@ Ceuumes NUCLEAR OPERATIONS DEPARTMENT Unit Shutdowns and Power Reductions Report Month Docket Number Unit Date Completed by Telephone october 1986 50-155 Big Rock Point November 3,1986 MJBielinski (616)547 6537 X228 Method of Shuttins Duration Down Ucensee Event System Component Number Date Type (Hours)
Reason p,,,,,,3 Report Number Code l
2 4
Code
- Cause and Cor octive Action To Prevent Recurrence 4
NONE i
i I
2 3
4 F = Forced Reason:
Method:
Exhibit G = Instructions for S = S&eduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manuel Scram for Licensee Event Report (LER)
C = Refueling 3 = Automatic Scram File (NUREG-0161)
D = Regulatory Restriction 4 = Other (Explain)
E = Operator Training and License Examination 5Exhibit 1 = Some Source F = Administrative G = Operational Error (Explain) 8701290308 861031 H = Other (Explain)
PDR ADOCK 05000155 7EM R
' j, Form 3158 1-82
r----
G;2Vr004 QPE20 TING 0470 RETO4T DOCKET NO. 50-15' OATF1 3/ 11 / #6
=
avt Jk JOHN 57uN 9PFRATING STATUS
- NONFI 616-547-6517,EVT 1*G
- l. UNTT NAME:
PIG ROC 4 POINT NUCLEAR PLANT N0'ES 2 4FPqRTING PFRIO92 10/96
- 3. Lle.FNSED THERMAL PPwEe (Mdfit 740 4
NA'CPLATF RATING (GROSS "wEli 75 9 035tGN ELEC Tr tC AL R ATING INET wwEls 72 C. MAFItJw OEP8N189tE CAPACITY (GR355 MwFit T3.3 T. MANIMJ1 DEPCNOASLF CAPACITV (NET MwFit 69.0 4
fF CHANG 85 9CC94 IN C AP ACITY RATING 5tITSMS 3 THRU 71 SINCC LAST REPORT, GIVF REASONS:
- 7. POWER L8WEL 79 WHICH 885TRICTF0,IF ANY INET MwEli 0.0 IS. *EA53NS egg sESTRICTIONS, I" ANY THIS MONTH VFAR-TO-CATS COMULAT!WF
- 11. H008% IN AFPORTING PE4fnO 745 0 7296.0 206J27.0 12 4J"RF8 38 H90R$ RFACTOP WAS CRITICAL 745.0 49?3.3 14R195.1
- 13. GEACTOR RESEave SwisTD3WN H00's 0.0 00 00 14 w0045 GE*tFRAT7R ON-LINr 745.0 6897.7 199537.7 1%. UNTT RE584VE SHUTDodN HOU9.5 00 00 0.0
- 14. G4055 T4F4*AL ENERGY GENERATF3 (MWHI 140'40 0 143059T.0 77475866.0
- 17. C495% ELECTRICAL !NERGY GENERATED (MwHl 46093.0 459512.0 4700Tl9.u
- 14. *t? ELECTRICat ENFeGY CEksRATrG (MwHl 43588.4 439o48.0 8?27870 2 la. 01tf 5FRVICE FACTO 9 100.02 04 52 70.4'
?1. ItNIT AVAILABILITV EACTOR 100 0%
94 5%
70.4T
- 21. U 4 t f C A p A CI TY FACTOR (USING MOC NET) 84.9%
M6 52 59 2T
'7. U'4IT CAPACITY F4CTOR l'35ING OER NFil M1.3%
82.9%
9$.3' 2 3. 't 4T T F04Cip C JT AGE RATE 0 3%
5 5%
14.4%
- 74. %HJTDOWN5 SCH600Let OVER 74 EXT 6 MONTH 5tTYPE,04TE, C DUR ATI ON OF EACHis i
ON IFpirMPEG 24. 1996 - COMMENCEO C045TDOWN WITH "ALL 4005-ALL OUT".
PLANNCO NFFUELING OtaTAGE
$f 48 7 t*4% J AN'J AR Y 2, 19463 FOR Ab0UT 50 70 60 DAYS.
'5.
IF %HJT 00wN AT EN6 35 rep 0RT pep 100. E5itMATFD DATE OF ST AR TtJP t
i
>AY AVERA",E 7tILf 7 3 *c E R i v 47 )
( 't W E N )
(10/06) 1 201 21 61 93 2
203 42 61.65 3
203 33 61.44 4
173 42 61 24 5
197.71 61 03 6
197 04 60 74 7
196 54 60.53 3
195.62 60.36 0
193.25 60.07 10 194 04 59.75 11 l'2.71 50.64 12 191.62 57.48 I?
192 12 51 10 14 191.06 54.89 15 139.71 58.72 16 139 29 53 44 17 137.62 59.28 19 196.46 58.03 19 164.74 57.87 20 184.75 57.59 21 183 5" 57.55 22 182 67 57.31 23 1A2 21 57 10 24 181 67 56.76 25 163.46 56.51 26 190.08 56 34 27 178.79 55.95 28 170.*3 5*.77 29 17R.12 55.49 30 177.37 55 20 31 176 21 55 07 6
f
~
=
Refueling Information Request 1.
Facility name: Big Rock Point Plant 2.
Scheduled date for next refueling shutdown: January 2, 1987 3.
Scheduled date for restart following shutdown: February 20, 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No If yes, explain:
If no, has the reload fuel design and core configuration been reviewed by I
Plant Safety Review Committee to determine whether any unreviewed safety i
questions as associated with the core reload (Reference 10 CFR, Section 50.59)? No 1
I l
If no review has taken place, when is it scheduled?
I 5.
Scheduled date(s) for submittal of proposed licensing action and supporting information:
I 6.
Important licensing considerations associated with refueling, eg, new or j
different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:
t 7.
Number of fuel assemblies in; core 84; spent fuel storage pool 192.
8.
Present licensed spent fuel storage capacity: 441 Size of any increase in licensed storage capacity that has been requested i
or is planned (in number of fuel assemblies):
\\
t 9.
Projected date of last refueling that can be discharged to spent fuel pool assuming the present license capacity:
1995 I,
MIO886-0993-BT01
- 4ll
7*
3 r
i CORSum8m POW 8r o,-
~" -
l Company Big Rock Point Nuclear Plant, Son 591, Route 3, Charlevoin. MI 40720 NOVEMBER 3, 1986 l
Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 i
Dear Sir:
Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period October 1,1986 through October 31, 1986.
Sincerely, W
gt@kYb'/
D P Hoffman 0g Plant Superintendent j ifl0 Enclosures cc: DEVanFarowe, Department of Public Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 WBuckman, P24-117B KWBerry, P24-614B File Q