Text
. _ _ __- _ _ - _ _ _ _ _
g-8 j
UNITED STATES g
NUCLEAR REGULATORY COMMISSION g
}
WASHINGTON, D. C. 20555 e
August 6, 1986 Docket No.:
50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE Re:
Haddam Neck Plant By letter dated June 13, 1986, Connecticut Yankee Atomic Power Company (CYAPC0) submitted 40 copies of a report entitled:
"Haddam Neck Plant, Integrated Safety Assessment Program, Summaries of Public Safety Impact Model Project Analyses" This report provided the summaries of Integrated Safety Assessment Program (ISAP) topics 1.27 and 2.06, which included draft documentation of your Public Safety Impact Model (PSIM).
You have requested that the PSIM material be withheld from public disclosure pursuant to 10 CFR 2.790.
The PSIM represents a portion of Northeast Utilities Service Company's (NUSCO) extensive development effort regarding a process by which NUSCO plans to evaluate proposed plant improvement projects. This information is customarily held in confidence and to the best of NUSCO's knowledge and belief, is not available in public sources. NUSCO contends that release of this information would allow a competitor to avoid the expense of development and approval for a similar process.
We have reviewed the submittal and supporting affidayit based on the requirements and criteria of 10 CFR 2.790, and on the basis of NUSCO's statements have detennined that the submitted information sought to be withheld contains proprietary commercial information.
It is our belief, pursuant to 10 CFR 2.790(b)(4) and Section 103(b) of the
[
l Atomic Energy Act of 1954, as amended, that, at this time, the right of the l
public to be fully apprised of the subject information does not outweigh the need to protect NUSCO's competitive position.
Accordingly, we have detennined that the information should be withheld from public disclosure. We, therefore, approve your request for withholding pursuant to 10 CFR 2.790 and are withholding the reports described above as proprietary.
8608140370 860806 PDR ADOCK 05000213 P
August 6, 1986 John F. Opeka Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
If the need arises, we may send copies of this infonnation to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the future should the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Original signed by Francis M. Akstulewicz Francis M. Akstulewicz, Project Manager Integrated Safety Assessment Project Directorate Division of PWR Licensing - B cc: See next page DISTRIBUTION Docket File JPartlow NRC PDR FAkstulewicz Local POR PAnderson ISAP Reading ACRS (10)
CGrimes FMiraglia 0GC - Bethesda EJordan BGrimes ISAP:DPL-B ISAP:DPL IS
-B ISAP:DPL-B OG i
gaAWang:mn FAkstulewicz P
son CGrimes
/
s 07/7,3/86 07/4f/86 07/tf/86 07/j/f /86 0(/h /86 I
.t 4
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors.at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406