ML20212B791
| ML20212B791 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/05/1986 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 8608070228 | |
| Download: ML20212B791 (3) | |
Text
-
s AUG 0 51986 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101
Dear Mr. Edelman:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation on August 4, 1986, between Mr. R. Tadych, Training Supervisor, and Mr. D. Hills, NRC Region III Examiner, arrangements were made for an evaluation of the requalification program at the Perry Nuclear Power Station. The evaluation visit is scheduled for the week of October 27, 1986.
For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for those examinations. For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by August 27, 1986. Mr. Tadych has been advised of our reference material requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989. Connents on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.
8608070228 86080S PDR ADOCK 05000440 q
V PDR ser+
AUG 0 51986 The Cleveland Electric 2
Illuminating Company Thank you for your consideration in this matter.
If you have any questions on the evaluation process, please contact D. Hills at 312-790-5600.
Sincerely, Original signed by M. A. Ring.for:
4, Charles W. Hehl, Chief Operations Branch
Enclosure:
As stated cc w/ enclosure:
F. R. Stead, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department E. M. Buzzelli, General Supervising Engineer, Nuclear Licensing and Compliance Section R. Tadych, Training Supervisor DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health cc w/o enclosure:
J. J. Stefano, Project Manager, NRR i'.. A. Boger, Branch Chief, OLB Yes RIII RIII RIII RIII g..
RIII Afel BEN ? M sc 2
tbf q
hi4 Hills /mab lop Hehl Ch rissotimos 08/04/86
1 o
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION 1.
All administrative procedures (as applicable to reactor operation or safety) 2.
All integrated plant procedures (normal or general operating procedures) 3.
Emergency procedures (emergency instructions, abnormal, or special procedures) 4.
Standing orders (important orders which are safety-related and may supersede the regular procedures) 5.
Fuel-handling and core-loading procedures (initial core-loading procedure, whenappropriate) 6.
Annunciator procedures (alarm procedures, including set points) 7.
Radiation protection manual (radiation control manual or procedures) 8.
Technical opecifications
- 10. Lesson plans (training manuals, plant orientation manual, systems descriptions)
- 11. Systems operating procedures
- 12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years
- 14. An index of administrative, operating, abnormal and emergency procedures
- 15. Plant technical data (curve) book
- 16. Simulator malfunction list with descriptive sunt,ary of malfunction effects.
All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
- -., - -.