ML20212K549

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Requests for Documents Generated or Prepared by V Stello Since Appointment as Acting Edo. Forwards Documents Listed on Apps J-L.Portions of App L Documents Withheld (Ref FOIA Exemption 5)
ML20212K549
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/12/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20210A945 List:
References
CON-BOO, FOIA-86-53, FOIA-86-54, FOIA-86-55, REF-GTECI-A-44, REF-GTECI-EL, RTR-NUREG-0430, RTR-NUREG-430 SECY-86-009, SECY-86-011, SECY-86-015, SECY-86-020, SECY-86-022, SECY-86-028, SECY-86-11, SECY-86-15, SECY-86-19, SECY-86-20, SECY-86-22, SECY-86-28, SECY-86-9, NUDOCS 8608220164
Download: ML20212K549 (6)


Text

'

\\

~~Y 4., s

((

k UNITED STATES y'

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D. C. 20555

%.....+'

AUG 121986 Ms. Billie Pirner Garde Government Accountability Project IN RESPONSE REFER 1555 Connecticut Avenue, NW, Suite 202 TO F01A-86-53, F01A-86-54, Washington, DC 20036 AND F01A-86-55

Dear Ms. Garde:

This is in further response to your letters dated January 13, 20, and 27, 1986, which were received in this office on January 28, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA),

documents generated or prepared by Victor Stello since his appointment as Acting Executive Director for Operations.

In a telephone conversation with Carol Ann Reed of my staff on January 28, 1986, you nar rowed the scope of your requests to 1) handwritten and typed notes of V. Stello;

2) notes and correspondence dictated by V. Stello; 3) records reflecting V. Stello's decisions and comments, and the records upon which the decisions and comments were based; 4) correspondence and other records prepared by V. Stello's staff which carry out a V. Stello directive; and
5) SECY papers signed by V. Stello.

The documents listed on the enclosed Appendix J are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC. You may obtain access by presenting a copy of this letter to the PDR staff r by requesting PD8 folder F01A-86-53 in your name.

The documents listed on o,he enclosed Appendix K are already available in the PDR.

t Portions of the documents listed on the enclosed Appendix L are being withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations.

These are drafts of documents or documents which contain advice, opinions, and recommendations.

Release of this type of information would tend to inhibit the frank and candid exchange of information in future deliberations and thus would not be in the public interest. The nonexempt portions of the Appendix L documents are being placed in the PDR in folder F01A-86-53.

860G220164 860812 PDR FOIA CARDE86-S3 PDR

,)

dC.,,

Ms. Garde Pursuant to 10 CFR 9.15 of the Commission's~ regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Mr. John C.

Hoyle, Assistant Secretary of the Commission.

This denial may be appealed to the Secretary of the Commission within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Secretary of the Commission, U. S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

The review of additional documents subject to your requests is continuing.

As soon as our review is completed, we will notify you.

Sincerely, Or&

4 Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 9

m wm

+

r f

v_uq

w F01As-86-53, 86-54, 8C-55 APPENDIX J 1.

01/22/86 Memo for V. Stello from J. Davis re: Technical Integration (2 pages) 2.

1/15/86 Memorandum for Comissioner Asselstine from Victor Stello, Jr.

Subject:

Stone and Webster Engineering Assurance Program (2 pages).

a.

Design Review Status (2 pages).

3.

1/15/86 Memorandum for Chairman Palladino from Victor Stello, Jr.

Subject:

Contract for Lease / Purchase of the Black Fox Simulator From the General Electric Company (2 pages).

4.

1/21/86 Memorandum for Commissioner Zech from Victor Stello, Jr.

Subject:

Background Report on Fusion (1 page),

a.

International Programs Overview of Nuclear Fusion (2 pages).

b.

Summary Report on U.S. Activities (1 page).

5.

1/23/86 Memorandum for Chairman Palladino, Comissioner Roberts, Comissioner Asselstine, Comissioner Bernthal, Comissioner Zech, from Victor Stello, Jr.,

Subject:

Consideration of Full Power Licensing of Millstone 3 (1 page).

6.

1/23/86 Memorandum for Chairman Palladino, Comissioner Roberts, Commissioner Asselstine, Commissioner Bernthal, Commissioner Zech from Victor Stello, Jr.,

Subject:

Meeting of the Subgroup on Nuclear Export Coordination without enclosure (1 page).

7.

1/23/86 Memorandum for Chairman Palladino, Comissioner Roberts, Comissioner Asselstine, Comissioner Bernthal, Comissioner Zech, from Victor J. Stello, Jr.,

Subject:

Swedish Visit Request (February 12,1986)(1page).

a.

New Swedish Requirements to Improve Protection Against Releases from Severe Reactor Accidents (1 page).

8.

1/24/86 Memorandum for Chairman Palladino from Victor Stello, Jr.,

Subject:

FY 1986 Budget Reduction (2 pages).

a.

1/16/86, Bulletin No. 86-7, RE: Implementing the President's Order under the Balanced Budget and Emergency Deficit Control Act, signed by James C. Miller, III (This document has been referred to OMB) (11 pages).

~v-r e,,-


.,---,g w -----

-e

,-,---------r- -,, - -

, - -., =

b.

1/24/86 Letter to M. Kerrigan from R. Scroggins (2pages).

9.

1/27/86 Memorandum for Chairman Palladino, Commissioner Roberts, Commissioner Asselstine, Commissioner Bernthal, Commissioner Zech, from Victor Stello, Jr.,

Subject:

. Visit Request from International Organization Officials (February 5,1986)

(1 page).

10.

SECY-86 Information on Operator Licensing Activities (2 pages) 11.

SECY-86 Tenth Status Report on Implementation of the Quality Assurance Initiatives (6 pages) i I

w,.

.,.w.

-,.e--

,,r

,.,w n,,

-+ -,,,,,,

,,,---wm.,~ - - -

r.-

- -. --.~,-- -- -

FOIAs-86-53, 86-54, & 86-55 APPENDIX K 1.

SECY-86 International Efforts to Harmonize Health Effects Models and Risk Coefficients 2.

SECY-86 Recommendations for Improving Technical Specifications 3.

SECY-86 Results of Operator Licensing Examinations and Requalifications Program Evaluations for FY 1985 and Operator Licensing Examinations Results for FY 1984 & 1985 4.

SECY-86 Emergency Preparedness Exercise for Shoreham I

I F

s h

I.

4

F01As-86-53, 86-54, & 86-55 APPENDIX L 1.

SECY-86 U.S. NRC Comments on DOE Proposal to the Congress for the Construction of a Monitored Retrievable Storage Facility (MRS) for High-Leval Radioactive Waste and Spent Nuclear Fuel (Nuclear Waste Policy Act (NWPA) Section 141)

(158 pages) 2.

SECY-86 Comments on D0E's Proposed Rulemaking Interpreting the Definition of Byproduct Material (Enclosure 3, Exhibit I has been referred to EPA) (18 pages) 4.

SECY-86 Declassification of Inventory Difference Data and Issuance of Vol. 6 No. I of the Licensed Fuel Facility Status Report:

January 1,1985 - June 30,1985 (16 pages) 6.

SECY-86 SECY 85-163/163A - Station Blackout, Unresolved Safety Issue (USI) A-44 (26 pages) d h

.z

-