ML20212G084

From kanterella
Jump to navigation Jump to search
Documents 971001 Public Meeting Between Abb Ceno Hematite Fuel Operations & NRC at Hematite Plant to Discuss Plant'S Performance Over Past 6 Months.List of Attendees & Meeting Handouts Encl
ML20212G084
Person / Time
Site: 07000036
Issue date: 11/03/1997
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 9711050243
Download: ML20212G084 (4)


Text

~ ~

V { py A F ,

m

'.4e

4
; ll

_ i

/ November 3. 1997-f Vice President, Fuel Operations; . -

fABB CENO Hometite Fuel Operations -

-3300 State Road P -

Hematite, MO : 63047 i

SUBJECT:

' OCTOBER 1,1997; MEETING WITH ABB CENO FUEL OPERATIONS -

. PERSONNEL TO DISCUSS FACILITY PERFORMANCE OVER THE PASTE SIX MONTHS'--

~ -

- Dear Dr ' Kaiser -

This letter ducuments the public meeting held between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission (NRC) at the Hematite Plant on

{ October 1,1997.

c The purpose'of 'the meeting was to discuss the plant's performance over the past six

' months.: Topical areas covered during the meeting by your staff included the following:

Facility / Process Modifications: Hydrofluoric' Acid Scrubbers: Updates regarding the Criticality Safetyi. Integrated Safety Analysis, and Fire Safety Programs; and, the 10 CFR 20.304 Burial' Area Plan.

EAttached are the list of' meeting attendees and the meeting handout presented by your -  !

staff, enti led. ." Periodic Management meeting between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission," dated October 1,1997.

Sincerely, Original Signed by-Patrick L. Hiland, Chief -

' Fuel Cycle Branch

- License No. SNM-33 Docket No. 070 00036

- Attachments: 1. Attendee List- h

2. . Handout dated October 1,1997, entitled, ." Periodic Management meeting between ABB CENO Hematite Fuel

. Operations and the Nuclear Regulatory Commission."' k bec w/atts! PUBLIC (Idh7) y .h(,

L DOCUMENT NAME:nG:\SEC\97COM.LO3

~ To ,eceh,e e copy of tNe document. Indicate in the hos *C* = Copy without ettech/enci *[* a Copy w6th attacNonct *N' = No copy Of?lCEi Rlil: [ Rlli NAME Krsek:Id Hiland M@

DATE' -111/q397 :11/3/97 m

F aW E lh* ippppppim

~ _ a

/

List of ' Attendees--

$ Cctober 1',1997

- ABB CENO Hematite Fuel Operations 'and U_.S. NRC Management _ Meeting =

'U.S.NRC Roy Conlane - - Acting Director, Division of Nuclear Material Safety, Rill-Patrick Hilandf Chief, Fuel Cycle Branch, Rlli-Steven Bag 9ett . Acting Chief, Materials inspection 2 Branch, Rlli .

' Melanie Galloway . _

Section Chief, Fuel Cycle Licensing Branch, NMSS Sean Soong - _

. Program Manager, Fuel Cycle Licensing Branch, NMSS Courtney Blanchard - Fuel Facilities inspector, Fuel Cycle Branch, Rlli ,

-[ABR CENO Hematite Fuel Ooerations

- Dr. Bruce Kaiser Vice President, Fuel Operations .

Jo'oert Sharkey - Director, Regulatory Affairs

- Gil Page .

' Director, Uranium Operations Don Hayduk Quality _ Manager -

Donald Underwood Engineering Manager

. Arlon Noack Maintenance Manager Hal Eskridge - LSenior Consultant -

Robert Freeman Nuclear Criticality Specialist -

Earl Saito Health Physicist t-a <

i s.

- --a - ~ e- -y a w -'-

Ty.rW--*y'-

c , /.

