ML20212L293
| ML20212L293 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/18/1986 |
| From: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hauspurg A CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20212L298 | List: |
| References | |
| EA-84-092, EA-84-92, NUDOCS 8608250280 | |
| Download: ML20212L293 (3) | |
See also: IR 05000247/1986017
Text
.=
- .
s
D-
.
AUG 181986
Docket No. 50-247
License No. DPR-26
EA 84-92
Consolidated Edison Company of
New York, Inc.
ATTN: Mr. Arthur Hauspurg
President
4 Irving Place
Gentlemen:
Subject:
Completion of Requirements of Order Modifying License
(Inspection Report No. 50-247/86-17)
On September 27, 1984, an Order Modifying License was issued to Consolidated
Edison Company of New York which required the submittal to the NRC, for review
and approval, of (1) an action plan for upgrading the radiological controls
program at Indian Point Nuclear Generating Station Unit 2, (2) specific interim
actions while the program was being developed and implemented, and (3) a
charter for a Senior Oversight Committee to monitor the upgrade. Your sub-
mittals of November 21, 1984, February 5,1985 and February 15, 1985 in re-
sponse to the Order were reviewed, and approved in my letter dated April 12,
1985.
.
We have been continually monitoring your progress in upgrading the Radiological
Controls program, and have most recently performed a special Health Physics
Appraisal inspection during the week of June 16, 1986. Based on the results of
this Appraisal (Reference enclosed Report 50-247/86-17) and the previous in-
spections, we have determined that your implementation of the action plan was
thorough and complete, and all terms of the order have been satisfactorily
completed.
'
No reply to this letter is necessary. Thank you for your cooperation in this
matter.
Sincerely,
OrigTnal signed by
Thomas L.MNEA%
Thomas E. Murley
.
Regional Administrator
Enclosure: As stated
8608050280 860318
ADOCK 05000247
l
e l
G
7
' >
0FFICIAL RECORD COPY
IR IP2 86-17 - 0001.0.0
-
08/15/86
//'
'
!
>
.
- ..
.'
'
Consolidated Edison Company of
2
f. New York, Inc.
.
cc w/ enc 1:
M. Selman, Vice President, Nuclear Power
J. D. O'Toole, Vice President, Nuclear Engineering, Quality Assurance and
Reliability
M. Blatt, Manager of Regulatory Affairs
R. L. Spring, Nuclear Licensing Engineer
P. Kokolakis, Director, Nuclear Licensing
Brent L. Brandenburg, Assistant General Counsel
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear -Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
Robert J. Bores, DRSS
Section Chief, DRP
SECY
CA
J. Taylor, IE
J. Axelrad, IE
T. Murley, RA
J. Lieberman, ELD
Snfezak, DEDR0GR
Enforcement Specialists
RII, RIII, RIV, RV
F. Ingram, PA
S. Connelly, 0IA
B. Hayes, OI
H. Denton, NRR
J. Crooks, AE00
E. Flack, IE
E. Jordan, IE
!.
IE:ES
!
EA File
EDO Rdg File
~
!
i
!
0FFICIAL RECORD COPY
IR IP2 86-17 - 0002.0.0
08/15/86
i
]
.
'
.
'
Consolidated Edison Company of
3
New York, Inc.
h
k
h
Y
pr
RI:DRSS
RI:DRSS
RI:BNL /*'
RI:IE F
RI:DRSS M
DLeQuia
AWeadock
AHull
JWigginton
TDragoun
8/ 7 /86
8/7 /86
8/ 7 /86
8/ 7 /86
8/7 /86
RI:DRSSg
RI:
RI
RI:01
R
MShanbaky
8/,}/86
RBe 1amy
TMaftin
Holody
G
z
1
8/ 7 /86
3
8/g/86
8/9/86
8
RI:DRA
[bA
RI:IE
RI:IE
Allan
Mu
y
Axelrad
Taylor
8/ /86
8/
86
8/ /86
8/ /86
cadh
f/w~ h N
sle/*0FFICIALRECORDCOPY
er
IR IP2 86-17 - 0002.1.0
08/07/86