ML20212G084

From kanterella
Jump to navigation Jump to search
Documents 971001 Public Meeting Between ABB Ceno Hematite Fuel Operations & NRC at Hematite Plant to Discuss Plants Performance Over Past 6 Months.List of Attendees & Meeting Handouts Encl
ML20212G084
Person / Time
Site: 07000036
Issue date: 11/03/1997
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 9711050243
Download: ML20212G084 (4)


Text

V { py A F

~

~

m

'.4e

4 ; ll i

/ November 3. 1997-f Vice President, Fuel Operations;.

fABB CENO Hometite Fuel Operations -

-3300 State Road P -

Hematite, MO : 63047 i

SUBJECT:

' OCTOBER 1,1997; MEETING WITH ABB CENO FUEL OPERATIONS -

. PERSONNEL TO DISCUSS FACILITY PERFORMANCE OVER THE PASTE SIX MONTHS'--

- Dear Dr ' Kaiser -

~

This letter ducuments the public meeting held between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission (NRC) at the Hematite Plant on

{ October 1,1997.

c The purpose'of 'the meeting was to discuss the plant's performance over the past six

' months.: Topical areas covered during the meeting by your staff included the following:

Facility / Process Modifications: Hydrofluoric' Acid Scrubbers: Updates regarding the Criticality Safetyi. Integrated Safety Analysis, and Fire Safety Programs; and, the 10 CFR 20.304 Burial' Area Plan.

EAttached are the list of' meeting attendees and the meeting handout presented by your -

staff, enti led.." Periodic Management meeting between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission," dated October 1,1997.

Sincerely, Original Signed by-Patrick L. Hiland, Chief -

' Fuel Cycle Branch

- License No. SNM-33 Docket No. 070 00036 h

- Attachments:

1.

Attendee List-2.

. Handout dated October 1,1997, entitled,." Periodic Management meeting between ABB CENO Hematite Fuel Operations and the Nuclear Regulatory Commission."'

k bec w/atts! PUBLIC (Idh7)y.h(,

L DOCUMENT NAME:nG:\\SEC\\97COM.LO3

~ To,eceh,e e copy of tNe document. Indicate in the hos *C* = Copy without ettech/enci *[* a Copy w6th attacNonct *N' = No copy Of?lCEi Rlil:

[

Rlli Krsek:Id Hiland M@

NAME DATE'

-111/q397

11/3/97 m

F aW E lh*

ippppppim

~

a

/

List of ' Attendees--

$ Cctober 1',1997

- ABB CENO Hematite Fuel Operations 'and U_.S. NRC Management _ Meeting =

'U.S.NRC Roy Conlane -

- Acting Director, Division of Nuclear Material Safety, Rill-Patrick Hilandf Chief, Fuel Cycle Branch, Rlli-Steven Bag 9ett

. Acting Chief, Materials inspection 2 Branch, Rlli

' Melanie Galloway.

Section Chief, Fuel Cycle Licensing Branch, NMSS Sean Soong -

. Program Manager, Fuel Cycle Licensing Branch, NMSS Courtney Blanchard -

Fuel Facilities inspector, Fuel Cycle Branch, Rlli

-[ABR CENO Hematite Fuel Ooerations

- Dr. Bruce Kaiser Vice President, Fuel Operations Jo'oert Sharkey -

Director, Regulatory Affairs

- Gil Page

' Director, Uranium Operations Don Hayduk Quality _ Manager -

Donald Underwood Engineering Manager

. Arlon Noack Maintenance Manager Hal Eskridge -

LSenior Consultant -

Robert Freeman Nuclear Criticality Specialist -

Earl Saito Health Physicist t-a i

s.

t-N

--a a

re-3

~

e-war

-y a

w fi Ty.rW--*y'-

c, /.

