a 6.8.2 Each procedure and administrative policy of 6.8.1 above, and changes thereto, shall be reviewed in accordance with Specification 6.5.1.6 and shall be approved by the Manager - Nuclear Plant or'his designated altsrnate per specification 6.1.1, prior to implementation, and reyteed ~
periodically a's set forth..in ' administrative procedures.'
6.8.3 Temporary changes to procedures of 6.8.1 above may be made, provided:
a.
The intent of the original procedure is not altered.
b.
The change is approved by two members of the plant i
management, staf f, at least one of whom holds a Senior Reactor Operator's License on the ~ unit af fected.
The change is documented, reviewed by the PORC and,
c.
approved by the Manager - Nuclear Plant within 14 days of implementa. tion.'
y 6.8.4 Written procedures shall be established, implemented ~ and' maintained covering the activities of the radiological
~
ef fluent technical specificatiens as referenced below:
a.
Offsite Dose Calculation Manual b.
Quality Assurance Program for the environmental monitoring using the guidance in Regulatory Guide 4.1, Revision 1, April 1975.
j l
6.9 Reporting Requirements s
In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be submitted to the Administrator of the appropriate Regional Office unless i
otherwise noted.
-254-Amendment No. 77,37,47,7p2,118
$$eagg g e6081303ooggp P
.w
PBAPS l
6.8.2 Each procedure and administrative policy of 6.8.1 above, i
and changes thereto, shall be reviewed in accordance with Specification 6.5.1.6 and shall be approved by the Manager - Nuclear Plant or'his designated alt 9rnate per Specification 6.1.1, prior to implementation, and reyteMed ~
periodically as set forth.in ' administrative procedures.'
i 6.8.3 Temporary changes to procedures of 6.8.1 above may be made, provided:
a.
The intent of the original procedure is not altered.
b.
The change is approved by two members of the plant management, staff, at least one of whom holds a Senior Reactor Operator's License on the unit af fected.
The change is documented, reviewed by the PORC and,
c.
approved by the. Manager - Nuclear Plant within 14 days of implementation.
e 6.8.4 Written procedures shall be established, implemented and maintained covering the activities of the radiological effluent technical specifications as referenced below:
a.
Offsite Dose Calculation Manual b.
Quality Assurance Program for the environmental monitoring using the guidance in Regulatory Guide 4.1, Revision 1, April 1975.
6.9 Reporting Requirements In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be cubmitted to the Administrator of the appropriate Regional Office unless otherwise noted.
254-Amendment No. 79,37,47.794.122 j