ML20212L949

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1986
ML20212L949
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1986
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP860618, NUDOCS 8701290444
Download: ML20212L949 (5)


Text

., _

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY L.P.Bregni DATE November 14, 1986 TELEPHONE (313)586-5313 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes l

2.

REPORTING PERIOD:' October, 1986 l

l 3

LICENSED THERMAL POWER (MWL): 3292 l

l 4.

NAMEPLATE RATING (GROSS MWe):

1215 l

l 5.

DESIGN ELECT RATING (Net MWe): Ic93 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7.

MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REFORT, GIVE REASONS:

None 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

218.6

10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 969.9 969.9
12. HES REACTOR WAS CRITICAL 354.6 401.8 401.8
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

[

14. HOURS GENERATOR ON-LINE 61.25 69.75 69.75
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGEY GEN (MWH) 120,847 130,783 130,783
17. GROSS ELECT ENERGY GEN (MWH) 4880 5620 5620
18. NET ELECT ENERGY GEN (MWH)

-8500

-8500

-8500

19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET)

N/A N/A N/A

22. UNIT CAP FACTOR (USING DER NET)

N/A N/A N/A

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON (TYPE, DATE, DURATION OF EACH) N0l!9
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87

  1. To be determined ch034I DOCK

' I PDR f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 DATE November 14, 1986 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 76.9

~

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 48.5 6

0 22 38.7 7

0 23 68.2 8

0 24 0

9 0

3 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 55.4 16 54.6

e O

e UNIT SHUTDOWNS AND POWER PFMICTIONS DOCKET NO.

5D-341 DATE November 14 1986 UNIT NAME Fermi 2 COMPLETED BY L.

P.

Breoni TELEPHONE (313)586-5313 REPORT MONTH October METHOD OF SHUTTING HO.

DATE F: FORCEO DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS S: SCHEDULED (HOURS)

(1)

OR REDUCING POWER POWER (2) 86-01 861001 F

67.3 A

2 Shut down continued from last month to repair condenser tube leaks to meintain proper reactor coolant chemistry, l

1 I

l 86-02 861005 F

44.4 A

2 While attempting to start up the j

main turbine generator, the Gland Sealing Steam pressure regulator l

malfunctioned. Reported in LER 86-035 dated November 3, 1986.

I i

l 86-03 861009 F

103.8 A

2 Management decision to shut down while investigating the loss of l

120 Vac instrument power.

l Reported in LER 86-036 dated i

November 7, 1986.

I (1)

REASONS A.

EOUIPMENT FAILURE (EXPLAIN)

E. OPERATOR TRAINING AND LICENSE EXAMINATION B. MAINTENANCE OR TEST F.

ADMINISTRATION C. REFUELING G. OPERATIONAL ERROR (EXPLAIN)

D. REGULATORY RESTRICTION H. OTHER (EXPLAIN)

(2)

METHOD 1.

MANUAL

3. AUTOMATIC SCRAM
2. MANUAL SCRAM
4. OTHER (EXPLAIN) i

e o

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-341 DATE November 14 1986 UNIT NAME Fermi 2 COMPLETED BY L.

P.

Bregni TELEPHONE (313)S86-5313 REPORT MONTH October METHOD OF SHUTTING NO.

DATE F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS S: SCHEDULED

.(HOURS)

(1)

OR REDUCING POWER POWER (2)

I 85-04 861018 F

24.4 A

3 Reactor pressure regulator l

malfunctioned causing low level reactor trip.

Reported in LER 86-040 dated November 17 1986.

86-05 861023 S

149.5 8

2 Performed shutdown using remote shutdown panel. While shut down performed repairs to Reactor Recirculation Motor Generator Set A.

l t

~

(1)

REASONS A.

EQUIPMENT FAILURE-(EXPLAIN)

E. OPERATOR TRAINING AND LICENSE EXAMINATION B. MAINTENANCE OR TEST F.

ADMINISTRATION C. REFUELING G. OPERATIONAL ERROR (EXPLAIN)

D.

REGULATORY RESTRICTION H. OTHER (EXPLAIN)

(2)

METHOD 1.

MANUAL

3. AUTOMATIC SCRAM
2. MANUAL SCRAM
4. OTHER (EXPLAIN)
g..

Robert 5. Lenart Plant Managm v0 Dekoi!

r.,->- 2 November 14, 1986 Edison %ik"OSQ$$*//

6 NP860618 Nuclear

+., - -

U. S. Nuclear Regulatory Commission Attention:

Director, Office of Resource Management Washington, D.C.

20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No.

50-341 NRC Operating License No.

NPF-43

Subject:

Monthly Operating Status Report for October, 1986 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for October, 1986.

This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

SincereJy, bUilde b-

)

R.

S. Lenart Plant Manager i

Enclosure cc:

J. R. Eckert D. R. Hahn J. G. Keppler W. G. Rogers J. J. Stefano G. C. Wright USNRC Document Control Desk Washington, D. C.

4 7

/,?

.. _ _ _ -