ML20212L293

From kanterella
Jump to navigation Jump to search
Forwards Health Physics Appraisal Rept 50-247/86-17 on 860616-20,per 840927 Order Modifying License to Require Submittal of Action Plan for Upgrading Radiological Control Program at Facility.Implementation of Action Plan Complete
ML20212L293
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/18/1986
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hauspurg A
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20212L298 List:
References
EA-84-092, EA-84-92, NUDOCS 8608250280
Download: ML20212L293 (3)


See also: IR 05000247/1986017

Text

.=

.

s

D-

.

AUG 181986

Docket No. 50-247

License No. DPR-26

EA 84-92

Consolidated Edison Company of

New York, Inc.

ATTN: Mr. Arthur Hauspurg

President

4 Irving Place

New York, New York 10003

Gentlemen:

Subject:

Completion of Requirements of Order Modifying License

(Inspection Report No. 50-247/86-17)

On September 27, 1984, an Order Modifying License was issued to Consolidated

Edison Company of New York which required the submittal to the NRC, for review

and approval, of (1) an action plan for upgrading the radiological controls

program at Indian Point Nuclear Generating Station Unit 2, (2) specific interim

actions while the program was being developed and implemented, and (3) a

charter for a Senior Oversight Committee to monitor the upgrade. Your sub-

mittals of November 21, 1984, February 5,1985 and February 15, 1985 in re-

sponse to the Order were reviewed, and approved in my letter dated April 12,

1985.

.

We have been continually monitoring your progress in upgrading the Radiological

Controls program, and have most recently performed a special Health Physics

Appraisal inspection during the week of June 16, 1986. Based on the results of

this Appraisal (Reference enclosed Report 50-247/86-17) and the previous in-

spections, we have determined that your implementation of the action plan was

thorough and complete, and all terms of the order have been satisfactorily

completed.

'

No reply to this letter is necessary. Thank you for your cooperation in this

matter.

Sincerely,

OrigTnal signed by

Thomas L.MNEA%

Thomas E. Murley

.

Regional Administrator

Enclosure: As stated

8608050280 860318

PDR

ADOCK 05000247

l

PDR

e l

G

7

' >

0FFICIAL RECORD COPY

IR IP2 86-17 - 0001.0.0

-

08/15/86

//'

'

!

>

.

..

.'

'

Consolidated Edison Company of

2

f. New York, Inc.

.

cc w/ enc 1:

M. Selman, Vice President, Nuclear Power

J. D. O'Toole, Vice President, Nuclear Engineering, Quality Assurance and

Reliability

M. Blatt, Manager of Regulatory Affairs

R. L. Spring, Nuclear Licensing Engineer

P. Kokolakis, Director, Nuclear Licensing

Brent L. Brandenburg, Assistant General Counsel

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear -Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

Robert J. Bores, DRSS

Section Chief, DRP

ACRS

SECY

CA

J. Taylor, IE

J. Axelrad, IE

T. Murley, RA

J. Lieberman, ELD

Snfezak, DEDR0GR

Enforcement Specialists

RII, RIII, RIV, RV

F. Ingram, PA

S. Connelly, 0IA

B. Hayes, OI

H. Denton, NRR

J. Crooks, AE00

E. Flack, IE

E. Jordan, IE

!.

IE:ES

!

EA File

EDO Rdg File

~

DCS

!

i

!

0FFICIAL RECORD COPY

IR IP2 86-17 - 0002.0.0

08/15/86

i

]

.

'

.

'

Consolidated Edison Company of

3

New York, Inc.

h

k

h

Y

pr

RI:DRSS

RI:DRSS

RI:BNL /*'

RI:IE F

RI:DRSS M

DLeQuia

AWeadock

AHull

JWigginton

TDragoun

8/ 7 /86

8/7 /86

8/ 7 /86

8/ 7 /86

8/7 /86

RI:DRSSg

RI:

RI

RI:01

R

MShanbaky

8/,}/86

RBe 1amy

TMaftin

Holody

G

z

1

8/ 7 /86

3

8/g/86

8/9/86

8

RI:DRA

[bA

RI:IE

RI:IE

Allan

Mu

y

Axelrad

Taylor

8/ /86

8/

86

8/ /86

8/ /86

cadh

f/w~ h N

sle/*0FFICIALRECORDCOPY

er

IR IP2 86-17 - 0002.1.0

08/07/86