M G cc t M \\c, AUG 121986 peorgia Power Company
/ ATTN: Mr. J. H. Miller, Jr.
President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- V0GTLE FACILITY - DOCKET NO. 50-424 This refers to the management meeting conducted at your request in the NRC Bethesda Office on July 22, 1986.
This meeting was held to brief the NRC on the Vogtle Readiness Review Module entitled, " Independent Design Review".
It is our opinion that this meeting was beneficial and has provided a compre-hensive overview of the Vogtle Readiness Review Program and, specifically, the module presented.
These in-depth presentations will better enable the NRC to conduct its evaluations of this module.
In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC public Document Room.
Should you have any questions concerning these matters, we will be pleased to discuss them.
Sincerely, Original signed by J. Nelson Grace J. Nelson Grace Regional Administrator
Enclosures:
1.
List of Attendees 2.
Sumary of Issues Discussed cc w/encls:
pF. P. O'Reilly, Senior Vice President Nuclear Operations J. E. Conway, Senior Vice President &
Project Director D. O. Foster, Vice President, Project Support
- k. D. Rice, Vice President, Project P
Engineering (ccw/enclscont'd-seepage 2)
$0 4
D L' nas i
AUG 12 W Georgia Power Company 2
4(cc w/encls cont'd)
. H. Pinson, Vice President, Project Construction i T. Beckham, Vice President &
General Manager - Operations A A. Thomas, Vice President, Licensing
- . S. Read, General Manager.
Quality Assurance SC. W. Hayes, Vogtle Qualit'y Assurance Manager
- 54. C. Ramsey, Manager -
Readiness Review A B. Bockhold, General Manager, Nuclear Operations X. Gucwa, Manager, Nuclear Safety and Licensing J.H.Googe, Project Construction Manager JW D. Groover, Quality Assurance Site Manager -
Construction pr. A. Bailey, Project Licensing Manager G. F. Trowbridge, Esq., Shaw,
" Pittman, Potts and Trowbridge S. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge E(L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge f.K E. Joiner, Troutman, Sanders, Lockerman and Ashmore W. G. Ledbetter, Commissioner, Department of Human Resources C H. Badger, Office of Planning and Budget A.' Kirkland, III, Counsel, Office of the Consumer's Utility Council J. C. Teper, Georgians Against Nuclear Energy g.B.Margulies,Esq., Chairman, Atomic Safety and Licensing Board Panel iM.O.H. Paris,AdministrativeJudge Atomic Safety and Licensing Board Panel
- 4. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel
[GovernmentAccountabilityProject P. Garde, Citizens Clinic, Director (bec w/encls - see page 3)
AUG la agg Georgia Power Company 3
b c w/encis:
S
- 4. Reis ELD F. M. Hill, IE
- . Miller, NRR W. Brach, ED0 M. Sinkule, RII E. Christnot, RII
- C Resident Inspector Document Control Desk State of Georgia t
l t
i I
l i
i l
RII 9/
RII RI RII
/
e alk MSinkule:sr VL)ownlee 8//yes
/86 8/7/86 8/ / /86 8/
,/86 l
(
ENCLOSURE 1 LIST OF ATTENDEES Vogtle Readiness Review Meeting July 22, 1986, at 12:30 p.m.
U. S. Nuclear Regulatory Commission Representatives B. K. Grimes, Director, Division of Quality Assurance, Vendor and Technical TrainingCenterPrograms,(DQA),IE V. Panciera, Deputy Director, Division of Reactor Safety RII H. J. Miller, Deputy Director, DQA, IE E. V. Imbro, Chief, Licensing Section, DQA, IE M. V. Sinkule, Chief, Projects Section 3C, RII E. W. Brach, Executive Coordinator for Regional Opertions, ED0 G. S. Lewis, Policy and Program Development Section, DQA, IE M. A. Miller, Licensing Project Manager, NRR J. W. Thompson, Vogtle Readiness Review Project Manager, NRR J. Blackman, Westec Services C. K. Chen, DQA, IE R. K. Mattu SAIC Georgia Power Company Representatives D. O. Foster, Vice President-Project Support, Georgia Power Company (GPC)
R. A. Thomas, Vice President-Licensing, Southern Company Services (SCS)
D. E. Dutton, Vice President-Projects, SCS W. C. Ramsey, Manager, Readiness Review, SCS D. S. Read, General Manager Quality Assurance, GPC D. T. King, Vice President and Deputy Director Engineering, S&WEC W. E. Burns, Nuclear Safety and Licensing, GPC S. L. Stamm, Project Engineer, S&W S. Stoker, Vice President, Domestic Operations, BWPC 3
i l
i l
ENCLOSURE 2
SUMMARY
OF ISSUES DISCUSSED In the meeting Georgia Power Company representatives presented the results of the Readiness Review Module No. 22, " Independent Design Review." Following is a list of subjects discussed.
1.
Independent Design Review (IDR) to include:
' Program Definition
- Results Summary
" Background Purpose and Scope
- Conduct of Review Report Organization 2.
Readiness Review Program Review Types to include:
- IDR(Design-Technicil) t
- Design (Programmatic)
Construction
' Operational 3.
Civil / Structural Reviews Performed:
4.
System Based Technical Assessment of the Auxiliary Feedwater System, selected program reviews to include:
- Assessment Philosophy
- Results Summary
- Conclusions
- Scope of Review
- Basis for System Selection
- 0rganization
- Review Plan Checklists 5.
Level 1 findings, the corrective action taken, and the generic applica-bility.
6.
The Licensing status of the plant.
GPC representatives were responsive to questions to clarification submitted verbally by the NRC attendees. They also indicated that additional documentation as to sample sizes, the number of attributes involved and methodology used to make module assessments is available at the Vogtle site.