  • Agenda Periodic Management meeting between AEI) ' organintion. Kaiser CINO IIcenatite Puel Operations and the
  • synopsis of recent / futwo actions . Kaisa Nuclar Regulatory Cosaminsion
  • Facility / Process modiGcations.Pasa .
  • IIF Saubber.Page gg gg
  • Qiticahty Saasty and ISA . Freenan / Sharkey
  • Regulainry Activity.Sharkey
  • Self Assessment.Shwkey
  • Fire Safety Propem .Sharkey
  • 20304 bwial ares plea .Sharkey
  • Ohw topice ofinternet CE/NRC Iwi= h Ass n-t T- ABB M semed 78.= . a.edenery AS.Ars my my

~

I=F-i == l m_.-*

=  :=:

i *= =- I - ll .

.=.

_ ~

.=

l :::::

7

.=.

,=, M

=

I

=

j

.~ ._

l

.=. I =.

1 l

l ~

1 ,

?"- I 3 5.l 2E

'=  ::- +  :-

  • b ABB ABB Ur i-s operess.es j._=_l RECENT / FUTURE ACTIONS p.q , .-

I - . clean up pmjects

  • IIF mbber l M]}- -j iO_ l - 41,000 ciade fe"

- 1.1 neitiian possies

+ bulk chemical storage

, pmder to PAM

.i .1

  • crit Safe 9 Pm8mn . incinerator scrubba

= l +s'-l .___ il

= .m- - . . , _ ,

!= *"8"**'"**"*"'

  • shippingcontainerbid.

- plant

  • retration ponds

+ upgraded data managemast ABB - ARE i

I

1997 Stack Effluent

, ,, 1997 Inspection EfTort

$8 e

+ 97001 One violation-incorporating change rqmts.

+ 97002-Noviolations f

I~_[ _ mearere + 97003 One violation - Lock and tag 8 ,o

- {i + 97201 One violation - not signing procedures e- + 97202 - Reactive , no violations - SSC

" E-8 E

  • 97203 - operations Scheduled for November

, , , , m u c,. , + 97004 RIU / RU ???

+ Many IFIs and past violations closed gg 10 CFR 20,304 burial area

  • 9/16/97 CE letter written 9/12 Update of

+ 9/l3/96 CE notification per IN 96-47 status of proposed burial area actions,

+ 11/25/96 NRC denial based onjustification meeting agenda for NRC/DNR 9/26

+ 1/24/97 CE requests additional time to meeting assess the disposal arei and a meeting 9/25/97 - NRC letter stating the CE has not

  • 4/24/9 s CE meets with NRC HQ to discuss submitted a decommissioning plan or proposed work plan (came to agreement on justification for delay approach due at end ofsummer) + 9/26/97 - CE holds joint meeting with NRC

+ May 97 publish

  • Regional and local Geologic and MoDNR to present"Hydrogeologic Summary at the Canbustion Engineering, investigation and Groundwater Monitoring I

licanatite. Missouri Plant - ABB monitoring plan- ABB l

l l

10 CFR 20. 304 burial area cont. FIRE SAFETY PROGRAM i

i

. ks.imind 6m ia.d. . sprirakr an.a sm wer l + 10/'.9/97 - Teleconfemnce wich Rlli and . rwar.ne w mew *>*a i=Pecnaa sai

{ llQ concerning 9/25 NRC lettei m i . wincer = 4 Prmam ==atenaace safety assenewns include a Hut work permit system

(-

- Difurcated the issue 6m safety rar wel&cs, cuning, mai

  • CE'a runne plaa

. f.censiw 6m dencnan snaare

  • NRC's fdlaw up action systeg idenh6 awe to
  • On<iw sn assistance

-- CE will submitjustiGcatica for dciey and the disas locatiar,s tema; au sigloyees "Hydrogeologic Investigation and Goundwater

  • Fim arus an dr6ned and anned to ime portable 6te Monitoring Monitoring Plan" by October 24th. N "

. % .usi,incss

  • Fxtenswe pataNo sre Sre. rcey extingh esmbu* ion ABB ABB 3