo) response to I.E.
Bulletin 86-02 for Peach Bottom Atomic Power Stations Units 2 and 3, and Limerick Generating Station Unit 1.
The Bulletin discussed the erratic performance of Static "O" Ring Differential Pressure Switches at three operating nuclear power plant units.
The concern of the Bulletin is that the switches may be installed in various safety-related systems and could result in substantial non-conservative setpoint drift of engineered safety systems.
The actions required by the Bulletin are restated below followed by our response:
Action Required:
1)
Within seven days, submit a report on the extent to which Model 102 or 103 differential pressure switches are installed (or planned) as electrical equipment important to safety as defined in 10 CFR 50.49(b).
Include in the report:
the model number of the switch, the system in which it is installed (e.g., low pressure safety injection), the application of the switch (e.g., water level measurement, system flow measurement), and the function of the switch (e.g., control of minimum flow recirculation valve).
A negative report, if appropriate, is required.
['[
8608230342 860723 PDR ADOCh 05000277 v
G PDR v
's Dr. Thomas E. Murley July 25, 1986 Page 2
Response
A comprehensive review of the engineered safety systems at Peach Bottom Atomic Power Station Units 2 and 3 and Limerick Generating Station Unit 1 has been conducted.
No Static "O" Ring Model 102 or-103 Differential Pressure Switches are installed or planned to be installed as electrical equipment important to safety as defined in 10 CFR 50.49(b) at these units.
Should you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours,
{O j
4 /c= s/,,(
cc:
T.
P. Johnson, PB Resident Site Inspector E.
M.
Kelly, LGS Senior Resident Site Inspector Document Control Desk (USNRC)
L
b COMMONWEALTH OF PENNSYLVANIA ss.
COUNTY OF PHILADELPHIA S.
L. Daltroff, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing response to I.E. Bulletin No. 86-02 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
/ /,L.
-l i 4 i
Subscribed and sworn to before me thisaf day l
of 3wl, OS4-l 0 a A %f'), nae d L:
/
'A I
Notary Public JUDITH Y. FRANKLIN I
Notary Public, Phila, Phila. Co.
My Commission Empires July 28,1987 i
I i