ML20212E326

From kanterella
Jump to navigation Jump to search
Notification of 971112 Meeting W/Listed Attendees in Rockville,Md to Discuss Issues Raised During Review of Responses to GL 92-01,Rev 1,Suppl 1.Agenda Encl
ML20212E326
Person / Time
Issue date: 10/29/1997
From: Wichman K
NRC (Affiliation Not Assigned)
To: Sullivan E
NRC (Affiliation Not Assigned)
References
GL-92-01, GL-92-1, NUDOCS 9711030151
Download: ML20212E326 (5)


Text

p -

. . _ , ~ __ _ . . _ _ _. . . . . . . . , . . . _ . _ _ _ _ __

, Octobsr 29, 1997 MEMORANDUM TU: Edmund J. Sullivan, Acting Chi;f h Materle's & Chemical Engineering Branch Division of Engir.eering FROM: - 'Keith R. Wichman, Chief /S/

I-Section A Materials & Chemical Engineering Branch Division of Engineering

SUBJECT:

MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) AND VESSEL OWNERS GR')UPS DATE & TIME: Wednesday, November 12,1997 1:00 p.m. - 5:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North Room T-8-A 1 11545 Rockville Pike  !

Rockville, MD 20852 2738 PURPOSE: To discuss issues raised during review of responses to Generic Letter 92 01, Revision 1, Supplement 1. See the attached agenda.

PARTICIPANTS: NBC UTIUTY J. R. Strosnider, NRR K. Cozens, NEl K. R. Wichman, NRR Owners Group Members et al. et al.

Attachment:

As stated cc: See attached list Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public,"

59 Federal Reaister 48344, 9/20/94. Members of the puolic who wish to attend should contact Barry Elliot at (301) 415-2709 (e-mail: bje@nrc. gov).

Distribution: See attached list DOCUMENT NAME: G:\ LEE \MTG_OG.WPD Te receive a copy of this document, Indicate in the box C = Copy w attachment / enclosure E= Copy with attachment / enclosure N = No copy '

EMCB m, lE EMCB _ lE EMQB;tpC' W l E. EMCB:(A)BC _lE O

Alee /8f , BElliot 69f KR%fo6er1in EJSullivan @M 10f/7/97 ~ 10ts/97 " D' g.

10$97 10/LS/97 u h 'k (v$ $

ggguE r:,m,v-n gr%j y g a .6 m g

~

9711030151 97102' PDR REV9P ERONUPRC Il.if'1.13,lill;iE, *l,Hl PDR *

]

e DISTRIBUTION: Meeting Notice with NEl and Owners Groups dated October 29. 1997 Hard Conv:

PUBLIC CENTRAL FILES' OGC ACRS Receptionist (OWFN and TWFN)

E-Mail

SJCollins (SJC1)

FMiraglia (FJM)

RZimraerman (RPZ)

GLainas (GCL)

JStrosnider (JRS2)

CCraig (CMC 1)

( SMagruder (SLM1)

JWilson (JHW1)

JBirmingham (JLB4)

MMalloy (MXM)

BElliot (BJE) 1 MMitchell (MAM4)

KKarwoski (KJK1)

} MKhanna (MKK)

SSheng (SHENG)

JMedoff (JXM)

. MMayfield (MEM2)

EHackett (EMH1)

BWSheron (SLM3)

OPA PMNS C BMcCabe, RI (BCM)

MTschiltz, Ril (MDT)

GTracy, Rlli (GMT)

THiltz, RIV (TGH)

JTWiggins (JTW1)

JPJoudon (JPJ)

GEGrant (GEG)

ATHowell (ATH)

HRC Participants m

e 5 - - - _ _ _ _ . . . . ..

,9 h

DRAFT AGENDA '

L INDUSTRY /NRC MEETING ON RESPONSES TO GENERIC LETTER 92-01, REVISION 1, SUPPLEMENT 1 NOVEMBER 12,1997

. l. Overview of licensee responses to GL 92 01, Rev.1, Supplement 1

11. Discussion of issues'affecting licensee estimate of RPV embrittlement a) Impact of irradiation temperature and/or NSSS vendor on surveillance data b) Impact cd chemical analyses documented in Frematome inspection data and CEOG '

Chemistry Data report on determining RPV embrittlement (the increase in reference temperature resulting from neutron irradiation) c) Impact of ratio procedure on determining RPV embrittlement d) Method of determining credibility.

