ML20212K279
| ML20212K279 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/06/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20212K283 | List: |
| References | |
| NUDOCS 8608190361 | |
| Download: ML20212K279 (2) | |
See also: IR 05000321/1986021
Text
,
h
i-
.4
AUG 0 61986
Docket Nos. 50-321, 50-366
-
eorgia Power Company
-
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/86-21 AND 50-366-86-21)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
/
J. D. Harris on July 14-18, 1986. The inspection included a review of activities
/
authorized for your Hatch facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations of activities
in progress.
The inspector also conducted independent measurements, in the
Region II Mobile Laboratory at your site, to verify your capability for analyzing
radioactive effluents and to establish and maintain standardized methodology
among regulated facilities and the NRC.
The inspection findings indicate'that certain activities appeared to violate NRC
requirements. The violations, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
The enclosed Inspection Report documents an oral commitment (see Paragraph 3)
made by a licensee representative and discussed in the exit interview.
If your
understanding of this commitment differs from the report statements, please
inform this office promptly.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in :he NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
86081903ol 860806
<
DR
ADOCK 05000321
1
-
TPcol
m
, __
,
. _ .
_
_ _ . _
_ _ _ _ _ _ _ _ _ _ _ _ - _ - _ .
.
Georgia Power Company
2
Atlanta, GA
Should you have any questions concerning this letter, please contact us.
1
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report
jcc w/encls:
V J.,P. O'Reilly, Senior Vice President
/ Nuclear Operations
VJ. T. Beckham, Vice President and
General Manager-Nuclear Operation
C. Nix, Site General Manager
. Fraser, Acting Site QA Supervisor
L. Gucwa, Manager, Nuclear Safety
and Licensing
Accw/encls:
FRC Resident Inspector
/Hugh S. Jordan, Executive Secretary
Document Control Desk
,/ State of Georgia
b
LSr
JHarris
PStoddart
DCollins
RCroteau
Alg(natonis
j/31/86
h /86
8/ / /86
8/f/86
8/ /86
- -
.
.--
-- -