Forwards Insp Rept 50-298/87-05 on 870209-12.Violation Re Training Cited as Unresolved Item Per Commission Policy & Requires No Response
ML20212G436
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/03/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20212G442 List:
References
NUDOCS 8703050348
Download: ML20212G436 (2)


See also: IR 05000298/1987005

Text

+

. ~

.

,

._;.,

e

MAR 3 1987

-In Reply Refer To:

Docket: 50-298/87-05

Nebraska Public Power District

ATTN: George A. Trevors, Division Manager- -s

Nuclear Support

P. O. Box 499 ,

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. P. H. Harrell and

W. B. Jones of this off,1ce during the period February 9-12, 1987, of activities

authorized by NRC Operating License DPR-46 for the Cooper Nuclear Station and

to the discussion of our findings with Mr. G. R. Horn and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included licensed operation training and

requalification program and the nonlicensed staff training program. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were a

potential violation of NRC requirements. However, since this potential

violation is related to training, it is not cited herein as a violation but is

considered to be an unresolved item in accordance with the Commission Policy

Statement on Training and Qualification of Nuclear Power Plant Personnel

(50 FR 11147 dated March 30, 1985). No response is required; however, your

attention is warranted to the unresolved item which has the potential of

becoming a violation in the future.

An unresolved item is identified in paragraph 3 of the enclosed inspection

report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OddnM styed ay

J.E.G.glarb

J. E. Gagliardo, Chief

ReactorProjectsBranch

E ure: (see next pa e)

/ I .RI RIV:R RPB/ RPB

'

,,Q Jones PHH e 1/n DRHun er JP audon JEGaglia

, U Q/87 $./ 87 t/t 87 2/f//87 3./ 2/8J

l

g=gast malho 9

,

- _ ..- .-. ..__ __ - . - _ - _-. - . , .

.- - . - . _ - .

. .

Nebraska Public Power District -2-

Enclosure:

Appendix - NRC Inspection Report

50-298/87-05

cc w/ enclosure:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Crownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec distrib. by RIV:

  • RPB DRSP
  • Resident ~ Inspector R. D. Martin, RA
  • SectionChief(RPB/A) *D. Weiss,LFMB(AR-2015)
  • R&SPB *RSB
  • MIS System *RIV File
  • RSTS Operator * Project Inspector
  • P. Harrell, Ft. Calhoun *W. Jones, River Bend
  • R. Hall
  • w/766

.