  • Agenda Periodic Management meeting between AEI)

' organintion. Kaiser CINO IIcenatite Puel Operations and the

  • synopsis of recent / futwo actions. Kaisa Nuclar Regulatory Cosaminsion
  • Facility / Process modiGcations.Pasa.

IIF Saubber.Page Qiticahty Saasty and ISA. Freenan / Sharkey gg gg

  • Regulainry Activity.Sharkey Self Assessment.Shwkey Fire Safety Propem.Sharkey
  • 20304 bwial ares plea.Sharkey
  • Ohw topice ofinternet CE/NRC Iwi= h Ass n-t T-ABB M semed 78.=

a.edenery AS.Ars

.my my

~

I=F-i== l m_.

i *= =- I

=
=:ll

.=.

.=

~

.=.

,=,

M

.~

7 l :::::

I j

l l

=

=

.=. I =.

1 l

~

1

?"- I 3 5.l 2E

- '=

+

  • b ABB ABB Ur i-s operess.es j._=_l RECENT / FUTURE ACTIONS p.q I -

. clean up pmjects

  • IIF mbber l M]}- -j iO_ l

- 41,000 ciade fe"

+ bulk chemical storage

- 1.1 neitiian possies

, pmder to PAM

.i l +s'-l il

.1

  • crit Safe 9 Pm8mn

. incinerator scrubba

=

=

.m- -

  • "8"**'"**"*"'

!=

  • shippingcontainerbid.

plant

  • retration ponds

+ upgraded data managemast ABB ARE I

i

1997 Stack Effluent 1997 Inspection EfTort e

8

,o- {iI~_[ _ mearere

$8

+ 97001 One violation-incorporating change rqmts.

+ 97002-Noviolations f

+ 97003 One violation - Lock and tag

+ 97201 One violation - not signing procedures e-E-

+ 97202 - Reactive, no violations - SSC E

  • 97203 - operations Scheduled for November 8

+ 97004 RIU / RU ???

,,,, m u c,.

+ Many IFIs and past violations closed gg 10 CFR 20,304 burial area 10 CFR 20.304 burial area cont.

  • 9/16/97 CE letter written 9/12 Update of

+ 9/l3/96 CE notification per IN 96-47 status of proposed burial area actions,

+ 11/25/96 NRC denial based onjustification meeting agenda for NRC/DNR 9/26

+ 1/24/97 CE requests additional time to meeting assess the disposal arei and a meeting 9/25/97 - NRC letter stating the CE has not

  • 4/24/9 s CE meets with NRC HQ to discuss submitted a decommissioning plan or proposed work plan (came to agreement on justification for delay approach due at end ofsummer)

+ 9/26/97 - CE holds joint meeting with NRC

+ May 97 publish

  • Regional and local Geologic and MoDNR to present"Hydrogeologic Summary at the Canbustion Engineering, investigation and Groundwater Monitoring licanatite. Missouri Plant -

ABB monitoring plan-ABB I

l l

l 10 CFR 20. 304 burial area cont.

FIRE SAFETY PROGRAM i

i

. ks.imind 6m ia.d.

sprirakr an.a sm wer l

+ 10/'.9/97 - Teleconfemnce wich Rlli and

. rwar.ne w mew

  • >*a i=Pecnaa sai

{

llQ concerning 9/25 NRC lettei m i. wincer = 4 Prmam==atenaace

(-

- Difurcated the issue safety assenewns include Hut work permit system a

6m safety rar wel&cs, cuning, mai

  • CE'a runne plaa

. f.censiw 6m dencnan snaare

  • NRC's fdlaw up action systeg idenh6 awe to
  • On<iw sn assistance

-- CE will submitjustiGcatica for dciey and the disas locatiar,s tema; au sigloyees "Hydrogeologic Investigation and Goundwater

  • Fim arus an dr6ned and anned to ime portable 6te Monitoring Monitoring Plan" by October 24th.

N

. %.usi,incss

  • Fxtenswe pataNo sre Sre. rcey extingh esmbu* ion ABB ABB 3

-