ML20212H688

From kanterella
Jump to navigation Jump to search
Forwards Results of Conversation W/Nrc Re Changes to Protected Area Perimeter Due to Expansion of Security Bldg. Encl Withheld (Ref 10CFR73.21)
ML20212H688
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/19/1987
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-86-686, NUDOCS 8701270516
Download: ML20212H688 (1)


Text

b., 5 ftY $00$$E0N Omaha Public Power District 1623 Harney Omaha, Nebraska 66102 2247 402/536-4000 January 19, 1987 ENCLOSURE CCNTAWS LIC-86-686 GAFECU."iOS I?: ROP'.i ATION.

UPON$9/.

TH!S Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

References:

1.

Docket No. 50-285 2.

Letter OPPD (R. L. Andrews) to NRC (J. E. Gagliardo) dated August 13, 1986, (LIC-86-376)

Subject:

Fort Calhoun Station Security Building Gentlemen:

In Reference 2, we discussed our plans to expand the Fort Calhoun Station Security Building.

The purpose of this letter is to provide you with the results of a conversation with members of your staff concerning changes to the protected area perimeter due to this construction.

Sincerely, R. L. Andrews Division Manager Nuclear Production RLA/me cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.

Washington, DC 20036 J. E. Gagliardo,NRC Region IV A. C. Thadani, NRC Project Director W. A. Paulson, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector 00 8701270516 87o11

$;N3f3NJ3 E.NkN gDR ADOCK 05000 85 PDR 1

assia f mHogmen h f.

I opportururg 1

--_