Text
,
ancu p"
4 UNITED STATES g
,j N' W, LEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20555-0001
$9.....,o VERMONT YANKEE NUCLEAR POWER CORPORATION DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.178 License No. DPR 28 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by the Vermont Yankee Nuclear Power Corporation (the licensee) dated June 29,1999, complies with the standards and requirernents of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
Thore is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9910050093 991001 PDR ADOCK 05000271 P
F..
g !.
l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR 28 is hereby amended to read as follows:
1
.(B)
' Technical Soecifications l
The Technical Specifications contained in Appendix A, as revised through Amendment No.178, are hereby inccrporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION t//
cx Ja es W. Clifford, Chief, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications 2
Date of issuance: October 1, 1999
)
h l
I
P..
ATTACHMENT TO LICENSE AMENDMENT NO.178 FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following page of the Appendix A Technical Specifications with the attached
.- revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove insert 147 147 l
(L+
T-l l
l*
vysPS I-3.7 LIMITING CONDITIONS FOR 4.7 SURVEILLANCE REQUIREMENTS OPERATION at normal cooldown rates if the torus water temperature exceeds 120*F.
e.
Minimum' Water Volume
- 68,000. cubic feet f.
Maximum Water Volume
- 70,000 cubic feet 2.
The primary containment integrity shall be integrity shall be maintained at all times demonstrated as required when the reactor is by the Primary critical or when the Containment Leak Rate reactor water temperature Testing Program (PCLRTP),
is above 212*F and fuel is in the reactor vessel except while performing low power physics tests at atmospheric pressure at power levels not to exceed 5 Mw(t).
3.
If a portion of a system-3.
(Blank) that is considered to be an extension of primary containment is to be opened, isolate the affected penetration flow path by use of at least one closed and deactivated automatic valve, closed manual valve or blind flange.
4.
Whenever primary 4.
Verify leakage rate containment integrity is through each main steam required, the leakage line isolation valve is from any one main steam
$23 scf/hr and that the line isolation valve combined maximum pathway shall not exceed leakage rate for all four 31 scf/hr at 44 psig ( P. ),
main steam lines is and the combined leakage
$46 scf/hr when tested at from all four main steam 224 psig (P ).
t lines shall not exceed 62 scf/hr at 44 psig ( P. ).
l m860Z$
yl f_
?
v\\
Amendment No. 60, 46G, 443 178 147
,