ML20212G045

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-128 on 861208-11.No Violation or Deviation Noted
ML20212G045
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/05/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20212G049 List:
References
NUDOCS 8701120252
Download: ML20212G045 (3)


See also: IR 05000424/1986128

Text

f&wb0

-

,.

JAN 0 51987

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

W TN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-128

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. G. Stoddart on December 8-11, 1986.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

.

8701120252 870105

'

PDR

ADOCK 05000424

G

PDR

,

\\

a

SE *l

.

Georgia Power Company

2

.cc w/ encl:

W . P. O'Reilly, Senior Vice President

Nuclear Operations

LSc E. Conway, Senior Vice President &

Project Director

M . Foster, Vice President, Project

Support

  1. D. Rice, Vice President, Project

E gineering

3

f.H.Pinson,VicePresident, Project

Construction

y . Beckham, Vice President,

Plant Hatch

d A. Thomas, Vice President,

_Jicensing

&D. S. Read, General Manager,

Quality Assurance

d W. Hayes, Vogtle Quality

ssurance Manager

. C. Ramsey, Manager -

g)ReadinessReview

B. Bockhold, General Manager,

luclear Operations

64.. Gucwa, Manager, Nuclear Safety

and Licensing

W H. Googe, Project

Construction Manager

E

D. Groover, Quality

p (Assurance Site Manager -

Construction

pY A. Bailey, Project Licensing

Manager

g F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

C W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

LErd.. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

LA E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

ulf G. Ledbetter, commissioner,

Department of Human Resources

LC H. Badger, Office of Planning

and Budget

p Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

d eig, Georgians Against

Nuclear Energy

(cc w/ encl cont'd - see page 3)

. .

--.

__

-

-_

.

-

_ _ _ - -

.

Georgia Power Company

3

(cc w/enci cont'd)

M t' B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

W 0. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

anel

. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

bec w/ encl:

W Reis, 0GC

E M. Hill, IE

J M iller, NRR

X 6rach, EDO

M. Sinkule, RII

E. Christnot, RII

MGC Resident Inspector

Document Control Desk

State of Georgia

RII

RI

RII$b

k

/

PGStod art:bhg

JK le

'

'

is

MSinkule

d

12P /86

6

12/ /86

12/3P/86

N8)

\\{V

l

l