Proposed Tech Specs Revising Figures 6.2-1, Corporate Organization & 6.2-2, Facility Organization & Administrative Control Sections to Reflect Nuclear Group Organization Changes
ML20212K275
Person / Time
Site: Beaver Valley
Issue date: 01/15/1987
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20212K258 List:
References
NUDOCS 8701290036
Download: ML20212K275 (4)


Text

. . . _.

DUQb2SNE LIGNr COMPANY Nuclear Group

' SENIOR -

VICE PRESIDENT - ISEG NUCLEAR GROUP MANAGER BUDGET AND FUEL CONTRACTS VICE PRESIDENr ORC - NUCLEAR BV-2 PROJECTI 1 . Until Unit 2 MANAGER SR. MANAGER - - ------------- comunercial QUALITY NUCLEAR operation ASSURANCE OPERATIONS GENERAL MANAGER NUCLEAR ENGR.

& RECrMtDS MANAGER PLANT MANAGER MANAGER- SAPS pahlacWW MANAGER MANAGER MANAGER PIANNING AND MANAGER TECl#11 CAL RADIOIAGICAL DECOWt. NtrlWAR NUrtBAR ADMIN. NUCLEAR-OUTAGE MGMT. SERVICES Coerrit0L# PR(UECT CONSTRUCTION TRAINING SERVICES + SAFETY

  • f-Industrial +-Security *-Fire Safety Responsibility Protection OSC Responsibility Responsibility FIGURE 6.2-1 CORPORATE ORGANIZATION (PARTIAL)

BEAVER VALLEY - UNIT 1 6-2 PROPOSED WORDING DO 50 4 P

O 4

e

$me $h $8E!

ssy, :s e1 -

s- llg!

Es -aga is - lg aulg G

,s um g . g ,.

e = ,e I !a~

i l

l H!l E *, s

_  !$5 Es "

E!

e I

! I i i i 1 - , , e I

sl l -

!lgE - - E  !!,E - -

0 s gl l8l ga a  ! ga 3 s

l l.l i . .

g i

e

ls l l! g a d! l.W .

W g  ! E

!l- ll .-l l

l ll .l.E n - -

!e E

!,g n H i , ..- . .a i

l I

l 1 l m !an~ e ag el an e

a si s l go --e -

e a na n l - - -

- y - -

l ml E lB n s a s~ lg l

I j ga  !-

  • 8 sl a 8 o I i g- -

i I

v E!

!ll E ss as -

li -

El i -

0 lg s

lgs l!gii lg e

n l=i l

a sin- -

a a 8

8 = 18 s m

8 e g

i l

i l

ADMINISTRATIVE CONTROLS ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the OSC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in OSC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The OSC shall meet at least once per calendar month and as convened by the OSC Chairman or his designated alternate.

QUORUM 6.5.1.5 A quorum of the OSC shall consist of t$e Chairman or his designated alternate and at least one half of the members including alternates.

RESPONSIBILITIES 6.5.1.6 The OSC shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and changes of intent thereto, 2) any other proposed procedures or changes thereto as determined by the Plant Manager to affect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to the Technical Specifications. l
d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.
e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Senior Manager, Nuclear Operations and to the Chairman of the Offsite Review Committee.
f. Review of all REPORTABLE EVENTS.
g. Review of facility operations to detect potential safety hazards.
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Offsite Review Committee.

BEAVER VALLEY - UNIT 1 6-6 PROPOSED WORDING

ADMINISTRATIVE CONTROLS AUTHORITY 6.5.1.7 The OSC shall:

a. Recommend to the Plant Manager written approval or disapproval of items considered under 6.5.1.6(a) through (d) above.
b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Senior Manager Nuclear Operations and the Offsite Review Committee of disagreement between the OSC and the Plant Manager; however, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The OSC shall maintain written minutes of each meeting and copies shall be provided to the Senior Manager Nuclear Operations and l Chairman of the Offsite Review Committee.

6.5.2 OFFSITE REVIEW COMMITTEE (ORC)

FUNCTION 6.5.2.1 The ORC shall function to provide independent review and audit of designated activities in the areas of:

a. nuclear power plant operations
b. nuclear engineering
c. chemistry and radiochemistry
d. metallurgy
e. instrumentation and control I
f. radiological safety 4 g. mechanical and electrical engineering
h. quality assurance practices BEAVER VALLEY - UNIT 1 6-7 PROPOSED WORDING i

ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a safety Limit is violated:

a. The facility shall be placed in at least HOT STANDBY within one (1) hour.
b. The Safety Limit violation shall be reported to the Commission, the Senior Manager Nuclear Operations and to the ORC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l
c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the on-Site Safety Committee (OSC). This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
d. The Safety Limit Violation Report shall be submitted to the Commission, the ORC and the Senior Manager Nuclear j Operations within 14 days of the Violation.

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented, and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November 1972.
b. Refueling operations.
c. Surveillance and test activities of safety related equip-ment.
d. Security Plan implementation.
e. Emergency Plan implementation.
f. Fire Protection Program implementation.
g. PROCESS CONTROL PROGRAM implementation.
h. OFFSITE DOSE CALCULATION MANUAL implementation.

6.8.2 Each procedure and administrative policy of 6.8.1 above and changes of intent thereto, shall be reviewed by the OSC and all procedure changes approved by the Plant Manager, predesignated alternate or a predesignated Manager to whom the Plant Manager has assigned in writing the responsibility for review and approval of specific subjects considered by the committee, as applicable.

BEAVER VALLEY - UNIT 1 6-12 PROPOSED WORDING

ADMINISTRATIVE CONTROLS 6.17 RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM The Senior Manager Nuclear Operations delegates the responsibility l for the Radiological Environmental Monitoring Program to the Radiological Control Manager (Figure 6.2-1) or his designated alternate.

The Radiological Control Manager is responsible for administering the offsite Radiological Environmental Monitoring Program. He shall determine that the sampling program is being implemented as described to verify that the environment is adequately protected under existing procedures. He shall also have the responsibility for establishing, implementing, maintaining and approving offsite environmental program sampling, analyses and calibration procedures.

BEAVER VALLEY - UNIT 1 6-31 PROPOSED WORDING i