ML20212G084
| ML20212G084 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 11/03/1997 |
| From: | Hiland P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| References | |
| NUDOCS 9711050243 | |
| Download: ML20212G084 (4) | |
Text
V { py A F
~
~
m
'.4e
- 4 ; ll i
/ November 3. 1997-f Vice President, Fuel Operations;.
fABB CENO Hometite Fuel Operations -
-3300 State Road P -
Hematite, MO : 63047 i
SUBJECT:
' OCTOBER 1,1997; MEETING WITH ABB CENO FUEL OPERATIONS -
. PERSONNEL TO DISCUSS FACILITY PERFORMANCE OVER THE PASTE SIX MONTHS'--
- Dear Dr ' Kaiser -
~
This letter ducuments the public meeting held between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission (NRC) at the Hematite Plant on
{ October 1,1997.
c The purpose'of 'the meeting was to discuss the plant's performance over the past six
' months.: Topical areas covered during the meeting by your staff included the following:
Facility / Process Modifications: Hydrofluoric' Acid Scrubbers: Updates regarding the Criticality Safetyi. Integrated Safety Analysis, and Fire Safety Programs; and, the 10 CFR 20.304 Burial' Area Plan.
EAttached are the list of' meeting attendees and the meeting handout presented by your -
staff, enti led.." Periodic Management meeting between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission," dated October 1,1997.
Sincerely, Original Signed by-Patrick L. Hiland, Chief -
' Fuel Cycle Branch
- License No. SNM-33 Docket No. 070 00036 h
- Attachments:
1.
Attendee List-2.
. Handout dated October 1,1997, entitled,." Periodic Management meeting between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission."'
k bec w/atts! PUBLIC (Idh7)y.h(,
L DOCUMENT NAME:nG:\\SEC\\97COM.LO3
~ To,eceh,e e copy of tNe document. Indicate in the hos *C* = Copy without ettech/enci *[* a Copy w6th attacNonct *N' = No copy Of?lCEi Rlil:
[
Rlli Krsek:Id Hiland M@
NAME DATE'
-111/q397
- 11/3/97 m
F aW E lh*
ippppppim
~
a
/
List of ' Attendees--
$ Cctober 1',1997
- ABB CENO Hematite Fuel Operations 'and U_.S. NRC Management _ Meeting =
'U.S.NRC Roy Conlane -
- Acting Director, Division of Nuclear Material Safety, Rill-Patrick Hilandf Chief, Fuel Cycle Branch, Rlli-Steven Bag 9ett
. Acting Chief, Materials inspection 2 Branch, Rlli
' Melanie Galloway.
Section Chief, Fuel Cycle Licensing Branch, NMSS Sean Soong -
. Program Manager, Fuel Cycle Licensing Branch, NMSS Courtney Blanchard -
Fuel Facilities inspector, Fuel Cycle Branch, Rlli
-[ABR CENO Hematite Fuel Ooerations
- Dr. Bruce Kaiser Vice President, Fuel Operations Jo'oert Sharkey -
Director, Regulatory Affairs
- Gil Page
' Director, Uranium Operations Don Hayduk Quality _ Manager -
Donald Underwood Engineering Manager
. Arlon Noack Maintenance Manager Hal Eskridge -
LSenior Consultant -
Robert Freeman Nuclear Criticality Specialist -
Earl Saito Health Physicist t-a i
s.
t-N
--a a
re-3
~
e-war
-y a
w fi Ty.rW--*y'-
c, /.
- Agenda Periodic Management meeting between AEI)
' organintion. Kaiser CINO IIcenatite Puel Operations and the
- synopsis of recent / futwo actions. Kaisa Nuclar Regulatory Cosaminsion
- Facility / Process modiGcations.Pasa.
IIF Saubber.Page Qiticahty Saasty and ISA. Freenan / Sharkey gg gg
- Regulainry Activity.Sharkey Self Assessment.Shwkey Fire Safety Propem.Sharkey
- 20304 bwial ares plea.Sharkey
- Ohw topice ofinternet CE/NRC Iwi= h Ass n-t T-ABB M semed 78.=
a.edenery AS.Ars
.my my
~
I=F-i== l m_.
i *= =- I
- =
- =:ll
.=.
.=
~
.=.
,=,
M
.~
7 l :::::
I j
l l
=
=
.=. I =.
1 l
~
1
?"- I 3 5.l 2E
- '=
+
- b ABB ABB Ur i-s operess.es j._=_l RECENT / FUTURE ACTIONS p.q I -
. clean up pmjects
- IIF mbber l M]}- -j iO_ l
- 41,000 ciade fe"
+ bulk chemical storage
- 1.1 neitiian possies
, pmder to PAM
.i l +s'-l il
.1
- crit Safe 9 Pm8mn
. incinerator scrubba
=
=
.m- -
- "8"**'"**"*"'
!=
- shippingcontainerbid.
plant
- retration ponds
+ upgraded data managemast ABB ARE I
i
1997 Stack Effluent 1997 Inspection EfTort e
8
,o- {iI~_[ _ mearere
$8
+ 97001 One violation-incorporating change rqmts.
+ 97002-Noviolations f
+ 97003 One violation - Lock and tag
+ 97201 One violation - not signing procedures e-E-
+ 97202 - Reactive, no violations - SSC E
- 97203 - operations Scheduled for November 8
+ 97004 RIU / RU ???
,,,, m u c,.
+ Many IFIs and past violations closed gg 10 CFR 20,304 burial area 10 CFR 20.304 burial area cont.
- 9/16/97 CE letter written 9/12 Update of
+ 9/l3/96 CE notification per IN 96-47 status of proposed burial area actions,
+ 11/25/96 NRC denial based onjustification meeting agenda for NRC/DNR 9/26
+ 1/24/97 CE requests additional time to meeting assess the disposal arei and a meeting 9/25/97 - NRC letter stating the CE has not
- 4/24/9 s CE meets with NRC HQ to discuss submitted a decommissioning plan or proposed work plan (came to agreement on justification for delay approach due at end ofsummer)
+ 9/26/97 - CE holds joint meeting with NRC
+ May 97 publish
- Regional and local Geologic and MoDNR to present"Hydrogeologic Summary at the Canbustion Engineering, investigation and Groundwater Monitoring licanatite. Missouri Plant -
ABB monitoring plan-ABB I
l l
l 10 CFR 20. 304 burial area cont.
FIRE SAFETY PROGRAM i
i
. ks.imind 6m ia.d.
sprirakr an.a sm wer l
+ 10/'.9/97 - Teleconfemnce wich Rlli and
. rwar.ne w mew
- >*a i=Pecnaa sai
{
llQ concerning 9/25 NRC lettei m i. wincer = 4 Prmam==atenaace
(-
- Difurcated the issue safety assenewns include Hut work permit system a
6m safety rar wel&cs, cuning, mai
- CE'a runne plaa
. f.censiw 6m dencnan snaare
- NRC's fdlaw up action systeg idenh6 awe to
- On<iw sn assistance
-- CE will submitjustiGcatica for dciey and the disas locatiar,s tema; au sigloyees "Hydrogeologic Investigation and Goundwater
- Fim arus an dr6ned and anned to ime portable 6te Monitoring Monitoring Plan" by October 24th.
N
. %.usi,incss
- Fxtenswe pataNo sre Sre. rcey extingh esmbu* ion ABB ABB 3
-