s CC* CORRECTED COPYche I
OPERATING DATA REPORT DOCKET NO.
50-339 DATE 10-01-86 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 OPERATING STATUS 1.
Unit Name:
North Anna 2 2.
Reporting Period:
September, 1986 3.
Licensed Thermal Power (W t):
2893 4.
Nameplate Rating (Gross We):
947 5.
Design Electrical Rating (Net We):
907 6.
Maximum Dependable Capacity (Gross We):
941 7.
Maximum Dependable Capacity (Net We):
893 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons item 3 - 1.icensed Thermal Power (HWt) has been increased from 2775 ffWt to 2893 ttWt as m t hor f ged hv Technical Specification Amendment No. 71.
Itemn 4 through 7 will be revised unon comntetion of reoufred testinn.
9.
Power Level To Which Restricted, If Any (Net We):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 6.551 50,807
- 12. Number of Hours Reactor Was Critical 720 5,143.3 39,459.1
- 13. Reactor Reserve Shutdown Hours 0
1,417.3 5,597.8 14.
Hours Generator On-Line 720 5,047.6 38,707.6
- 15. Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 2,064,328 13,141,863 100,287,268 17.
Gross Electrical Energy Generated (MWH) 683,043 4,351,538 33,231,720
- 18. Net Electrical Energy Generated (MWH) 647,771 4,120,707 31,503,556 19.
Unit Service factor 100 77.1 76.2 20.
Unit Availability Factor 100 77.1 76.2 21.
Unit Capacity Factor (Using MDC Net) 100.7 70.4 69.8 22.
Unit Capacity Factor (Using DER Net) 99.2 69.4 68.4 23.
Unit Forced Outage Rate 0
8.8 11.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 0701290313 061114 i
i PDR ADOCK 05000330 R
PU9 i