ML20212K599
| ML20212K599 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/23/1986 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Asselstine, Bernthal, Palladino, Roberts, Zech NRC COMMISSION (OCM) |
| Shared Package | |
| ML20210A945 | List: |
| References | |
| FOIA-86-53, FOIA-86-54, FOIA-86-55 NUDOCS 8608220192 | |
| Download: ML20212K599 (1) | |
Text
.
/
UNITED STATES I
NUCLEAR REGULATORY COMMISSION j
WASeefN070N. D. C. 20See
( cW JAN33 m i Docket No.: 50-423 MEMORANDUM FOR:
Chairman Palladino i Commissioner Roberts-Cosaissioner Asselstine Connissioner Bernthal 4
Commissioner Zech:
FROM:
Victori Ste110..Jr.
Acting Executive Diriector for Operatfons
SUBJECT:
CONSIDERATION OF FULL POWER LICENSING OF MILLSTONE 3 Consideration of full power licensing:of Millstone 3 is presently; scheduled for January 29, 1986. Thelunit completed fuel load: on December 2,1985, and initfated plant heatup on January 13,:1986.1 The' licensee expects to reach initial criticality on January 22,'1986 and be prepared to exceed 55 power on January 28, 1986.. Provided for your use. is a copy of th'e Millstone 3 briefing package which includes:.
1.
Briefing is11 des for the fu11 power briefing 2.
Thelproposed fell: power license-3.
Draft of Supplement 5 to the: Safety Evaluation Report (to be issued i
in suppor,t of the: full powerificense 4.
The' low power license i i
5.
Millstone 3 Operating Experience Also enclosed for your information is a copy of the; Millstone 3 S&fety Evaluation Report,i its supplements and the Millstone 3 Risk Evaluation Report.
QKSello,iJr.
ac -
l Vc r
ting Executive Director for Operations c
Enclosures:
1.
Millstone 3 Briefing Package 2.
Millstone 3 SER and Supplements 1-4 3.
Millstone 3 Risk Evaluation Report cc: SECY l
OPE OGC
Contact:
Elizabeth L. Doolittle'. NRR. x24911 pggeagg;agcog37 GARDEH6-S3 PDR
_.