Ill. Discussion of the use of plant-specific measured unirradiated reference temperature IV. Discussion of the schedule for licensees submittal of their assessment of the impact of chemistry data from Framatome and CEOG, irradiation temperature, and ratio procedure on f their RPV integrity analyses c

-V. Industry maintenance of reactor vesselintegrity database (RVID)

C ATTACHMENT

_____---_J

cc:

Project Nu _

b hr 689 Nuclear Energy institute .

- Kurt Cozens Mr.' Ch6,rles B. Brinkman, Director NEl ._

Nuclear Systems Licensing 17761. Street, NW ' ABS-Combustion Engineering, Inc.

Suite 400 ' Post Office Box 500 Washington D.C. 20006-3708- - 2000 Day Hill Road Windsor, Connecticut 06095 0500

- Proioct Number 894

. Westinghouse Owner's Group Mr. Ian C. Rickard, Director Operatiw, Licensing

- Mr. Nicholas Liparulo, Manager ABB-Combustion Engineering Regulatory and Engineering Networks Nuclear Operations Westinghouse Electric Corporation Post Office Box 500 Mail Stop ECE 4-15 2000 Day Hill Road FO Box 355 Windsor, Connecticut 06095-0500

- Pittsburgh, PA 15230-0355-Mr. Charles B. Brinkman, Manager

Mr. Andrew Drake, Projec' Manager Washington Nuclear Operations -

Westinghouse Owners Group. ~ 'ABB-Combustion Engineering, Inc.

' Westinghouse Electric Corporation 12300 Twinbrook Parkway, Suite 330 Mail Sto; ECE 516-- Rockville, Maryland 20852 PO Box 355-

- Pittsburgh, PA 15230-0355: Project Number 891 Boiling Water Reactor Owners Group Mr. Mark Beaumont

- Westinghouse Electric Corporation Thomas J. Rausch, Chairman -

One Montrose Metro. Boiling Water Reactor Owners' Group <

11921 Rockville Pike, Suite 450 Commonwealth Edison Company-  !

1Rockville,- MD 20L2 Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill Project Number 892 Downers Grove, IL 60515

. Combustion F.ngineering Owners Group Carl D. Terry 7 Mr. Gordon C. : Bishoff Vice President, Nuclear Engineering CEOG Project Manager Niagara Mohawk Power Corporation J ABB Combustion Engineering Nine Mile Point-2 t M.S. 9615-1932 - - PO Box 63 1000 Prospect Hill Road Lycoming, NY .13093 Windsor, CT-' 06095 Drew B. Fetters Mr. David Filmer, Chairman PECO Energy

- CE Owners Group Nuclear Group Headquarters

Southern California Edison MC 62C-3 Irvine Operations Center. 965 Chesterbrook Blvd.  !
Room 109C Wayne, PA 19087

- 23 Parker Street lIrvine, CA 92718

- - - - - - - - - - - . - - - - - .-u..

L ;' :

g' cc.Jcontinued):

John Hosner .

, Mr. W.W. Foster, Chairman -

Commonwealth Edison B&WOG Steering Committee -

Executive Towers,4th Floor . Director of Seroty Assurance-

- 1400 Opus Place Duke Power Company Downers Grove, IL~. 60515 Oconee Nuclear Station P.O. Box 1439 George T. Jones - . Seneca, SC 29679 -

Pennsylvanla Power & Light-MC A6-1 -. _

Mr. J.J. Kelly, Manager

.Two North Ninth Street Framatome Technologies, Inc.

Allentown, PA 18101 P.O. Box 10935 Lynchburg, VA 24506-0935

__ Lewis H. Sumner -

Southern Nuclear / Georgia Power E; l. Hatch Nuclear Power Plant U.S. Route 1 North, Box 439-

. Baxley, GA 31513
L. A. England Entergy Operations Inc.

PO Box 31995 Jackson, MS 39286 K. K. Sedney GE Nuclear Energy 175 Curtner Ave, M/C 182 San Jose, CA 95125-Project Number 893 Babcock & Wilcox Owners Group -

Mr. Robert W. Keaten, Chairman B&WOG Executive Committed Vice President & Director of Technical Functions GPU Nuclear Corporation

- One Upper Pond Road Parsippany, NJ 07054 Mr. R. B. Borsum, Manager

- Rockville Licensing Operations

Framatome Technologies, Inc.

1700 Rockville Pike Suite 525' Rockville, MD 20852-1631-Mr. F. McPhatter, Manager c- Framatome Cogema Fuels

-3315 Old Forest Road P.O. Box 10935 Lynchburg, VA 24506-0935

_ . . . . _____ a