Monthly Operating Rept for Oct 1986
ML20212L340
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/31/1986
From: Newburgh G, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-9701, NUDOCS 8701290418
Download: ML20212L340 (5)


Text

h J

e, 4s W4+

4

+da-6 mm 4

-4

&b

>A

=4-A-~

.-a

'on-,

b A

4 m

t

' ?

' AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO. 50-245' UNIT Millstone 1

-DATE 861103 COMPLETED BY G. Newburght TELEPHONE (203) 447-1791 X4400 MONTH October, 1986 DAY' AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL-(MWe-Net)

(MWe-Net) i:

1 646 17 584

?.

2 646 18 654 3.

648 19 655-4 648 20 654 5

639 21 653

~6 650 22 653 7-652 23 652 4

.8' 651-24 600 9-416 25 654 10 633 26 682*

11 654 27 588 12 654 28 656 l';

I 13

- 653' 29 656 i

14 653' 30 656 15 649 31 657 i:

116 654-

~

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

L a

l-i 8701290418 861031 i

PDR ADOCK 05000N45

{

R PDR 9'f

e

~

OPERATING DATA REPORT DOCKET NO. 50-245 DATE 861103 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 X4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes

  • Change To Eastern 2.

Reporting Period: October, 1986 Standard Time 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net MWe): 660 6.

Maximum Dependable Capacity (Gross ~MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons'For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period

  • 745 7296 139584 12.

Number Of Hours Reactor Was Critical

^745 7112.4 108191.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line

^745 7095 105260.2 15.

Unit Reserve Shutdown Hours 0

183.7 277.4

16. Gross Thermal Energy Generated (MWH) 1460136 13976358 194590556
17. Gross Elec. Energy Generated (MWH) 496700 4749600 65450896 18.

Net Electrical Energy Generated (MWH) 475081 4541333 62431105 19.

Unit Service Factor 100 97.2 75.4 20.

Unit Availability Factor 100 99.8 75.6 21.

Unit Capacity Factor (Using MDC Net) 97.5 95.2 68.4 22.

Unit Capacity Factor (Using DER Net) 96.6 94.3 67.8 23.

Unit Forced Outage Rate 0

0.6 11.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION h.

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS-UNIT NAME Millstone 1 DATE 861103 COMPLETED BY G.-Newburgh-REPORT MONTH OCTOBER, 1986 TELEPHONE (203) 447-1791 x4400 l

2 No.

Date Type Duration

-Reason Method of Licensee.

Systeg Compogent Cause & Corrective, (Hours)

Shutting Event Code -

Code Action to 3

Down Reactor Report #

Prevent Recurrence 7

861009 5

0 B

5 N/A N/A N/A Power Reduction to' find and repair condenser tube leaks.

(

i 1

1

'4 l

1 2

3 4

i F:

Forced Reacor.:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 3

[

B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source.

H-Other (Explain) 6-Other (Explain).

p t

9

REFUELING INFORMATION RE00EST 1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown:

May 1987 3.

Schedule date for restart following refueling: August 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

(1) Maximum Average Pla'nar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Spring 1987 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE88 Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

In Core: (a) 580 (b) 1536 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.

.O UEU General Offices

  • Selden Street, Berlin, Connecticut P.O. BOX 270 aa,7j'1,,7[ C ~,,

HARTFORD, CONNECTICUT 06141-0270 k

J (203) 665-5000 www ucu

,wecc.

November 10, 1986 MP-9701 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY h0i W. D. Romb rg Station Superintendent Millstone Nuclear Power Station WDR/GSN:rg

Enclosures:

(

)

Regional Administrator, Office of Inspection and Enforcement, Region I cc: