3 NARRATIVE
SUMMARY
OF
)
MONTHLY OPERATING EXPERIENCE d
^
OCTOBER 1986 October 1 The Station was in Operational Mode 1 with through Reactor Coolant System at a normal operating i
October 26 pressure and temperature.
October 27 At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> on the 27th, the Unit was removed through from service due to a weld leak on 'C' bypass October 28 feedwater line. Repairs were completed and reactor startup commenced at 0849 hours0.00983 days <br />0.236 hours <br />0.0014 weeks <br />3.230445e-4 months <br /> on the 28th.
Criticality occurred at 0929 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.534845e-4 months <br /> and the tinit was synchronized to the grid at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on the 28th.
October 29 The -Station was in Operational Mode 1 with Reactor through Coolant System at a normal operating pressure and October 31 tempera ture.
/
w,-
8701290360 G61031 PDR ADOCK 0500 4
SE24 a
4
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
11/06/86 COMPLETED BY: P.A. SMITH TELEPHONE:
(412) 643-1825 OPERATING STATUS l
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. kEPORTING PERIOD: OCTOBER 1986
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX, DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
745.0 7296.0 92064.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
717.7 4779.8 50380.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8 14, HOURS GENERATOR VAS ON LINE:
714.1 4732.5 48867.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ETERGY GEN. (MWH):
1845418.0 11755407.4 114778838.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
608530.0 3853130.0 36634530.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
573970.0 3610890.0 34137193.0
- 19. UNIT SERVICE FACTOR: (PidCENT) 95.9 64.9 55.4
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 95.9 64.9 55.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 92.3 59.3 47.7
- 23. UNIT FORCED OUIAGE RATE: (PERCENT) 4.1 5.8 22.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
N/A l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A_ _
N/A COMMERCIAL OPERATION N/A N/A i
1
\\
l 1
AVERAGE DAILY UNIT POWER LEVEL DOCXIT NO.
50-331 UNIT 3'US C::1:
l i
DATE 11/10/86 COMPLETED SY P. A. Smith TELEPHONE (412) 543-1825 l
MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe Net 3 767 825 3
17 2
800 829 g
808 821 3
9 804 4
825 819 23 829 824 6
g 8G9 820 7
23 3
813 821 819 9
25 821 820 10 26 90 1I 871 3
133 825 12 28 817 13 29 753 821 I4 30 is 829 825 3g 817 I
16 i
l INSTRUCTIONS On this format.!ist the average dady unit pinwer lew!in MWe. Net far each day in the reporting inonth. Cuinpute to the nearest whole rnepwart, f4/77)
MAJOR MAINTENANCE 1.
Overhauled Station Air Compressor (SA-C-1B) t u.
l l
l 1
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-314 l
UNIT NAME SVPS Unit #1 DATE 11/10/86 OCTOBER COMPLETED BY P.
A.
Smith i
REPORT MONIH TELEPlIONE [412) 643-1825
'~L cn w so o s*
O "
"c 0St Licensee E*
Cause, & Corrective No.
Date
%8 E
3UE Event 0.
5$
Action to R
95 E
5.E "
Report #
%i E0 Prevent Recurrence H
a M
ymG yU 0
oa 13 861027 F
30.9 A
1 N/A Cll PIPEXX At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> the Unit was removed from service due to a weld leak on
'C' bypass feedwater line.
Repairs were completed and the Unit returned to service at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on the 28th.
1 2
3 4
f I~nied Reasoni:
Hethod:
1 xhibit G - Insioist tionis 5 Sthedu cil A iiguipment Failure (i uplaint t.Manu:i t bn Psepasasi.n os pasa 8
B Maintenance e i Test 2-Manual Scram I non Sheels I.n I.esensec C Relucting 3-Automatic Scram l'$ cal Heran' Il l H i l 'Ir l NilHI G D RcFulatus) Resteiction' 4-Continued Froe*Frevious Month Ollil l l Opceaten Isaining A l.stesise l'zanunalians 5-Reduction 1 - Asinunesseative 9-Other 5
E. Opesainnial I a sin ll mplain t I shihin 1 Sanir Snaisc 08/ U) 11 Ushes 11 splaint e-
- h dE
'Af M
Teiennone (412) 393-8000 Nu ' l l 9 November 8, 1986 OB Shippingport, PA 15077-0004 Bcaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Of fice of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accorda nce with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of October,1986.
O Very truly yours,
/
J. J. Carey Vice President Nuclear Group TW Enclosures cc: NRC Regional Office King of Prussia, PA 6'd
/
,h 1
r JAf Telephone (412) 393-6000 Nuclear Group November 8,1986 P.O. Box 4 Shippingport, PA 15077-0004 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of October,1986.
Very truly yours,