Forwards Amend 15 to Beaver Valley Power Station Fsar. Action Item S12 Should Be Added to List of FSAR Changes Submitted W/Amend 13 Addressing S&W Engineering Assurance Audit 52
ML20212F209
Person / Time
Site: Beaver Valley
Issue date: 03/02/1987
From: Carey J
DUQUESNE LIGHT CO.
To: Tam P
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20212F215 List:
References
2NRC-7-033, 2NRC-7-33, NUDOCS 8703050046
Download: ML20212F209 (3)


Text

,.

I hl

'Af 2NRC-7-033 2

2 Be r Vall

o. 2 Unit Project Organization P.O. Box 328 March 2, 1987 Shippingport, PA 15077 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ATTENTION:

Mr. Peter Tan, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Final Safety Analysis Report - Amendment 15 Gentlemen:

Duquesne Light Company, acting on its own behalf and as agent for The Cleveland Electric Illuminating Coupany, Ohio Edison Company, and The Toledo Edison Canpany, is filing herewith three (3) signed originals plus sixty (60) copies of Anendment 15 to the Final Safety Analysis Report (FSAR) for the Bea-ver Valley Power Station Unit No. 2.

Attachment #1 provides a brief description of FSAR changes in this amend-ment which we believe could impact the staff's Safety Evaluation Report.

A lis, f FSAR changes which addressed itens related to the Stone and Weoster E ~ eering Corporation (SWEC) Engineering Assurance Audit No. 52 was submitted with Anendment 13.

Action Iten S12 (FSAR pages 3.8-33 and 34) should be added to this list per this anendment.

This infonnation is being provided in accordance with the request made by the NRC Office of Inspection and Enforcenent during the exit meeting of their final inspection of audit results and corrective actions on Septencer 25, 1986.

Please insert the revised Anendment 15 material into the FSAR as per the Amendment Instruction Sheet.

DUQUESNE LIGHT COMPANY

~

8703050046 870302 PDR ADOCK 05000412 K

PDR By

(/J arey D

Sr. Vic resident RWR/iar NR/RWR/ AMEND /15 n 0l Attachments AR/NAR I h cc:

E. Imbro, Section Chief, QA Branch, IE (w/ a)

H. Wang, Inspection Specialist, QA Branch, IE (w/a)

United States Nuclear Regulatory Conmission Final Safety Analysis Report - Amendment 15 Page 2 a

COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF BEAVER

)

On this

/ d day of Qh duF

./

, before me, a Notary P_ublic in and for said Canmonwealth. dnd - County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (1) he is Senior Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statenents set forth in the Submittal are true and correct to the best of his knowledge.

LLAd }??-

(AAAB~W

/

Notary Puolic SMENA E. FATTWE, MTARY PUBUC SHPPIREPWTWW SEAVERCOMff NT r$5WS$10N EIPIREI OCT. D.1989 sember.,Pennsywein Asseelaties of usenho

_p..

e>

Attachnent #1 -

Description FSAR Sections Changed SER Sections Affected Plant performance after-T1.8 14 MSIV closure & stean-t, extraction system and process canputer Safeguards ' contact area T2.5.4-4 T2.7 for bearing capacity Values of Ko (Coefficient of Lateral Earth Pressure 2.5.4.10 2.5.4.3.6 at Rest) for control room T2.5.4-5 extension and electric cable tunnel, and for lower punp cubicles of containment Turbine missiles T1.8 3.5.1.3 T1.9 3.5 F3.5-2, 3 & 4 0

10.2 Containment Spray Paramaters T6.5-4 6.5.2 F6.5-1 Containnent Atmosphere Cleanup 9.4 T11.2 Rate.

11.3 T11.3-2, 4, 6, 7 & 8 T12.2-23 & 24 Compaction of Compressible 11.4.2 11.4 waste material will be done F11.4-3 & 4 in the BVPS-2 waste handling building Radiation Monitoring System 11.5 11.5 T11.3 e

Organizational Structure 13.1 13.1 i