ML20212B809
| ML20212B809 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/19/1986 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20212B813 | List: |
| References | |
| NUDOCS 8612290320 | |
| Download: ML20212B809 (2) | |
See also: IR 05000327/1986059
Text
(%Q
,
.
DEC 191986
Docket Nos. 50-327, 50-328
Tennessee Valley Authority
/TTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
.
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-327/86-59 AND 50-328/86-59)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
B. R. Crowley on October 20-24, 1986.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Nk b
7
%j%%c
h
Gary G. Zech Director
Division of TVA Projects
Enclosures:
(Seepage 2)
!
\\ (\\
.scol
-
-
.
-
,
- '
2
DEC 19
i
Tennessee Valley Authority
2
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
&H. L. Abercrombie, Site Director
Sequoyah Nuclear Plant
- -1. R. Wallace, Plant Manager
R. W. Cantrell, Acting Director
Nuclear Engineering
C R. L. Gridley, Director
Nuclear Safety and Licensing
DN. R. Harding, Site Licensing
Manager
bec w/encls:
PJ. N. Grace, RII
L-H. R. Denton, NRR
LH. L. Thompson, NRR
&J. M. Taylor, IE
6 8. B. Hayes, 0I
tS. R. Connelly, OIA
44. P. Barr, RII
v NRC Resident Inspector
NRC Document Control Desk
State of Tennessee
9g
RI
RI
RII
RII
(,,,,
BRC owley:bhg
J
ke
Aberdt
- /
j#[.[Mj
[Bacr
"
O./ /86
I
f 3/86
13/3 /86
6
/86
l )i U
IdhlQ
'
l
- .
.
- -
-