Forwards Safety Insp Repts 50-456/86-64 & 50-457/86-48 on 861209-11.No Violations Noted
ML20212B751
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/23/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212B755 List:
References
NUDOCS 8612290309
Download: ML20212B751 (2)


See also: IR 05000456/1986064

Text

,

O

DEC 2 31986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by J. H. Neisler of

this office on December 9-11, 1986, of activities at Braidwood Station, Units 1

and 2, authorized by NPF-59 and CPPR-133 and to the discussion of our findings

with Mr. P. Barnes and other members of yuur staff at tb conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by James W. Muf fett (for)

J. J. Harrison, Chief

G

Engineering Branch

Enclosure:

Inspection Reports

No. 50-456/86064(DRS); and

No. 50-457/86048(DRS)

See Attached Distribution

RIII

y I,

RIII

RIII

j e tA &

Uc

'r

J# b

WM.(q

Neisler/ims

Li

le

Muffett

Harriso

_j2/22/g

/2/n/gb

n/b/et

W[z 2 cc

-n= Q /

-

-

.

.

Commonwealth Edison Company

2

DEC 2 31986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Qual *'v Assurance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, 0GC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Ca11than, ASLB

The Honorable Richard F. Cole, ASLB

)