_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

TENNESSEE VALLEY AUTHORITY

[

SEQUOYAH NUCLEAR PLANT

~

r-}-

) ADMINISTRATIVE INSTRUCTION AI-6 6 ,

LOG ENTRIES AND REVIEW r

s, Revision 10 li{

IF PREPARED BY: Walter M. Guinn Li i

RESPONSIBLE SECTION: Operations i.

- REVISED BY: Spencer M. Childers

" SUBMITTED BY: f , L n i.,

R onsib e S6c ~on Supervisor

,, QA STAFF CON URRENCE: (2 h L PORC REVIEW DATE: NOV 121988 O APPROVED BY: 36url Dw il, . Plapt Manager DATE APPROVED: NOV 121986

,q Reason for revision (include all Instruction Change Form Nos.): t,

,, Revised to satisfy CAR 86-07-036. Instruction reworked to make it more workable for Operations Section.

]_

  • )'

The last page of this instruction is number: 5 e

.J g3omaEE@R7

) P j

~

1

. SEQUOYAH NUCLEAR PLANT DISTRIBUTION OF PLANT INSTRUCTIONS INSTRUCTION CONTROLLED NUMBER UNCONTROLLED DISTRIBUTION DISTRIBUTION M

AI-06 ASE OFFICE. T8. EL 706

! ASST ELEC MTN SUPV PSS TRAINING OFFICE BUILDING SERVICES SUPERVISOR CHEMICAL UNIT SUPV n

CHIEF. NCLR TRNG BRANCH

,i CHIEF. NUC SAFETY STAFF PLANT MANAGER, 8FNP COMPLIANCE SUPV CONTROL ROOM q DESIGN PROJECT MANAGER i DPS0 SUPERVISOR ,

ELECT MTN SUPV

}

ELECTRIC SHOP

( DQA ENGG GROUP SUPV INPO. LU YARGER. MANAGER P ENGG SECTION SUPV s PSS OPERATIONS 8 HEALTH PHYSICS SUPV

  • INSTR ENGR (IM)

INSTR MTN SUPV SE TRAINING OFFICE p

INSTRUMENT SHOP HECH MTN CRAFT SUPV NCLR ENGG BRANCH MECH HTN ENGG #1 MECH MTN SUPV HGR OF PROJECT MGMT '

9 HDDIFICATIONS MANAGER

MTN SCHEDULING UNIT SUPV NMRG NUC SVS BRANCH COMPLEX E ONP DOC CTRL OPERATIONS SUPV PLANT MANAGER

-' PLANT MASTED FILE PSS SHIFT SUPV POWER STORE 5 ,wPV

,, PRODUCTION PLANNERS' 0FFICE PSS SUPV t

! OA STAFF SUPV (2)

QA SURVEILLANCE SECTION OUALITY ENGR SUPV RADIOCHEM LAB

  • -) RADWASTE-SB11 REACTOR UNIT SUPV RESIDENT NRC INSPECTOR SC CONTROL ROOM SITE DIRECTOR SQN SITE NES

' SUPPORT SERVICES SUPV PLANT MANAGER, WBNP (2)

SYSTEMS ENGG SUPV TECHNICAL SERVICES l

J l 4 d

M

)

ni t

__ -_O

SEQUOYAH NUCLEAR PLANT PLANT INSTRUCTION REVISION LOG 9

l r=

ADMINISTRATIVE INSTRUCTION AI-6 REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-

']

.I LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS) 7 09/12/84 ALL r] Revised to delete common ASE from

'g -

instructions for power block.

8 08/09/85 ALL Reformat - OS/6 to Wang conversion.

Revised to delete the SE and UO from -

logging the rad waste release the ASE &

U}

5 9 10/10/85 1 AUO will still 100 them.

Revised to satisfy CAR 86-07-36.

3 NOV 1 2 1986 Instruction reworked to maxe it more

,j 10 ALL workable for Operations Section.

9 ,

,,3 l

,)

- r),

.i

.J m

t,

o. <

I ,'

I P

0203L/mbs

.)

r t

..I

'9 '

SQN AI-6 Page 1

, Revision 10

}

1.0 PURPOSE t-To identify classifications required to maintain daily journals, information that should be entered, and to 73 provide guidelines for quality of journals to be t maintained.

I

2.0 REFERENCES

9

,j Technical Specification Section 6.10.

, 3.0 INSTRUCTIONS Ed 3.1 The following work stations / classifications shall maintain a daily journal on their assigned tours of 9 duty.

(a) Shift Engineer (SE) ,

) (b) Unit One --This log will be the daily journal of J

the Senior Reactor Operator (SRO), Lead Operator, and BOP operator.

c-(c) Unit Two - This log will be the daily journal of the SRO, Lead Operator and the BOP operator.

'1 i

(d) Switch Yard Operator - All entries to be made on central time.

,' l (e) Chemical Laboratory Analyst s .:

(f) Assistant Unit Operator (AUO) - At work stations

, as determinied by the operations supervisor -

-) (g) Turbine Buldling ASE

'l (h) STA

.)

The AUO logs will be used for information ONLY.

-. These logs shall not be used or maintained as part of il the Plants permanent records and are not subject to

-s audit.

1 0100A/ala

.. t

m SQN i

AI-6 Page 2

-. Revision 10 l

3.0 INSTRUCTIONS (continued) 3.2 Entry data:

I 3.2.1 Operations Section personnel will as a F]

i minimum enter into their journals records of the following:

3' (a) Critical data, i.e. reactor coolant I system (RCS) boron concentration, RCS average temperature, control rod posi- -

9 tion, power level, and time of data i;l (Unit 1 or Unit 2). UOs covering a significant change in power level and times at each power level (Technical n Specification (TS) 6.10) (SE and Unit 1 or Unit 2, as applicable).

(b) Gaseous and liquid release of

~] radioactive materials - (Unit 1 and Radwaste AUO).

eq (c) principal maintenance activities (appropriate journals dependent on work and location).

"I (d) Operational transients and trips (SE J

and applicable ~ unit log).

. r] (e) Any abnormal or unusual conditions j' expe.rienced during the shift. Entries made in the following journals as

' applicable to position Responsi-l bility: SE, Switchyard operator, Unit

) 1, Unit 2, and turbine building ASE;

'. -] (f) Operations within action times of

' I' Technical Specifications limiting conditions for operation (LCO).

_ ), SE - Any unplanned LCO entries / exits or planned LCO entries / exits with a duration or planned duration of longer m) than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

1

{ 0100A/ala 6

- . - - - - - - , - - - . - - - - - - - , - ~ _ , , . ~ . - - - . - , - . --..mn.~ wen-. - - , , , -,-

, - ,,---,---,,.-,--w-. ,mn.. - n,-----,-m . n,

SQN lI -

AI-6 Page 3 m Revision 10 1

e 3.0 INSTRUCTIONS (continued) 3.2 Entry data: (continued) r 3.2.1 (continued)

Unit 1, Unit 2 - all LCO entries shall be entered and exited on the "LCO I

Action Log" (Al-6 Appendix A). The

. 11-7 shift operator shall transfer all open (present) LCOs to a new LCO -

n Action Log sheet and attach this log 1 sheet to that dates Daily Journal.

Significant non-routine LCO entries

~

should be entered on the "LCO Action Log" and in the Daily Journal for L purposes of review prior to assuming shift. Common, routine LCOs need not ,

- be entered in both units' logs provided they are short term and the other units personnel are notified.

(Examples: DG's inop for rolling, 1 Cholorine det inop due to SI, RAD

j monitor blocks for Chem Lab servicing and or source check etc.)

.3 j (g) Significiant equipment malfunctions

, Entries made in the following journals tl as applicable to position responsi-

.I bility. SE - Unit 1, Unit 2 TB ASE switchyard operator - AUO.

'j (h) Equipment out of service for maintenance (appropriate journals as required to reflect plant activities).

J (i) AUOs should enter into their daily journal HpFP equipment which they m isolate for draining, etc. This entry shall include the time of isolation and the time of return to service.

'l 0100A/ala

..i i

r b

SQN l

  • AI-6 page 4 9 Revision 10 3.0 INSTRUCTIONS (continued) ol-

-l 3.2.2 The Chemical Laboratory Analyst shall enter into the daily journal nonroutine or Pl unusual events or activities encountered on j

his shift and special instructions from his t

supervisor or SE.

m 3.2.3 I

Any log entries, made by persons other than

'3 those listed on the log sheet as "on duty" should be initialed by the person making r the entry.

1.) 3.3 Quality of journals:

Journals are QA documents and are an important part

'- of plant operating history, therefore, the following guidelines shall be followed in their preparation and

_ maintenance:

Journals shall include date and name(s) of persons on duty.

,,z Entries shall be made in ink. Original and carbon copy shall be legible.

'l

,j Journals shall be made in duplicate and the original forwarded to supervisors each' day except for Sundays and holidays.

] 3.4 Review of journals,: ,

The personnel listed below should review the SE

,) journals daily and document their review by initials on the journal sheets:

r3 Plant Supt (Mtn) 1 Plant Supt (OLE)

Operations Supervisor 7 The significant entries will be discussed at the

[3 morning staff meeting.

.q This review should be completed no later than 3 calendar days from the date of the journal unless an individual is aLsent from the job for longer than 3 days.

a

, i 0100A/ala 1

s L

c- , ,

s.

.- c

~

. s -

! s s

3 -

~

9'  :

SQN i .

AI-6 Page 5 '

Revisioncl0 i

f Unit s

Date APPENDIX A ICO ACTION LOG ICOs TRANSI'ERED FROM PREVIOUS DAY l '

{  ;'

-1 ADDITIONAL SURVEILLANCE SYSTEM OR DATE AND TIE . DATE AND TIE REQUIREENTS WHILE IN ICO NUMBER 1, COMPONENT ACTION ENTERED ACTION EXITED ACTION TIME

/

1)

~

2) 3)

)

4) 5)

- 6 )_

8)

'd ICOs ENTI* RED & EXITED TODAY

) , '

1)

2) '

t

3) '
4) '

5) q 6)-

g 7) 8)

9)_

10)

,, 11) 12)

, q 13)

.. 14) . _. .

J 15)

! *1

. .i 0498A/vic i

t