Forwards Safety Evaluation of Water Hammer Events That Occurred During Transient Testing of Nuclear Svc Cooling Water Sys.Sys Functional Integrity & long-term Operational Capability Adequate
ML20212F520
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/08/1987
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20212F524 List:
References
NUDOCS 8701120040
Download: ML20212F520 (1)


Text

s, o

Occket No.: 50-424 8 JAN 1987 Nr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Corppany P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. O'Reilly:

Subject:

Transmittal of Evaluation of Vogtle Unit 1 Nuclear Service Cooling Water (NSCU) System Waterhammer Events Enclosed is the staff's evaluation of waterhammer events that occurred in the Vogtle Unit 1 NSCW system during transient testing. Based on our review, we conclude that the NSCW system functional integrity and long-term operational capability are adequate and therefore consider this issue resolved.

If there are any questions, contact me at (301) 492-7357.

Sincerely, Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page DISTRIBUTION:

5@ Docket.F1TeJ Local PDR NRC PDR PWR#4 Reading BJYoungblood Reading PMiller i MDuncan JPartlow BGrires U